Fill and Sand Wood Surfaces
From How to Cover Waterfall-Style Stairs with Treads · Step 8 of 9 · Video by Dani Lyn Design

Showing 6:57–8:12 of the source video. Watch the full video with every moment.
What happens in this clip
After all treads and risers are installed, use wood filler to fill in any gaps, nail holes, or imperfections. The video creator used a small metal putty knife for precise application in corners and used her finger for nail holes. Allow the wood filler to dry completely according to manufacturer instructions. Once dry, sand all surfaces of the stair treads smooth. Pay particular attention to the areas with wood filler and any rough edges. The creator used a Ryobi multi-oscillating tool with a sanding attachment for tight corners and a standard sander for the main surfaces.
Goal: Achieve a smooth, uniform surface on all stair treads and risers.
What's used
Tools
- Metal Putty Knife Anvil
- especially in corners.
- Ryobi Multi-Oscillating Tool Ryobi
- Sanding block
- Shop-vac
- Standard Sander
- Hand sanding block
- flat surfaces of the treads.
- Wood Filler
- gaps
- and imperfections. (Example cost: $11.58).
About the full video
This project details the step-by-step process of transforming carpeted stairs into stained wooden stairs. It covers the removal of old carpet, replacement of damaged treads, preparation of the wood surfaces, application of an oil-based stain and a protective top coat, and finishing with painted risers and caulking for a clean, modern look.
Step 8 of 9: Fill and Sand Fastener Holes
Using a putty knife, fill all pre-drilled screw holes and nail holes with a color-matched wood filler or a universal wood filler that can be stained. Allow the filler to dry completely according to the manufacturer's instructions. Once dry, lightly sand the filled areas until they are flush and smooth with the surrounding tread surface. Then, sand the entire surface of all newly installed treads to ensure a uniform smoothness, paying attention to edges and any rough spots. Feather sand any areas where new treads meet existing ones.
Every video in How to Cover Waterfall-Style Stairs with Treads
Step 1: Inspect Existing Treads and Risers
- 0:04–1:28 Assess Existing Staircase & Components
- 0:00–0:13 Assess Existing Stairs and Planning
- 1:02–1:35 Visually Inspect for Staircase Wear and Damage
Step 2: Measure and Template for New Treads
- 0:41–1:06 Measure and Mark Treads
- 0:55–1:05 Measure and Cut First Tread
- 0:18–0:49 Measure Stair Tread and Riser
Step 3: Cut New Treads
- 4:34–5:55 Measure and Cut Treads
- 0:43–0:52 Measure and Cut New Treads
- 7:06–9:20 Mark & Cut New Treads/Risers
Step 4: Prepare Existing Surfaces
- 7:20–7:47 Prepare Existing Stairs for Installation
- 1:40–2:44 Prepare Surface by Filling Holes
- 0:12–0:18 Sand & Prepare Stair Surfaces
Step 5: Dry Fit New Treads
- 19:07–19:52 Dry-Fit and Test Treads
- 1:46–2:21 Install First Tread
- 6:45–8:03 Install New Treads and Secure with Shims/Glue/Nails
Step 6: Apply Adhesive and Fasteners
- 2:32–3:28 Install First Tread and Riser
- 3:28–6:52 Install Remaining Treads and Risers
- 9:53 Install New Treads
Step 7: Install Waterfall Risers/Returns (if applicable)
- 15:24–19:11 Install Risers and Treads
- 1:04–1:15 Install Risers (Counter Stairs)
- 12:53–14:48 Addressing Exposed Staircase Ends
Step 8: Fill and Sand Fastener Holes
- 4:25–4:47 Fill Gaps and Nail Holes
- 3:59–4:48 Apply Wood Filler and Sand
- 6:57–8:12 Fill and Sand Wood Surfaces (this video)
Step 9: Apply Finish to Treads
- 1:18–1:37 Stain Stair Treads
- 0:39–0:43 Stain New Treads
- 6:17–7:17 Stain and Seal Treads
How to Cover Waterfall-Style Stairs with Treads
This project outlines the process of covering waterfall-style stairs with new treads. Waterfall stairs have treads that extend beyond the riser, creating an open side. This project focuses on installing new treads over existing ones, potentially for aesthetic updates or to repair worn surfaces.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

