Prepare Existing Stairs for Installation
From How to Cover Waterfall-Style Stairs with Treads · Step 4 of 9 · Video by Bent's Woodworking

Showing 7:20–7:47 of the source video. Watch the full video with every moment.
What happens in this clip
Before installing the new riser and tread pieces, sand the existing wooden stair treads with 80-grit sandpaper to rough up the surface. This creates a better bonding surface for the adhesive and helps remove any paint drips. Thoroughly vacuum all dust and debris from the stairs to ensure a clean surface.
Goal: Optimize existing stair treads for adhesive bonding
What's used
Tools
- Random Orbital Sander Festool
- Vacuum Festool
Materials
- 80-grit Sandpaper
About the full video
This project details the process of renovating a staircase by removing old carpet, preparing the wooden treads and risers, and installing new luxury vinyl plank (LVP) flooring with matching nose molding. It covers tasks from demolition and surface preparation to precise cutting, painting, and final installation of the new stair components.
Step 4 of 9: Prepare Existing Surfaces
Clean the existing treads and risers to remove all dust, dirt, grease, and debris. If there are any small holes or imperfections, fill them with wood filler or epoxy and allow them to dry completely. Lightly sand any high spots or uneven areas on the existing surfaces to create a smooth plane. If the existing treads have a slippery finish, lightly scuff-sanding them can provide better adhesion for any adhesive used.
Every video in How to Cover Waterfall-Style Stairs with Treads
Step 1: Inspect Existing Treads and Risers
- 0:04–1:28 Assess Existing Staircase & Components
- 0:00–0:13 Assess Existing Stairs and Planning
- 1:02–1:35 Visually Inspect for Staircase Wear and Damage
Step 2: Measure and Template for New Treads
- 0:41–1:06 Measure and Mark Treads
- 0:55–1:05 Measure and Cut First Tread
- 0:18–0:49 Measure Stair Tread and Riser
Step 3: Cut New Treads
- 4:34–5:55 Measure and Cut Treads
- 0:43–0:52 Measure and Cut New Treads
- 7:06–9:20 Mark & Cut New Treads/Risers
Step 4: Prepare Existing Surfaces
- 7:20–7:47 Prepare Existing Stairs for Installation (this video)
- 1:40–2:44 Prepare Surface by Filling Holes
- 0:12–0:18 Sand & Prepare Stair Surfaces
Step 5: Dry Fit New Treads
- 19:07–19:52 Dry-Fit and Test Treads
- 1:46–2:21 Install First Tread
- 6:45–8:03 Install New Treads and Secure with Shims/Glue/Nails
Step 6: Apply Adhesive and Fasteners
- 2:32–3:28 Install First Tread and Riser
- 3:28–6:52 Install Remaining Treads and Risers
- 9:53 Install New Treads
Step 7: Install Waterfall Risers/Returns (if applicable)
- 15:24–19:11 Install Risers and Treads
- 1:04–1:15 Install Risers (Counter Stairs)
- 12:53–14:48 Addressing Exposed Staircase Ends
Step 8: Fill and Sand Fastener Holes
- 4:25–4:47 Fill Gaps and Nail Holes
- 3:59–4:48 Apply Wood Filler and Sand
- 6:57–8:12 Fill and Sand Wood Surfaces
Step 9: Apply Finish to Treads
- 1:18–1:37 Stain Stair Treads
- 0:39–0:43 Stain New Treads
- 6:17–7:17 Stain and Seal Treads
How to Cover Waterfall-Style Stairs with Treads
This project outlines the process of covering waterfall-style stairs with new treads. Waterfall stairs have treads that extend beyond the riser, creating an open side. This project focuses on installing new treads over existing ones, potentially for aesthetic updates or to repair worn surfaces.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

