Assess Existing Stairs and Planning
From How to Cover Waterfall-Style Stairs with Treads · Step 1 of 9 · Video by Project Junkeez

Showing 0:00–0:13 of the source video. Watch the full video with every moment.
What happens in this clip
Before commencing any structural work, it's crucial to thoroughly assess the existing stair structure. The video highlights that these stairs previously had carpet, which implies a need for meticulous cleaning of staples, tack strips, and adhesive residues. The goal is to prepare the sub-structure for new, solid wood treads and risers, which will eventually be stained. The existing treads may have a 'lip' that needs to be addressed for a flush finish with new components.
Goal: The video begins by showcasing the stairs in their pre-renovation state, emphasizing the significant preparation needed. The stairs previously had carpet, which has been removed, revealing existing wooden treads and risers, some of which are likely painted or previously finished.
About the full video
This video details the extensive preparation required for a stair renovation, focusing on structural modifications and surface readiness before any finishing work, such as applying oil-based stain. It covers removing existing carpet and its residue, modifying baluster heights, and reinforcing the structure for new posts and treads.
Step 1 of 9: Inspect Existing Treads and Risers
Carefully examine each existing stair tread and riser. Look for any signs of damage such as cracks, splits, or deep gouges. Check if any treads or risers are loose, squeaky, or wobbly. Identify any areas of rot, water damage, or delamination, particularly on the edges and undersides. Note any areas that appear uneven or out of level, as these will need to be addressed before new treads are installed.
Every video in How to Cover Waterfall-Style Stairs with Treads
Step 1: Inspect Existing Treads and Risers
- 0:04–1:28 Assess Existing Staircase & Components
- 0:00–0:13 Assess Existing Stairs and Planning (this video)
- 1:02–1:35 Visually Inspect for Staircase Wear and Damage
Step 2: Measure and Template for New Treads
- 0:41–1:06 Measure and Mark Treads
- 0:55–1:05 Measure and Cut First Tread
- 0:18–0:49 Measure Stair Tread and Riser
Step 3: Cut New Treads
- 4:34–5:55 Measure and Cut Treads
- 0:43–0:52 Measure and Cut New Treads
- 7:06–9:20 Mark & Cut New Treads/Risers
Step 4: Prepare Existing Surfaces
- 7:20–7:47 Prepare Existing Stairs for Installation
- 1:40–2:44 Prepare Surface by Filling Holes
- 0:12–0:18 Sand & Prepare Stair Surfaces
Step 5: Dry Fit New Treads
- 19:07–19:52 Dry-Fit and Test Treads
- 1:46–2:21 Install First Tread
- 6:45–8:03 Install New Treads and Secure with Shims/Glue/Nails
Step 6: Apply Adhesive and Fasteners
- 2:32–3:28 Install First Tread and Riser
- 3:28–6:52 Install Remaining Treads and Risers
- 9:53 Install New Treads
Step 7: Install Waterfall Risers/Returns (if applicable)
- 15:24–19:11 Install Risers and Treads
- 1:04–1:15 Install Risers (Counter Stairs)
- 12:53–14:48 Addressing Exposed Staircase Ends
Step 8: Fill and Sand Fastener Holes
- 4:25–4:47 Fill Gaps and Nail Holes
- 3:59–4:48 Apply Wood Filler and Sand
- 6:57–8:12 Fill and Sand Wood Surfaces
Step 9: Apply Finish to Treads
- 1:18–1:37 Stain Stair Treads
- 0:39–0:43 Stain New Treads
- 6:17–7:17 Stain and Seal Treads
How to Cover Waterfall-Style Stairs with Treads
This project outlines the process of covering waterfall-style stairs with new treads. Waterfall stairs have treads that extend beyond the riser, creating an open side. This project focuses on installing new treads over existing ones, potentially for aesthetic updates or to repair worn surfaces.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

