powered by

Screed the Concrete Surface

From How to Pour a Concrete Landing Pad for Deck Stairs · Step 6 of 10 · Video by Mike Day Concrete (Everything About Concrete)

Showing 0:24–1:01 of the source video. Watch the full video with every moment.

What happens in this clip

Once the concrete has been roughly spread, use a long, straight screed board (which can be a piece of dimensional lumber like a 2x4, or a specialized aluminum screed) to level the surface. Position the screed board across the formwork, ensuring its ends rest securely on the top edges of the forms. Move the screed board back and forth in a sawing motion, while simultaneously pulling it forward across the concrete. This action effectively removes any high spots of concrete and fills in any low spots, ensuring a consistently flat and level surface across the entire slab. Repeat this process as needed until the entire slab meets the desired grade and consistency.

Goal: Achieve a flat and level concrete surface.

What's used

Tools

  • Rubber Boots
  • Screed Board
  • Aluminum straight board
  • 2x4 lumber
  • Work Gloves

Materials

  • Wet Concrete

About the full video

This project details the initial phase of installing a concrete slab, involving the efficient delivery of wet concrete via heavy machinery, followed by manual spreading and precise screeding to achieve a flat and level surface. This prepared slab is intended to serve as a sturdy foundation for outdoor living spaces such as a hot tub pad or a patio area, designed for cookouts and relaxation.

What's said in this clip

I'm getting the edges mag. Darren and Tia breaking down the concrete, getting it leveled out with the rakes. And then I'm going to jump right on the screed and get it screeded. The homeowner's going to end up putting a a nice hot tub on this part, this section here. So they're going to have a I don't know, like an eight-person hot tub on it. And then, you know, the other slab will be like a little bit of a sitting area, like a patio area where they have their cookouts and stuff like that. So once they get all the the slab areas done and landscaping done, it's going to be a pretty nice-looking area in the back.

Automatically transcribed from the source video.

Step 6 of 10: Screed the Concrete

Using a straight piece of lumber (such as a 2x4) as a screed board, rest it on top of the 2x6 formwork. Move the screed board back and forth in a sawing motion across the surface of the wet concrete, dragging excess concrete with it and filling low spots. This process levels the concrete to the height of the form.

Open this step in the guide

Every video in How to Pour a Concrete Landing Pad for Deck Stairs

  1. Step 1: Excavate Area

  2. Step 2: Install Formwork

  3. Step 3: Add and Compact Gravel Base

  4. Step 4: Place Rebar or Wire Mesh

  5. Step 5: Mix and Pour Concrete

  6. Step 6: Screed the Concrete

  7. Step 7: Float the Concrete

  8. Step 8: Finish the Concrete

  9. Step 9: Cure the Concrete

  10. Step 10: Remove Formwork

How to Pour a Concrete Landing Pad for Deck Stairs

This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Screed the Concrete Surface — How to Pour a Concrete Landing Pad for Deck Stairs | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.