Screed the Concrete Surface
From How to Pour a Concrete Landing Pad for Deck Stairs · Step 6 of 10 · Video by Mike Day Concrete (Everything About Concrete)

Showing 0:24–1:01 of the source video. Watch the full video with every moment.
What happens in this clip
Once the concrete has been roughly spread, use a long, straight screed board (which can be a piece of dimensional lumber like a 2x4, or a specialized aluminum screed) to level the surface. Position the screed board across the formwork, ensuring its ends rest securely on the top edges of the forms. Move the screed board back and forth in a sawing motion, while simultaneously pulling it forward across the concrete. This action effectively removes any high spots of concrete and fills in any low spots, ensuring a consistently flat and level surface across the entire slab. Repeat this process as needed until the entire slab meets the desired grade and consistency.
Goal: Achieve a flat and level concrete surface.
What's used
Tools
- Rubber Boots
- Screed Board
- Aluminum straight board
- 2x4 lumber
- Work Gloves
Materials
- Wet Concrete
About the full video
This project details the initial phase of installing a concrete slab, involving the efficient delivery of wet concrete via heavy machinery, followed by manual spreading and precise screeding to achieve a flat and level surface. This prepared slab is intended to serve as a sturdy foundation for outdoor living spaces such as a hot tub pad or a patio area, designed for cookouts and relaxation.
What's said in this clip
I'm getting the edges mag. Darren and Tia breaking down the concrete, getting it leveled out with the rakes. And then I'm going to jump right on the screed and get it screeded. The homeowner's going to end up putting a a nice hot tub on this part, this section here. So they're going to have a I don't know, like an eight-person hot tub on it. And then, you know, the other slab will be like a little bit of a sitting area, like a patio area where they have their cookouts and stuff like that. So once they get all the the slab areas done and landscaping done, it's going to be a pretty nice-looking area in the back.
Automatically transcribed from the source video.
Step 6 of 10: Screed the Concrete
Using a straight piece of lumber (such as a 2x4) as a screed board, rest it on top of the 2x6 formwork. Move the screed board back and forth in a sawing motion across the surface of the wet concrete, dragging excess concrete with it and filling low spots. This process levels the concrete to the height of the form.
Every video in How to Pour a Concrete Landing Pad for Deck Stairs
Step 1: Excavate Area
- 13:17–15:33 Prepare Stair Base and Pour Concrete Pad
- 0:04–0:15 Site Preparation and Trench Digging
- 4:20–8:36 Prepare & Pour Concrete Pad
Step 2: Install Formwork
- 2:04–2:33 Build and Position Concrete Form
- 0:33–0:47 Formwork Installation
- 0:00–0:34 Lay Out and Assemble Initial Form Boards
Step 3: Add and Compact Gravel Base
- 2:21–2:33 Add & Compact Basecourse
- 3:15–4:05 Lay and Compact Gravel Base
- 0:20–0:38 Prepare Gravel Base
Step 4: Place Rebar or Wire Mesh
- 2:45–3:06 Add Steel Reinforcement (Rebar)
- 1:30–1:40 Add Wire Mesh Reinforcement
- 5:41–6:46 Rebar Placement for Reinforcement
Step 5: Mix and Pour Concrete
- 0:30–0:42 Pour and Level Concrete
- 3:10–3:41 Pour and Screed Concrete
- 1:58–2:31 Mix and Pour Concrete
Step 6: Screed the Concrete
- 0:04–0:13 Screed the Concrete
- 0:24–1:01 Screed the Concrete Surface (this video)
- 0:17–0:45 Screed the Concrete Surface
Step 7: Float the Concrete
- 0:16–0:25 Float the Concrete Surface
- 0:44–0:46 Hand Float Concrete Surface
- 1:15–1:29 Float Concrete
Step 8: Finish the Concrete
- 0:07–0:11 Trowel for Smooth Concrete Finish
- 10:04–11:22 Final Troweling and Finishing
- 3:30–4:49 Concrete Floating and Troweling
Step 9: Cure the Concrete
- 2:08–2:39 Cure Concrete
- 0:57–0:59 Cure Concrete and Remove Forms
- 5:50–6:12 Cure the Concrete
Step 10: Remove Formwork
- 8:43–10:04 Remove Form and Backfill
- 4:03–4:08 Remove Formwork
- 0:52–0:54 Remove Formwork
How to Pour a Concrete Landing Pad for Deck Stairs
This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

