From How to Pour a Concrete Landing Pad for Deck Stairs · Step 10 of 10 · Video by The Fixer

Showing 8:43–10:04 of the source video. Watch the full video with every moment.

What happens in this clip

After at least 24 hours of curing, it's safe to remove the wooden form. Begin by digging out any loose dirt around the exterior of the form with a shovel. Use a hammer and pry bar to gently separate the form boards from the concrete. Apply outward pressure on the form before lifting it away to avoid chipping or damaging the freshly set concrete edges. Once the form is removed, backfill the remaining trench around the concrete pad with dirt and topsoil, using a rake and shovel to make the area flush with the top of the pad and surrounding ground.

Goal: Remove the wooden form and fill the surrounding area with dirt

What's used

Tools

  • Hammer
  • Pry Bar
  • Rake
  • Shovel

Materials

  • Dirt
  • Topsoil

About the full video

This project details the process of building a concrete pad for deck stairs, ensuring it's level with the ground and properly cured. It covers planning, building and setting forms, excavating, pouring, and finishing the concrete.

Step 10 of 10: Remove Formwork

Once the concrete has cured sufficiently (typically after 24-48 hours, but check local conditions and concrete type), carefully pry off the 2x6 lumber forms. Use a pry bar to gently loosen the forms from the concrete. Be careful not to chip or damage the edges of the concrete pad.

Open this step in the guide

Every video in How to Pour a Concrete Landing Pad for Deck Stairs

  1. Step 1: Excavate Area

  2. Step 2: Install Formwork

  3. Step 3: Add and Compact Gravel Base

  4. Step 4: Place Rebar or Wire Mesh

  5. Step 5: Mix and Pour Concrete

  6. Step 6: Screed the Concrete

  7. Step 7: Float the Concrete

  8. Step 8: Finish the Concrete

  9. Step 9: Cure the Concrete

  10. Step 10: Remove Formwork

How to Pour a Concrete Landing Pad for Deck Stairs

This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Remove Form and Backfill — How to Pour a Concrete Landing Pad for Deck Stairs | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.