Remove Form and Backfill
From How to Pour a Concrete Landing Pad for Deck Stairs · Step 10 of 10 · Video by The Fixer

Showing 8:43–10:04 of the source video. Watch the full video with every moment.
What happens in this clip
After at least 24 hours of curing, it's safe to remove the wooden form. Begin by digging out any loose dirt around the exterior of the form with a shovel. Use a hammer and pry bar to gently separate the form boards from the concrete. Apply outward pressure on the form before lifting it away to avoid chipping or damaging the freshly set concrete edges. Once the form is removed, backfill the remaining trench around the concrete pad with dirt and topsoil, using a rake and shovel to make the area flush with the top of the pad and surrounding ground.
Goal: Remove the wooden form and fill the surrounding area with dirt
What's used
Tools
- Hammer
- Pry Bar
- Rake
- Shovel
Materials
- Dirt
- Topsoil
About the full video
This project details the process of building a concrete pad for deck stairs, ensuring it's level with the ground and properly cured. It covers planning, building and setting forms, excavating, pouring, and finishing the concrete.
Step 10 of 10: Remove Formwork
Once the concrete has cured sufficiently (typically after 24-48 hours, but check local conditions and concrete type), carefully pry off the 2x6 lumber forms. Use a pry bar to gently loosen the forms from the concrete. Be careful not to chip or damage the edges of the concrete pad.
Every video in How to Pour a Concrete Landing Pad for Deck Stairs
Step 1: Excavate Area
- 13:17–15:33 Prepare Stair Base and Pour Concrete Pad
- 0:04–0:15 Site Preparation and Trench Digging
- 4:20–8:36 Prepare & Pour Concrete Pad
Step 2: Install Formwork
- 2:04–2:33 Build and Position Concrete Form
- 0:33–0:47 Formwork Installation
- 0:00–0:34 Lay Out and Assemble Initial Form Boards
Step 3: Add and Compact Gravel Base
- 2:21–2:33 Add & Compact Basecourse
- 3:15–4:05 Lay and Compact Gravel Base
- 0:20–0:38 Prepare Gravel Base
Step 4: Place Rebar or Wire Mesh
- 2:45–3:06 Add Steel Reinforcement (Rebar)
- 1:30–1:40 Add Wire Mesh Reinforcement
- 5:41–6:46 Rebar Placement for Reinforcement
Step 5: Mix and Pour Concrete
- 0:30–0:42 Pour and Level Concrete
- 3:10–3:41 Pour and Screed Concrete
- 1:58–2:31 Mix and Pour Concrete
Step 6: Screed the Concrete
- 0:04–0:13 Screed the Concrete
- 0:24–1:01 Screed the Concrete Surface
- 0:17–0:45 Screed the Concrete Surface
Step 7: Float the Concrete
- 0:16–0:25 Float the Concrete Surface
- 0:44–0:46 Hand Float Concrete Surface
- 1:15–1:29 Float Concrete
Step 8: Finish the Concrete
- 0:07–0:11 Trowel for Smooth Concrete Finish
- 10:04–11:22 Final Troweling and Finishing
- 3:30–4:49 Concrete Floating and Troweling
Step 9: Cure the Concrete
- 2:08–2:39 Cure Concrete
- 0:57–0:59 Cure Concrete and Remove Forms
- 5:50–6:12 Cure the Concrete
Step 10: Remove Formwork
- 8:43–10:04 Remove Form and Backfill (this video)
- 4:03–4:08 Remove Formwork
- 0:52–0:54 Remove Formwork
How to Pour a Concrete Landing Pad for Deck Stairs
This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.