Cure the Concrete
From How to Pour a Concrete Landing Pad for Deck Stairs · Step 9 of 10 · Video by Sakrete Canada | Home Improvement Products

Showing 5:50–6:12 of the source video. Watch the full video with every moment.
What happens in this clip
Under normal weather conditions, allow the concrete to set for one day. To aid curing and prevent premature drying, keep the concrete moist for at least three days by occasionally spraying a fine mist of water on the surface. Additionally, cover the concrete with a plastic sheet or a piece of wet burlap to help retain moisture and promote proper curing.
Goal: Ensure proper curing of the concrete for maximum strength
What's used
Tools
- Spray Bottle
Materials
- Clean Water
- Plastic Sheet
About the full video
This video provides a step-by-step guide to constructing a concrete walkway using various Sakrete concrete mixes. It covers site preparation, building the formwork, laying a crushed stone base, mixing concrete, pouring, leveling, finishing, adding expansion joints, and curing the concrete.
Step 9 of 10: Cure the Concrete
Keep the concrete moist for at least 3 to 7 days after pouring. You can achieve this by covering it with plastic sheeting, burlap bags kept constantly wet, or by periodically misting the surface with water. Proper curing is critical for the concrete to reach its designed strength and durability.
Every video in How to Pour a Concrete Landing Pad for Deck Stairs
Step 1: Excavate Area
- 13:17–15:33 Prepare Stair Base and Pour Concrete Pad
- 0:04–0:15 Site Preparation and Trench Digging
- 4:20–8:36 Prepare & Pour Concrete Pad
Step 2: Install Formwork
- 2:04–2:33 Build and Position Concrete Form
- 0:33–0:47 Formwork Installation
- 0:00–0:34 Lay Out and Assemble Initial Form Boards
Step 3: Add and Compact Gravel Base
- 2:21–2:33 Add & Compact Basecourse
- 3:15–4:05 Lay and Compact Gravel Base
- 0:20–0:38 Prepare Gravel Base
Step 4: Place Rebar or Wire Mesh
- 2:45–3:06 Add Steel Reinforcement (Rebar)
- 1:30–1:40 Add Wire Mesh Reinforcement
- 5:41–6:46 Rebar Placement for Reinforcement
Step 5: Mix and Pour Concrete
- 0:30–0:42 Pour and Level Concrete
- 3:10–3:41 Pour and Screed Concrete
- 1:58–2:31 Mix and Pour Concrete
Step 6: Screed the Concrete
- 0:04–0:13 Screed the Concrete
- 0:24–1:01 Screed the Concrete Surface
- 0:17–0:45 Screed the Concrete Surface
Step 7: Float the Concrete
- 0:16–0:25 Float the Concrete Surface
- 0:44–0:46 Hand Float Concrete Surface
- 1:15–1:29 Float Concrete
Step 8: Finish the Concrete
- 0:07–0:11 Trowel for Smooth Concrete Finish
- 10:04–11:22 Final Troweling and Finishing
- 3:30–4:49 Concrete Floating and Troweling
Step 9: Cure the Concrete
- 2:08–2:39 Cure Concrete
- 0:57–0:59 Cure Concrete and Remove Forms
- 5:50–6:12 Cure the Concrete (this video)
Step 10: Remove Formwork
- 8:43–10:04 Remove Form and Backfill
- 4:03–4:08 Remove Formwork
- 0:52–0:54 Remove Formwork
How to Pour a Concrete Landing Pad for Deck Stairs
This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

