Float the Concrete Surface

From How to Pour a Concrete Landing Pad for Deck Stairs · Step 7 of 10 · Video by Premier Outdoor Living

Showing 0:16–0:25 of the source video. Watch the full video with every moment.

What happens in this clip

After screeding, wait until the concrete's surface sheen has disappeared (the 'bleed water' has evaporated) but it's still workable. Then, use a hand float (either a magnesium float or a wood float) to further smooth the surface and embed any aggregate particles that may have risen. This action also brings a thin layer of cement paste (known as 'cream') to the surface, which is essential for a good finish. Work the float in broad, arcing motions, applying gentle, even pressure. For longer reaches, a bull float may be used, but for this pathway, hand floats are shown. Ensure all high spots are reduced and low spots are filled.

Goal: Smooth the concrete and bring cream to the surface

What's used

Tools

  • Concrete Finishing Trowel
  • though not explicitly shown in this section of the video.
  • Kneeling Boards (Optional)
  • Magnesium Hand Float
  • Bull float (for larger areas)
  • embedding aggregate
  • and bringing cream to the top.

About the full video

This project details the process of installing a concrete pathway, from the initial pour and leveling to the final finishing and edging. It involves preparing the area (though not shown, implied by formwork), pouring ready-mix concrete, screeding it to the desired level, floating the surface for smoothness, and then using edgers for a clean, durable finish.

Step 7 of 10: Float the Concrete

After screeding, wait until the concrete has lost its initial sheen (the bleed water has evaporated). Then, using a magnesium or wood float, sweep the surface in wide, overlapping arcs. This action embeds larger aggregate, smooths out imperfections left by screeding, and brings a layer of cement paste (cream) to the surface, which is essential for final finishing.

Open this step in the guide

Every video in How to Pour a Concrete Landing Pad for Deck Stairs

  1. Step 1: Excavate Area

  2. Step 2: Install Formwork

  3. Step 3: Add and Compact Gravel Base

  4. Step 4: Place Rebar or Wire Mesh

  5. Step 5: Mix and Pour Concrete

  6. Step 6: Screed the Concrete

  7. Step 7: Float the Concrete

  8. Step 8: Finish the Concrete

  9. Step 9: Cure the Concrete

  10. Step 10: Remove Formwork

How to Pour a Concrete Landing Pad for Deck Stairs

This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Float the Concrete Surface — How to Pour a Concrete Landing Pad for Deck Stairs | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.