Float the Concrete Surface
From How to Pour a Concrete Landing Pad for Deck Stairs · Step 7 of 10 · Video by Premier Outdoor Living

Showing 0:16–0:25 of the source video. Watch the full video with every moment.
What happens in this clip
After screeding, wait until the concrete's surface sheen has disappeared (the 'bleed water' has evaporated) but it's still workable. Then, use a hand float (either a magnesium float or a wood float) to further smooth the surface and embed any aggregate particles that may have risen. This action also brings a thin layer of cement paste (known as 'cream') to the surface, which is essential for a good finish. Work the float in broad, arcing motions, applying gentle, even pressure. For longer reaches, a bull float may be used, but for this pathway, hand floats are shown. Ensure all high spots are reduced and low spots are filled.
Goal: Smooth the concrete and bring cream to the surface
What's used
Tools
- Concrete Finishing Trowel
- though not explicitly shown in this section of the video.
- Kneeling Boards (Optional)
- Magnesium Hand Float
- Bull float (for larger areas)
- embedding aggregate
- and bringing cream to the top.
About the full video
This project details the process of installing a concrete pathway, from the initial pour and leveling to the final finishing and edging. It involves preparing the area (though not shown, implied by formwork), pouring ready-mix concrete, screeding it to the desired level, floating the surface for smoothness, and then using edgers for a clean, durable finish.
Step 7 of 10: Float the Concrete
After screeding, wait until the concrete has lost its initial sheen (the bleed water has evaporated). Then, using a magnesium or wood float, sweep the surface in wide, overlapping arcs. This action embeds larger aggregate, smooths out imperfections left by screeding, and brings a layer of cement paste (cream) to the surface, which is essential for final finishing.
Every video in How to Pour a Concrete Landing Pad for Deck Stairs
Step 1: Excavate Area
- 13:17–15:33 Prepare Stair Base and Pour Concrete Pad
- 0:04–0:15 Site Preparation and Trench Digging
- 4:20–8:36 Prepare & Pour Concrete Pad
Step 2: Install Formwork
- 2:04–2:33 Build and Position Concrete Form
- 0:33–0:47 Formwork Installation
- 0:00–0:34 Lay Out and Assemble Initial Form Boards
Step 3: Add and Compact Gravel Base
- 2:21–2:33 Add & Compact Basecourse
- 3:15–4:05 Lay and Compact Gravel Base
- 0:20–0:38 Prepare Gravel Base
Step 4: Place Rebar or Wire Mesh
- 2:45–3:06 Add Steel Reinforcement (Rebar)
- 1:30–1:40 Add Wire Mesh Reinforcement
- 5:41–6:46 Rebar Placement for Reinforcement
Step 5: Mix and Pour Concrete
- 0:30–0:42 Pour and Level Concrete
- 3:10–3:41 Pour and Screed Concrete
- 1:58–2:31 Mix and Pour Concrete
Step 6: Screed the Concrete
- 0:04–0:13 Screed the Concrete
- 0:24–1:01 Screed the Concrete Surface
- 0:17–0:45 Screed the Concrete Surface
Step 7: Float the Concrete
- 0:16–0:25 Float the Concrete Surface (this video)
- 0:44–0:46 Hand Float Concrete Surface
- 1:15–1:29 Float Concrete
Step 8: Finish the Concrete
- 0:07–0:11 Trowel for Smooth Concrete Finish
- 10:04–11:22 Final Troweling and Finishing
- 3:30–4:49 Concrete Floating and Troweling
Step 9: Cure the Concrete
- 2:08–2:39 Cure Concrete
- 0:57–0:59 Cure Concrete and Remove Forms
- 5:50–6:12 Cure the Concrete
Step 10: Remove Formwork
- 8:43–10:04 Remove Form and Backfill
- 4:03–4:08 Remove Formwork
- 0:52–0:54 Remove Formwork
How to Pour a Concrete Landing Pad for Deck Stairs
This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.