Formwork Installation

From How to Pour a Concrete Landing Pad for Deck Stairs · Step 2 of 10 · Video by Mason The Mason

Showing 0:33–0:47 of the source video. Watch the full video with every moment.

What happens in this clip

Construct and install wooden forms around the perimeter of the excavated area. These forms typically consist of 2x4s or similar lumber, securely held in place by stakes driven into the ground. Ensure the forms are level and set to the desired height of the finished concrete pad, as they will serve as guides for pouring and leveling the concrete. Check measurements carefully for accuracy.

Goal: Create the structural outline for the concrete pad.

What's used

Tools

  • Hammer or Mallet
  • Lumber (2x4s or similar)
  • Measuring Tape
  • Spirit Level
  • Wooden Stakes

About the full video

This project details the process of installing a concrete pad for a hot tub, starting from site excavation and preparation, through formwork setup, gravel base installation, concrete pouring, and various finishing techniques including screeding, edging, floating, troweling, and applying a curing compound. While the video does not explicitly show the operation of a plate compactor, such a tool is visible on site, implying its use for compacting the gravel base, which is a crucial step for a robust foundation.

Step 2 of 10: Install Formwork

Cut two pieces of 2x6 lumber to 3 feet in length and two pieces to 2 feet in length. Assemble these pieces into a rectangular frame using screws, ensuring the corners are square. This frame will serve as the mold for the concrete, and its interior dimensions should match the desired final size of the landing pad.

Open this step in the guide

Every video in How to Pour a Concrete Landing Pad for Deck Stairs

  1. Step 1: Excavate Area

  2. Step 2: Install Formwork

  3. Step 3: Add and Compact Gravel Base

  4. Step 4: Place Rebar or Wire Mesh

  5. Step 5: Mix and Pour Concrete

  6. Step 6: Screed the Concrete

  7. Step 7: Float the Concrete

  8. Step 8: Finish the Concrete

  9. Step 9: Cure the Concrete

  10. Step 10: Remove Formwork

How to Pour a Concrete Landing Pad for Deck Stairs

This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Formwork Installation — How to Pour a Concrete Landing Pad for Deck Stairs | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.