Lay Out and Assemble Initial Form Boards
From How to Pour a Concrete Landing Pad for Deck Stairs · Step 2 of 10 · Video by Mason The Mason

Showing 0:00–0:34 of the source video. Watch the full video with every moment.
What happens in this clip
The project starts with laying out the initial form boards on the prepared gravel base. For a 12x8 foot concrete pad, two 12-foot boards are placed parallel, and a 10-foot board (or a cut-down 12-foot board) is used to connect one end, forming an 'L' shape or a partial box. The boards are screwed together at the corner to create a stable starting point. Ensuring accurate dimensions at this stage is crucial for the overall success of the project.
Goal: Begin by laying out the wooden boards for the concrete pad's perimeter and assembling the first corner to establish the basic shape and dimensions.
What's used
Tools
- Cordless Drill
- Wood Screws
- Wooden Boards (2x6 or 2x8)
About the full video
This video provides detailed instructions on how to prepare a site for a small concrete pad, including forming the perimeter with lumber, establishing accurate height and squareness using surveying tools and mathematical calculations, reinforcing the forms with stakes and specialized clamps, and finally installing wire mesh as concrete reinforcement before the pour.
What's said in this clip
in this video today I'm going to show you guys how to form up a small concrete pad get it prepped ready for the pour and how to pour it and finish it um so I'm going to start just by putting these forms together it's a 12 by 8 path so I got two 12 foot boards we're gonna run one way and then I got a 10 footer and a 12 footer that we can run long ways so we're going to start with that so the first step is you're gonna screw your boards together and make sure your dimensions are right so I know these are 12s they'll be good to go and then I'll measure over eight and once that's screwed together I'll show you what to do next all right so I I put that corner
Automatically transcribed from the source video.
Step 2 of 10: Install Formwork
Cut two pieces of 2x6 lumber to 3 feet in length and two pieces to 2 feet in length. Assemble these pieces into a rectangular frame using screws, ensuring the corners are square. This frame will serve as the mold for the concrete, and its interior dimensions should match the desired final size of the landing pad.
Every video in How to Pour a Concrete Landing Pad for Deck Stairs
Step 1: Excavate Area
- 13:17–15:33 Prepare Stair Base and Pour Concrete Pad
- 0:04–0:15 Site Preparation and Trench Digging
- 4:20–8:36 Prepare & Pour Concrete Pad
Step 2: Install Formwork
- 2:04–2:33 Build and Position Concrete Form
- 0:33–0:47 Formwork Installation
- 0:00–0:34 Lay Out and Assemble Initial Form Boards (this video)
Step 3: Add and Compact Gravel Base
- 2:21–2:33 Add & Compact Basecourse
- 3:15–4:05 Lay and Compact Gravel Base
- 0:20–0:38 Prepare Gravel Base
Step 4: Place Rebar or Wire Mesh
- 2:45–3:06 Add Steel Reinforcement (Rebar)
- 1:30–1:40 Add Wire Mesh Reinforcement
- 5:41–6:46 Rebar Placement for Reinforcement
Step 5: Mix and Pour Concrete
- 0:30–0:42 Pour and Level Concrete
- 3:10–3:41 Pour and Screed Concrete
- 1:58–2:31 Mix and Pour Concrete
Step 6: Screed the Concrete
- 0:04–0:13 Screed the Concrete
- 0:24–1:01 Screed the Concrete Surface
- 0:17–0:45 Screed the Concrete Surface
Step 7: Float the Concrete
- 0:16–0:25 Float the Concrete Surface
- 0:44–0:46 Hand Float Concrete Surface
- 1:15–1:29 Float Concrete
Step 8: Finish the Concrete
- 0:07–0:11 Trowel for Smooth Concrete Finish
- 10:04–11:22 Final Troweling and Finishing
- 3:30–4:49 Concrete Floating and Troweling
Step 9: Cure the Concrete
- 2:08–2:39 Cure Concrete
- 0:57–0:59 Cure Concrete and Remove Forms
- 5:50–6:12 Cure the Concrete
Step 10: Remove Formwork
- 8:43–10:04 Remove Form and Backfill
- 4:03–4:08 Remove Formwork
- 0:52–0:54 Remove Formwork
How to Pour a Concrete Landing Pad for Deck Stairs
This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

