What happens in this clip
Pour the basecourse material (such as gravel or crushed rock) into the excavated area, spreading it evenly with a rake. Aim for a depth of approximately 75 millimeters. Once spread, use a compactor (which can be hired from a tool rental store) to thoroughly compact the basecourse. This creates a solid and stable foundation for your concrete pad, preventing future settling and cracking.
Goal: Create a compacted base for the concrete pad
What's used
Tools
- Basecourse
- Crushed rock
- Compactor
- Rake
- Wheelbarrow Greens
About the full video
This DIY project guides you through the process of laying a concrete pad suitable for a garden shed. It covers everything from site selection and preparing the area by digging and leveling, to constructing the timber boxing, adding base layers of gravel and sand, installing a moisture barrier and mesh reinforcement, mixing and pouring concrete, and finally finishing and curing the slab. A key feature is the inclusion of a rebate for the shed walls to slot into.
Step 3 of 10: Add and Compact Gravel Base
Pour approximately 4 inches of gravel into the excavated area within the formwork. Use a hand tamper or a piece of scrap lumber to firmly compact the gravel. This layer will provide drainage and prevent frost heave, ensuring the longevity of the concrete pad.
Every video in How to Pour a Concrete Landing Pad for Deck Stairs
Step 1: Excavate Area
- 13:17–15:33 Prepare Stair Base and Pour Concrete Pad
- 0:04–0:15 Site Preparation and Trench Digging
- 4:20–8:36 Prepare & Pour Concrete Pad
Step 2: Install Formwork
- 2:04–2:33 Build and Position Concrete Form
- 0:33–0:47 Formwork Installation
- 0:00–0:34 Lay Out and Assemble Initial Form Boards
Step 3: Add and Compact Gravel Base
- 2:21–2:33 Add & Compact Basecourse (this video)
- 3:15–4:05 Lay and Compact Gravel Base
- 0:20–0:38 Prepare Gravel Base
Step 4: Place Rebar or Wire Mesh
- 2:45–3:06 Add Steel Reinforcement (Rebar)
- 1:30–1:40 Add Wire Mesh Reinforcement
- 5:41–6:46 Rebar Placement for Reinforcement
Step 5: Mix and Pour Concrete
- 0:30–0:42 Pour and Level Concrete
- 3:10–3:41 Pour and Screed Concrete
- 1:58–2:31 Mix and Pour Concrete
Step 6: Screed the Concrete
- 0:04–0:13 Screed the Concrete
- 0:24–1:01 Screed the Concrete Surface
- 0:17–0:45 Screed the Concrete Surface
Step 7: Float the Concrete
- 0:16–0:25 Float the Concrete Surface
- 0:44–0:46 Hand Float Concrete Surface
- 1:15–1:29 Float Concrete
Step 8: Finish the Concrete
- 0:07–0:11 Trowel for Smooth Concrete Finish
- 10:04–11:22 Final Troweling and Finishing
- 3:30–4:49 Concrete Floating and Troweling
Step 9: Cure the Concrete
- 2:08–2:39 Cure Concrete
- 0:57–0:59 Cure Concrete and Remove Forms
- 5:50–6:12 Cure the Concrete
Step 10: Remove Formwork
- 8:43–10:04 Remove Form and Backfill
- 4:03–4:08 Remove Formwork
- 0:52–0:54 Remove Formwork
How to Pour a Concrete Landing Pad for Deck Stairs
This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.