
Clip 1/3
Helpful?
Step 6 · Screed the Concrete
Using a straight piece of lumber (such as a 2x4) as a screed board, rest it on top of the 2x6 formwork. Move the screed board back and forth in a sawing motion across the surface of the wet concrete, dragging excess concrete with it and filling low spots. This process levels the concrete to the height of the form.
Tools and Materials
2”x4” Lumber
Rust-Oleum 5 lb. Pourable Interior/Exterior Concrete Patch 369667

