Pour and Level Concrete
From How to Pour a Concrete Landing Pad for Deck Stairs · Step 5 of 10 · Video by Jesse does DIY

Showing 0:30–0:42 of the source video. Watch the full video with every moment.
What happens in this clip
Carefully pour the mixed concrete into the formwork, distributing it evenly over the reinforcement wire and crushed rock base. Use a shovel or rake to spread the concrete as you go, ensuring it fills all corners and voids. Once the form is mostly full, use a straight edge, such as a flat 2x4, to screed the concrete. This involves moving the 2x4 across the top edges of the formwork in a sawing motion to level the concrete and remove any excess, creating a flat surface. Periodically check for low spots and add more concrete as needed, then screed again until the entire surface is level with the top of the formwork.
Goal: Fill the form and create a level surface
What's used
Tools
- Flat 2x4 (Screed Board)
- Aluminum straight edge
- Shovel
- Concrete hoe
Materials
- Mixed Concrete QUIKRETE
About the full video
This project provides a concise guide on how to install a concrete slab. It covers building and securing formwork, excavating the base, mixing and pouring concrete, and applying various finishes like screeding, floating, edging, and a broom finish. The project concludes with removing the formwork, sealing the concrete, and backfilling the surrounding area.
Step 5 of 10: Mix and Pour Concrete
Using a concrete mixer or mixing the concrete in batches with a shovel and wheelbarrow, combine the concrete mix with water as per the manufacturer's instructions. Aim for a workable consistency that is not too wet or too dry. Carefully pour the mixed concrete into the formwork, spreading it evenly with a shovel or rake to fill the entire space.
Every video in How to Pour a Concrete Landing Pad for Deck Stairs
Step 1: Excavate Area
- 13:17–15:33 Prepare Stair Base and Pour Concrete Pad
- 0:04–0:15 Site Preparation and Trench Digging
- 4:20–8:36 Prepare & Pour Concrete Pad
Step 2: Install Formwork
- 2:04–2:33 Build and Position Concrete Form
- 0:33–0:47 Formwork Installation
- 0:00–0:34 Lay Out and Assemble Initial Form Boards
Step 3: Add and Compact Gravel Base
- 2:21–2:33 Add & Compact Basecourse
- 3:15–4:05 Lay and Compact Gravel Base
- 0:20–0:38 Prepare Gravel Base
Step 4: Place Rebar or Wire Mesh
- 2:45–3:06 Add Steel Reinforcement (Rebar)
- 1:30–1:40 Add Wire Mesh Reinforcement
- 5:41–6:46 Rebar Placement for Reinforcement
Step 5: Mix and Pour Concrete
- 0:30–0:42 Pour and Level Concrete (this video)
- 3:10–3:41 Pour and Screed Concrete
- 1:58–2:31 Mix and Pour Concrete
Step 6: Screed the Concrete
- 0:04–0:13 Screed the Concrete
- 0:24–1:01 Screed the Concrete Surface
- 0:17–0:45 Screed the Concrete Surface
Step 7: Float the Concrete
- 0:16–0:25 Float the Concrete Surface
- 0:44–0:46 Hand Float Concrete Surface
- 1:15–1:29 Float Concrete
Step 8: Finish the Concrete
- 0:07–0:11 Trowel for Smooth Concrete Finish
- 10:04–11:22 Final Troweling and Finishing
- 3:30–4:49 Concrete Floating and Troweling
Step 9: Cure the Concrete
- 2:08–2:39 Cure Concrete
- 0:57–0:59 Cure Concrete and Remove Forms
- 5:50–6:12 Cure the Concrete
Step 10: Remove Formwork
- 8:43–10:04 Remove Form and Backfill
- 4:03–4:08 Remove Formwork
- 0:52–0:54 Remove Formwork
How to Pour a Concrete Landing Pad for Deck Stairs
This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.