powered by

Pour and Level Concrete

From How to Pour a Concrete Landing Pad for Deck Stairs · Step 5 of 10 · Video by Jesse does DIY

Showing 0:30–0:42 of the source video. Watch the full video with every moment.

What happens in this clip

Carefully pour the mixed concrete into the formwork, distributing it evenly over the reinforcement wire and crushed rock base. Use a shovel or rake to spread the concrete as you go, ensuring it fills all corners and voids. Once the form is mostly full, use a straight edge, such as a flat 2x4, to screed the concrete. This involves moving the 2x4 across the top edges of the formwork in a sawing motion to level the concrete and remove any excess, creating a flat surface. Periodically check for low spots and add more concrete as needed, then screed again until the entire surface is level with the top of the formwork.

Goal: Fill the form and create a level surface

What's used

Tools

  • Flat 2x4 (Screed Board)
  • Aluminum straight edge
  • Shovel
  • Concrete hoe

Materials

  • Mixed Concrete QUIKRETE

About the full video

This project provides a concise guide on how to install a concrete slab. It covers building and securing formwork, excavating the base, mixing and pouring concrete, and applying various finishes like screeding, floating, edging, and a broom finish. The project concludes with removing the formwork, sealing the concrete, and backfilling the surrounding area.

Step 5 of 10: Mix and Pour Concrete

Using a concrete mixer or mixing the concrete in batches with a shovel and wheelbarrow, combine the concrete mix with water as per the manufacturer's instructions. Aim for a workable consistency that is not too wet or too dry. Carefully pour the mixed concrete into the formwork, spreading it evenly with a shovel or rake to fill the entire space.

Open this step in the guide

Every video in How to Pour a Concrete Landing Pad for Deck Stairs

  1. Step 1: Excavate Area

  2. Step 2: Install Formwork

  3. Step 3: Add and Compact Gravel Base

  4. Step 4: Place Rebar or Wire Mesh

  5. Step 5: Mix and Pour Concrete

  6. Step 6: Screed the Concrete

  7. Step 7: Float the Concrete

  8. Step 8: Finish the Concrete

  9. Step 9: Cure the Concrete

  10. Step 10: Remove Formwork

How to Pour a Concrete Landing Pad for Deck Stairs

This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Pour and Level Concrete — How to Pour a Concrete Landing Pad for Deck Stairs | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.