Screed the Concrete
From How to Pour a Concrete Landing Pad for Deck Stairs · Step 6 of 10 · Video by Komar Project

Showing 0:04–0:13 of the source video. Watch the full video with every moment.
What happens in this clip
After pouring the dry concrete mix, use a long, straight piece of lumber (often called a screed board) to level the surface. Place the screed board across the top edges of the wooden form and pull it in a back-and-forth sawing motion across the concrete. This process removes excess concrete and creates a relatively flat and even surface.
Goal: Level the concrete surface within the form
What's used
Tools
- Screed Board
- Straight edge
About the full video
This project outlines the process of creating a small, level concrete pad, likely for an outdoor unit or a small foundation. It involves preparing a wooden form, filling it with gravel and concrete mix, leveling the surface, and finishing the edges, followed by misting for proper curing.
Step 6 of 10: Screed the Concrete
Using a straight piece of lumber (such as a 2x4) as a screed board, rest it on top of the 2x6 formwork. Move the screed board back and forth in a sawing motion across the surface of the wet concrete, dragging excess concrete with it and filling low spots. This process levels the concrete to the height of the form.
Every video in How to Pour a Concrete Landing Pad for Deck Stairs
Step 1: Excavate Area
- 13:17–15:33 Prepare Stair Base and Pour Concrete Pad
- 0:04–0:15 Site Preparation and Trench Digging
- 4:20–8:36 Prepare & Pour Concrete Pad
Step 2: Install Formwork
- 2:04–2:33 Build and Position Concrete Form
- 0:33–0:47 Formwork Installation
- 0:00–0:34 Lay Out and Assemble Initial Form Boards
Step 3: Add and Compact Gravel Base
- 2:21–2:33 Add & Compact Basecourse
- 3:15–4:05 Lay and Compact Gravel Base
- 0:20–0:38 Prepare Gravel Base
Step 4: Place Rebar or Wire Mesh
- 2:45–3:06 Add Steel Reinforcement (Rebar)
- 1:30–1:40 Add Wire Mesh Reinforcement
- 5:41–6:46 Rebar Placement for Reinforcement
Step 5: Mix and Pour Concrete
- 0:30–0:42 Pour and Level Concrete
- 3:10–3:41 Pour and Screed Concrete
- 1:58–2:31 Mix and Pour Concrete
Step 6: Screed the Concrete
- 0:04–0:13 Screed the Concrete (this video)
- 0:24–1:01 Screed the Concrete Surface
- 0:17–0:45 Screed the Concrete Surface
Step 7: Float the Concrete
- 0:16–0:25 Float the Concrete Surface
- 0:44–0:46 Hand Float Concrete Surface
- 1:15–1:29 Float Concrete
Step 8: Finish the Concrete
- 0:07–0:11 Trowel for Smooth Concrete Finish
- 10:04–11:22 Final Troweling and Finishing
- 3:30–4:49 Concrete Floating and Troweling
Step 9: Cure the Concrete
- 2:08–2:39 Cure Concrete
- 0:57–0:59 Cure Concrete and Remove Forms
- 5:50–6:12 Cure the Concrete
Step 10: Remove Formwork
- 8:43–10:04 Remove Form and Backfill
- 4:03–4:08 Remove Formwork
- 0:52–0:54 Remove Formwork
How to Pour a Concrete Landing Pad for Deck Stairs
This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

