Pour and Screed Concrete
From How to Pour a Concrete Landing Pad for Deck Stairs · Step 5 of 10 · Video by BYOT

Showing 3:10–3:41 of the source video. Watch the full video with every moment.
What happens in this clip
Carefully pour the mixed concrete into the formwork, filling each section. As you pour, use a shovel or trowel to work the concrete into all the tight corners and edges of the formwork, ensuring there are no voids. Once the formwork is filled, use a screed (a straight edge, such as a piece of lumber or a specialized concrete screed) to level the top surface of the concrete. Drag the screed across the formwork in a sawing motion to remove excess concrete and achieve a perfectly flat and smooth surface. The goal is to match the height of the formwork, ensuring a uniform finish.
Goal: Pour the freshly mixed concrete into the prepared formwork and then screed it level to create a smooth, even surface for the landing.
What's used
Tools
- Safety gloves
- Screed
- Shovel
Materials
- Mixed Concrete
About the full video
This project details the installation of composite decking to create a seamless transition between an existing deck, a retaining wall, and the surrounding landscape. It involves building a new landing and stairs with structural integrity and a modern aesthetic, ensuring all edges are flush and visually appealing. The process covers framing, concrete pouring for stable foundations, and precise installation of composite deck boards with hidden fasteners.
What's said in this clip
wants in their concrete i begin filling the first bay of concrete and as i'm pouring i do try and make sure and solidify all that concrete into the tight-knit corners of the formwork then i come back with a screed and screed off the very top portion so we have a very nice and smooth surface to work upon after it dries now the one thing i wish i thought about a little bit more thoroughly is that this framework was extremely difficult to remove so much so that i actually just left it in there i wish i made it so i
Automatically transcribed from the source video.
Step 5 of 10: Mix and Pour Concrete
Using a concrete mixer or mixing the concrete in batches with a shovel and wheelbarrow, combine the concrete mix with water as per the manufacturer's instructions. Aim for a workable consistency that is not too wet or too dry. Carefully pour the mixed concrete into the formwork, spreading it evenly with a shovel or rake to fill the entire space.
Every video in How to Pour a Concrete Landing Pad for Deck Stairs
Step 1: Excavate Area
- 13:17–15:33 Prepare Stair Base and Pour Concrete Pad
- 0:04–0:15 Site Preparation and Trench Digging
- 4:20–8:36 Prepare & Pour Concrete Pad
Step 2: Install Formwork
- 2:04–2:33 Build and Position Concrete Form
- 0:33–0:47 Formwork Installation
- 0:00–0:34 Lay Out and Assemble Initial Form Boards
Step 3: Add and Compact Gravel Base
- 2:21–2:33 Add & Compact Basecourse
- 3:15–4:05 Lay and Compact Gravel Base
- 0:20–0:38 Prepare Gravel Base
Step 4: Place Rebar or Wire Mesh
- 2:45–3:06 Add Steel Reinforcement (Rebar)
- 1:30–1:40 Add Wire Mesh Reinforcement
- 5:41–6:46 Rebar Placement for Reinforcement
Step 5: Mix and Pour Concrete
- 0:30–0:42 Pour and Level Concrete
- 3:10–3:41 Pour and Screed Concrete (this video)
- 1:58–2:31 Mix and Pour Concrete
Step 6: Screed the Concrete
- 0:04–0:13 Screed the Concrete
- 0:24–1:01 Screed the Concrete Surface
- 0:17–0:45 Screed the Concrete Surface
Step 7: Float the Concrete
- 0:16–0:25 Float the Concrete Surface
- 0:44–0:46 Hand Float Concrete Surface
- 1:15–1:29 Float Concrete
Step 8: Finish the Concrete
- 0:07–0:11 Trowel for Smooth Concrete Finish
- 10:04–11:22 Final Troweling and Finishing
- 3:30–4:49 Concrete Floating and Troweling
Step 9: Cure the Concrete
- 2:08–2:39 Cure Concrete
- 0:57–0:59 Cure Concrete and Remove Forms
- 5:50–6:12 Cure the Concrete
Step 10: Remove Formwork
- 8:43–10:04 Remove Form and Backfill
- 4:03–4:08 Remove Formwork
- 0:52–0:54 Remove Formwork
How to Pour a Concrete Landing Pad for Deck Stairs
This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.