powered by

Pour and Screed Concrete

From How to Pour a Concrete Landing Pad for Deck Stairs · Step 5 of 10 · Video by BYOT

Showing 3:10–3:41 of the source video. Watch the full video with every moment.

What happens in this clip

Carefully pour the mixed concrete into the formwork, filling each section. As you pour, use a shovel or trowel to work the concrete into all the tight corners and edges of the formwork, ensuring there are no voids. Once the formwork is filled, use a screed (a straight edge, such as a piece of lumber or a specialized concrete screed) to level the top surface of the concrete. Drag the screed across the formwork in a sawing motion to remove excess concrete and achieve a perfectly flat and smooth surface. The goal is to match the height of the formwork, ensuring a uniform finish.

Goal: Pour the freshly mixed concrete into the prepared formwork and then screed it level to create a smooth, even surface for the landing.

What's used

Tools

  • Safety gloves
  • Screed
  • Shovel

Materials

  • Mixed Concrete

About the full video

This project details the installation of composite decking to create a seamless transition between an existing deck, a retaining wall, and the surrounding landscape. It involves building a new landing and stairs with structural integrity and a modern aesthetic, ensuring all edges are flush and visually appealing. The process covers framing, concrete pouring for stable foundations, and precise installation of composite deck boards with hidden fasteners.

What's said in this clip

wants in their concrete i begin filling the first bay of concrete and as i'm pouring i do try and make sure and solidify all that concrete into the tight-knit corners of the formwork then i come back with a screed and screed off the very top portion so we have a very nice and smooth surface to work upon after it dries now the one thing i wish i thought about a little bit more thoroughly is that this framework was extremely difficult to remove so much so that i actually just left it in there i wish i made it so i

Automatically transcribed from the source video.

Step 5 of 10: Mix and Pour Concrete

Using a concrete mixer or mixing the concrete in batches with a shovel and wheelbarrow, combine the concrete mix with water as per the manufacturer's instructions. Aim for a workable consistency that is not too wet or too dry. Carefully pour the mixed concrete into the formwork, spreading it evenly with a shovel or rake to fill the entire space.

Open this step in the guide

Every video in How to Pour a Concrete Landing Pad for Deck Stairs

  1. Step 1: Excavate Area

  2. Step 2: Install Formwork

  3. Step 3: Add and Compact Gravel Base

  4. Step 4: Place Rebar or Wire Mesh

  5. Step 5: Mix and Pour Concrete

  6. Step 6: Screed the Concrete

  7. Step 7: Float the Concrete

  8. Step 8: Finish the Concrete

  9. Step 9: Cure the Concrete

  10. Step 10: Remove Formwork

How to Pour a Concrete Landing Pad for Deck Stairs

This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Pour and Screed Concrete — How to Pour a Concrete Landing Pad for Deck Stairs | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.