Remove Formwork
From How to Pour a Concrete Landing Pad for Deck Stairs · Step 10 of 10 · Video by Great Home Ideas

Showing 4:03–4:08 of the source video. Watch the full video with every moment.
What happens in this clip
After the concrete has adequately cured (typically after a day or two when it's hard enough), carefully remove the formwork boards. Use a crowbar, pickaxe, or hammer to gently pry the stakes and boards away from the concrete edge. Be careful not to damage the fresh concrete edges during removal.
Goal: Dismantle and remove the timber formwork from the cured concrete path
What's used
Tools
- Crowbar
- Claw hammer
About the full video
This project guides you through creating a durable and aesthetically pleasing concrete path in your backyard. It covers the entire process from initial excavation and setting up the formwork, including techniques for curved sections, to pouring, leveling, finishing, and sealing the concrete. The goal is to transform an unkempt dirt path into a well-designed, functional walkway.
Step 10 of 10: Remove Formwork
Once the concrete has cured sufficiently (typically after 24-48 hours, but check local conditions and concrete type), carefully pry off the 2x6 lumber forms. Use a pry bar to gently loosen the forms from the concrete. Be careful not to chip or damage the edges of the concrete pad.
Every video in How to Pour a Concrete Landing Pad for Deck Stairs
Step 1: Excavate Area
- 13:17–15:33 Prepare Stair Base and Pour Concrete Pad
- 0:04–0:15 Site Preparation and Trench Digging
- 4:20–8:36 Prepare & Pour Concrete Pad
Step 2: Install Formwork
- 2:04–2:33 Build and Position Concrete Form
- 0:33–0:47 Formwork Installation
- 0:00–0:34 Lay Out and Assemble Initial Form Boards
Step 3: Add and Compact Gravel Base
- 2:21–2:33 Add & Compact Basecourse
- 3:15–4:05 Lay and Compact Gravel Base
- 0:20–0:38 Prepare Gravel Base
Step 4: Place Rebar or Wire Mesh
- 2:45–3:06 Add Steel Reinforcement (Rebar)
- 1:30–1:40 Add Wire Mesh Reinforcement
- 5:41–6:46 Rebar Placement for Reinforcement
Step 5: Mix and Pour Concrete
- 0:30–0:42 Pour and Level Concrete
- 3:10–3:41 Pour and Screed Concrete
- 1:58–2:31 Mix and Pour Concrete
Step 6: Screed the Concrete
- 0:04–0:13 Screed the Concrete
- 0:24–1:01 Screed the Concrete Surface
- 0:17–0:45 Screed the Concrete Surface
Step 7: Float the Concrete
- 0:16–0:25 Float the Concrete Surface
- 0:44–0:46 Hand Float Concrete Surface
- 1:15–1:29 Float Concrete
Step 8: Finish the Concrete
- 0:07–0:11 Trowel for Smooth Concrete Finish
- 10:04–11:22 Final Troweling and Finishing
- 3:30–4:49 Concrete Floating and Troweling
Step 9: Cure the Concrete
- 2:08–2:39 Cure Concrete
- 0:57–0:59 Cure Concrete and Remove Forms
- 5:50–6:12 Cure the Concrete
Step 10: Remove Formwork
- 8:43–10:04 Remove Form and Backfill
- 4:03–4:08 Remove Formwork (this video)
- 0:52–0:54 Remove Formwork
How to Pour a Concrete Landing Pad for Deck Stairs
This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.