Apply Adhesive and Install Treads
From How to Build Basement Stairs · Step 6 of 9 · Video by Essential Craftsman

Showing 10:10–11:50 of the source video. Watch the full video with every moment.
What happens in this clip
Cut OSB or plywood to the correct dimensions for the stair treads. Apply a generous bead of construction adhesive along the top edges of all stringers and intermediate support blocks for each step. Carefully place each tread board onto the adhesive-covered surfaces, ensuring it is flush with the risers and properly aligned. Use a nail gun to temporarily secure the treads in place with nails. The nails hold the treads until the adhesive cures, providing a strong, squeak-free connection. Ensure the treads are perfectly flat and level before the adhesive sets.
Goal: Apply construction adhesive to the top edges of the stringers and supports, then place and nail the OSB treads, ensuring they are flat and level.
What's used
Tools
- Circular Saw
- Construction Adhesive (Liquid Nails Heavy Duty)
- Hammer
- Level (Master Level)
- Measuring Tape
- Nail Gun (Hitachi)
- OSB/Plywood (for treads)
About the full video
This video details the process of correcting a previously misbuilt staircase. It covers the removal of non-code-compliant stringers, adjustment of the header for an additional rise, precise calculation and marking of new stringer dimensions, cutting and installation of notched stringers, and final securing of risers and treads to create a safe, code-compliant, and comfortable staircase.
Step 6 of 9: Cut and Install Treads
Measure the depth of each step opening (the run) and the width of the stairs. Cut your tread material to these dimensions. The treads should typically overhang the riser by about 1 inch. Common tread materials include 2x lumber (like pine or oak), plywood, or specially made stair treads. Treads are usually attached by screwing through the stringer into the underside of the tread, or by using specialized tread brackets. For a cleaner look, you can notch the stringers to accept the treads, but ensure this does not compromise the stringer's strength. Ensure treads are level and securely fastened.
Every video in How to Build Basement Stairs
Step 1: Measure and Plan Stair Location
- 1:14–1:25 Measure and Calculate Stair Dimensions
- 0:11–1:48 Calculate and Layout Staircase Dimensions
- 0:00–2:15 Calculate Stair Dimensions
Step 2: Cut Stair Stringers
- 0:57–1:08 Lay Out and Cut the First Stringer
- 5:24–6:18 Cut Stair Stringers from Lumber
- 2:20–3:14 Mark and Cut Stringers
Step 3: Install Top Support for Stringers
- 12:25–12:49 Install Ledger Board for Stringers
- 5:17–6:26 Determine Stringer Attachment to Deck Band Board
- 13:16–13:26 Attach Stair Stringer Ledger
Step 4: Attach Stringers to Top Support
- 30:00–35:46 Install Stringers and Brackets
- 6:49–8:07 Install Stringers
- 9:15–10:09 Installing Stringer Hangers to Deck
Step 5: Secure Bottom of Stringers
- 10:09–11:12 Securing Stringers to Landing Pad with Base Plate
- 9:41–10:36 Anchor Stringer Base Plate to Concrete
- 18:03–22:29 Secure Staircase Bottom
Step 6: Cut and Install Treads
- 10:15–17:22 Install Risers and Treads
- 10:10–11:50 Apply Adhesive and Install Treads (this video)
- 0:06–0:09 Install Treads and Risers
Step 7: Cut and Install Risers (Optional but Recommended)
- 30:57–33:30 Install Stair Risers
- 8:38–11:15 Install Risers
- 0:06–0:09 Install Treads and Risers
Step 8: Install Handrails and Balusters
- 0:32–0:45 Install Handrails
- 5:36–6:05 Install Balusters and Handrail
- 11:30–13:16 Install Balusters
Step 9: Sand and Finish Treads and Risers
- 0:37–0:41 Sand the Staircase
- 8:53–11:22 Sand and Finish Stairs
- 0:08–1:13 Prepare and Finish Wood Stair Treads
How to Build Basement Stairs
This project outlines the steps for building a safe and code-compliant set of stairs to a basement. It covers planning, material selection, cutting, assembly, and finishing, emphasizing structural integrity and safety features.
Read the full guide Browse all guides