Install Stringers
From How to Build Basement Stairs · Step 4 of 9 · Video by Building and DIY

Showing 6:49–8:07 of the source video. Watch the full video with every moment.
What happens in this clip
Carefully lift and position the outer stringers. Secure them to the header using the attached metal strap hangers, aligning the top of the stringer with the previously marked line. Nail the hangers securely to the header. Next, position and nail the middle stringer, using the pre-attached spacing block to ensure it is centered correctly. At the bottom, securely nail the kicker block of each stringer to the subfloor to prevent forward movement. Also, nail the stringers to the wall framing if they are adjacent to a wall.
Goal: Securely fasten all stringers in place
What's used
Tools
- Hammer
- floor
- and wall framing.
- Nails (16-penny)
- Stringers with Hangers
About the full video
This project provides a step-by-step guide on how to build a flight of straight stairs, including measuring the total rise, calculating individual step dimensions, laying out and cutting stringers, installing structural supports, and finally installing the risers and treads.
Step 4 of 9: Attach Stringers to Top Support
Carefully lift and position the cut stringers against the ledger board. Ensure the top cut of each stringer sits flush and is properly supported by the ledger. Use strong metal hangers (stringer hangers or joist hangers) designed for this purpose, or toenail the stringers by driving screws at an angle through the stringer into the ledger board. Ensure the stringers are parallel and the correct distance apart.
Every video in How to Build Basement Stairs
Step 1: Measure and Plan Stair Location
- 1:14–1:25 Measure and Calculate Stair Dimensions
- 0:11–1:48 Calculate and Layout Staircase Dimensions
- 0:00–2:15 Calculate Stair Dimensions
Step 2: Cut Stair Stringers
- 0:57–1:08 Lay Out and Cut the First Stringer
- 5:24–6:18 Cut Stair Stringers from Lumber
- 2:20–3:14 Mark and Cut Stringers
Step 3: Install Top Support for Stringers
- 12:25–12:49 Install Ledger Board for Stringers
- 5:17–6:26 Determine Stringer Attachment to Deck Band Board
- 13:16–13:26 Attach Stair Stringer Ledger
Step 4: Attach Stringers to Top Support
- 30:00–35:46 Install Stringers and Brackets
- 6:49–8:07 Install Stringers (this video)
- 9:15–10:09 Installing Stringer Hangers to Deck
Step 5: Secure Bottom of Stringers
- 10:09–11:12 Securing Stringers to Landing Pad with Base Plate
- 9:41–10:36 Anchor Stringer Base Plate to Concrete
- 18:03–22:29 Secure Staircase Bottom
Step 6: Cut and Install Treads
- 10:15–17:22 Install Risers and Treads
- 10:10–11:50 Apply Adhesive and Install Treads
- 0:06–0:09 Install Treads and Risers
Step 7: Cut and Install Risers (Optional but Recommended)
- 30:57–33:30 Install Stair Risers
- 8:38–11:15 Install Risers
- 0:06–0:09 Install Treads and Risers
Step 8: Install Handrails and Balusters
- 0:32–0:45 Install Handrails
- 5:36–6:05 Install Balusters and Handrail
- 11:30–13:16 Install Balusters
Step 9: Sand and Finish Treads and Risers
- 0:37–0:41 Sand the Staircase
- 8:53–11:22 Sand and Finish Stairs
- 0:08–1:13 Prepare and Finish Wood Stair Treads
How to Build Basement Stairs
This project outlines the steps for building a safe and code-compliant set of stairs to a basement. It covers planning, material selection, cutting, assembly, and finishing, emphasizing structural integrity and safety features.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

