Install Handrails
From How to Build Basement Stairs · Step 8 of 9 · Video by The Landlords Workshop

Showing 0:32–0:45 of the source video. Watch the full video with every moment.
What happens in this clip
After the newel posts are securely in place, install the handrails between them. It is crucial to use a level to ensure that the handrails are perfectly level (if on a landing) or at a consistent angle (if on stairs). Secure the handrails to the newel posts using appropriate fasteners, often involving specialized rail bolts or brackets that allow for a strong, concealed connection.
Goal: Attach and level the handrails
What's used
Tools
- Fasteners (e.g.
- rail bolts
- brackets)
- Handrails
- Leveler
- Laser level
About the full video
This project provides a step-by-step guide to installing a new stair railing system, covering everything from floor preparation and newel post installation to handrail attachment, baluster marking, drilling, and final installation with glue and nails.
Step 8 of 9: Install Handrails and Balusters
Install handrail posts securely to the stair stringers or landing framing. Attach the handrail to these posts, ensuring it is at the correct height (typically 34-38 inches above the tread nosing) and extends at least 12 inches beyond the top and bottom steps. Spacing for balusters should not allow a 4-inch sphere to pass through (check local code). Attach balusters to the treads or stringers and to the underside of the handrail using appropriate fasteners and brackets. Ensure all connections are very secure.
Every video in How to Build Basement Stairs
Step 1: Measure and Plan Stair Location
- 1:14–1:25 Measure and Calculate Stair Dimensions
- 0:11–1:48 Calculate and Layout Staircase Dimensions
- 0:00–2:15 Calculate Stair Dimensions
Step 2: Cut Stair Stringers
- 0:57–1:08 Lay Out and Cut the First Stringer
- 5:24–6:18 Cut Stair Stringers from Lumber
- 2:20–3:14 Mark and Cut Stringers
Step 3: Install Top Support for Stringers
- 12:25–12:49 Install Ledger Board for Stringers
- 5:17–6:26 Determine Stringer Attachment to Deck Band Board
- 13:16–13:26 Attach Stair Stringer Ledger
Step 4: Attach Stringers to Top Support
- 30:00–35:46 Install Stringers and Brackets
- 6:49–8:07 Install Stringers
- 9:15–10:09 Installing Stringer Hangers to Deck
Step 5: Secure Bottom of Stringers
- 10:09–11:12 Securing Stringers to Landing Pad with Base Plate
- 9:41–10:36 Anchor Stringer Base Plate to Concrete
- 18:03–22:29 Secure Staircase Bottom
Step 6: Cut and Install Treads
- 10:15–17:22 Install Risers and Treads
- 10:10–11:50 Apply Adhesive and Install Treads
- 0:06–0:09 Install Treads and Risers
Step 7: Cut and Install Risers (Optional but Recommended)
- 30:57–33:30 Install Stair Risers
- 8:38–11:15 Install Risers
- 0:06–0:09 Install Treads and Risers
Step 8: Install Handrails and Balusters
- 0:32–0:45 Install Handrails (this video)
- 5:36–6:05 Install Balusters and Handrail
- 11:30–13:16 Install Balusters
Step 9: Sand and Finish Treads and Risers
- 0:37–0:41 Sand the Staircase
- 8:53–11:22 Sand and Finish Stairs
- 0:08–1:13 Prepare and Finish Wood Stair Treads
How to Build Basement Stairs
This project outlines the steps for building a safe and code-compliant set of stairs to a basement. It covers planning, material selection, cutting, assembly, and finishing, emphasizing structural integrity and safety features.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

