Mark and Cut Stringers
From How to Build Basement Stairs · Step 2 of 9 · Video by Lowe's Home Improvement

Showing 2:20–3:14 of the source video. Watch the full video with every moment.
What happens in this clip
Place the 2x12 treated lumber boards, which will become the stringers, on sawhorses. Using a framing square equipped with stair gauges (set to the previously calculated rise and run), mark the steps onto the board. Start by marking the top run at the corner of the plank, then slide the square along the plank to mark both the rise and run for each subsequent step. Continue marking until you have the correct number of steps for your stringer. Once marked, use a circular saw to cut along the lines, stopping short of the corners to avoid overcutting. Finish the cuts cleanly at the corners with a hand saw. Use this first cut stringer as a template to mark and cut the remaining stringers, ensuring consistency across all stair supports.
Goal: Accurately cut stair stringers based on calculated rise and run.
What's used
Tools
- Circular Saw Kobalt
- Framing Square
- Hand Saw
- Pencil
- Safety Glasses
- Sawhorses
- Stair Gauges
- Treated Lumber (2x12)
About the full video
This project provides a step-by-step guide on how to build composite stairs and install railings for a deck. It covers calculating stair dimensions, installing footers and posts, marking and cutting stringers, attaching them to the deck, installing toe kicks and treads, and finally assembling and securing the composite railing system.
Step 2 of 9: Cut Stair Stringers
Select straight, knot-free 2x12 lumber for your stringers. Using your framing square and pencil, carefully lay out the rise and run for each step according to your calculations. Start from the top and mark out each step's dimensions. Make straight, clean cuts for each riser and tread. You will typically need two stringers, but for wider stairs, a third stringer in the middle is recommended for support. Ensure the 'notch' for the landing at the top is properly cut to rest securely on the subfloor or header. The bottom of the stringer should sit flat on the basement floor, or on a properly prepared landing.
Every video in How to Build Basement Stairs
Step 1: Measure and Plan Stair Location
- 1:14–1:25 Measure and Calculate Stair Dimensions
- 0:11–1:48 Calculate and Layout Staircase Dimensions
- 0:00–2:15 Calculate Stair Dimensions
Step 2: Cut Stair Stringers
- 0:57–1:08 Lay Out and Cut the First Stringer
- 5:24–6:18 Cut Stair Stringers from Lumber
- 2:20–3:14 Mark and Cut Stringers (this video)
Step 3: Install Top Support for Stringers
- 12:25–12:49 Install Ledger Board for Stringers
- 5:17–6:26 Determine Stringer Attachment to Deck Band Board
- 13:16–13:26 Attach Stair Stringer Ledger
Step 4: Attach Stringers to Top Support
- 30:00–35:46 Install Stringers and Brackets
- 6:49–8:07 Install Stringers
- 9:15–10:09 Installing Stringer Hangers to Deck
Step 5: Secure Bottom of Stringers
- 10:09–11:12 Securing Stringers to Landing Pad with Base Plate
- 9:41–10:36 Anchor Stringer Base Plate to Concrete
- 18:03–22:29 Secure Staircase Bottom
Step 6: Cut and Install Treads
- 10:15–17:22 Install Risers and Treads
- 10:10–11:50 Apply Adhesive and Install Treads
- 0:06–0:09 Install Treads and Risers
Step 7: Cut and Install Risers (Optional but Recommended)
- 30:57–33:30 Install Stair Risers
- 8:38–11:15 Install Risers
- 0:06–0:09 Install Treads and Risers
Step 8: Install Handrails and Balusters
- 0:32–0:45 Install Handrails
- 5:36–6:05 Install Balusters and Handrail
- 11:30–13:16 Install Balusters
Step 9: Sand and Finish Treads and Risers
- 0:37–0:41 Sand the Staircase
- 8:53–11:22 Sand and Finish Stairs
- 0:08–1:13 Prepare and Finish Wood Stair Treads
How to Build Basement Stairs
This project outlines the steps for building a safe and code-compliant set of stairs to a basement. It covers planning, material selection, cutting, assembly, and finishing, emphasizing structural integrity and safety features.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

