
Clip 1/3
Helpful?
Step 3 · Add and Compact Gravel Base
Pour approximately 4 inches of gravel into the excavated area within the formwork. Use a hand tamper or a piece of scrap lumber to firmly compact the gravel. This layer will provide drainage and prevent frost heave, ensuring the longevity of the concrete pad.
Tools and Materials
Ames 48 in. Handle 8 in. x 8 in. Steel Tamper 2233400
Anvil D-Handle Utility Shovel 3531800
Quikrete 50 lb. 3/4 in. Gravel 115245

