powered by

Install Shelves

From Under-Stair Shelving · Step 8 of 10 · Video by BuiltWithTools

Showing 5:19–5:45 of the source video.

What happens in this clip

Install the shelves into the frame. Each shelf comes with its own set of instructions and screws. Position the shelf at the desired height within the frame and secure it by driving two screws into each side. The presenter advises finger-tightening all shelves initially to confirm the layout before final tightening. A drill with a torque setting is recommended for this step.

Goal: Integrate shelves into the frame structure

What's used

Tools

  • Drill/Impact Driver DeWalt (shown)
  • Screws Bott Smartvan (supplied)
  • Shelves Bott Smartvan
  • T30 Torx Thread Cutting Screw Bit Bott Smartvan (supplied)

About the full video

This video provides a detailed, step-by-step guide on how to install the Bott Smartvan modular storage system inside a cargo van. The process covers assembling the main frame structure, mounting it securely to the van's floor and ceiling, and then integrating various storage components such as shelves, systainer runners for drawers and boxes, perforated panels for tool hanging, and internal shelf dividers. The instructions emphasize proper alignment, use of supplied hardware and tools, and tips for effective customization and secure installation.

Step 8 of 10: Install Shelves

Position the shelves within the frame according to your design. Apply wood glue to the edges where the shelves meet the frame and secure them with screws. If you are installing adjustable shelves, attach the shelf pins or hardware according to the manufacturer's instructions.

Open this step in the guide

Other videos for this step

Under-Stair Shelving

Design and construct open shelving or a bookcase unit to fit within the under-stair space, maximizing storage and aesthetic appeal.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

powered by