From Under-Stair Shelving · Step 5 of 10 · Video by DIY Builds

Showing 0:11–0:58 of the source video.
Begin by setting up your miter saw for cutting lumber. The project utilizes two 2x8x12s, one 2x10x12, and five 12-foot long pieces of 1x6 decking. First, break down all the 2x8 and 2x10 lumber pieces to their approximate lengths as per the plans, using the miter saw. Ensure you make any necessary bevel cuts on these structural pieces. Next, transfer to the table saw to rip the 2x8 pieces down to a final width of 7 inches and the 2x10 pieces down to 8 inches. This step prepares all the main structural components of the steps.
Goal: Prepare all lumber pieces to their correct lengths and widths.
This project details the construction of custom, multi-level wooden steps for a hot tub. It involves cutting pressure-treated lumber to specific lengths and angles using a miter saw and table saw, assembling the frames with construction screws, and then covering the frames with decking boards. Special attention is paid to mitered corners and ensuring a consistent, finished look.
Using a circular saw, miter saw, or table saw, carefully cut each piece of lumber according to your cut list. Ensure all cuts are straight and accurate. For pieces that need to be angled to match the stair slope, set your saw to the correct angle.
Design and construct open shelving or a bookcase unit to fit within the under-stair space, maximizing storage and aesthetic appeal.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.