Final Cable Tensioning
From How to Tension and Adjust Stair Cable Railing · Step 7 of 8 · Video by Perkins Builder Brothers

Showing 6:42–7:06 of the source video. Watch the full video with every moment.
What happens in this clip
Tighten the through-post tensioners using a wrench. It's crucial to hold the threaded stud with locking pliers to prevent it from rotating as you tighten the nut. This ensures that the cable does not untwist, which could loosen its tension. Apply consistent tension across all cables to maintain a neat appearance and prevent excessive deflection. For the Revo system, the tensioning mechanism is hidden inside the post, creating a clean, seamless look.
Goal: Apply final tension to all cables using a wrench and locking pliers, ensuring uniform tightness and proper cable memory.
What's used
Tools
- Locking Pliers (Vise Grips)
- Tensioner Mechanism
- Wrench
About the full video
This video provides a comprehensive guide to installing a modern cable railing system on a deck, focusing on the Haas Cable Railing Revo system. It covers essential steps such as drilling post holes, preparing and terminating cables, understanding cable spacing rules for flat and sloped sections, and properly tensioning the system. The video also offers practical tips for achieving a professional finish, addressing common challenges, and adhering to building codes.
Step 7 of 8: Secure Tensioning Device
Once the desired tension is achieved for each cable, secure the tensioning device to prevent it from backing off due to vibrations or environmental changes. If using a turnbuckle, some models come with locking nuts or mechanisms. For threaded rods, ensure the nuts are tightened firmly against the post or any locking washer. Consider using thread-locking compound for added security, especially in outdoor or high-vibration environments.
Every video in How to Tension and Adjust Stair Cable Railing
Step 1: Initial Cable Engagement
- 0:06–0:26 Thread and Cut Cables
- 3:19–4:10 Thread Cable Railing
- 0:10–0:20 Uncoiling and Initial Cable Threading
Step 2: Attach Tensioning Fitting to First Cable End
- 8:20–9:15 Swage Cable onto Fittings
- 5:01–6:53 Thread and Terminate Tensioning Cable Ends
- 0:26–0:41 Secure and Tension Cables
Step 3: Install Tensioning Device at Opposite End
- 0:53–0:59 Install Tensioning Terminal
- 0:25–0:35 Attaching and Initial Tightening of Tensioning Terminals
- 8:35–9:31 Tighten Cable Tensioners
Step 4: Initial Cable Tensioning
- 1:06–1:30 Tension Cables
- 1:00–1:09 Hand-Tighten and Seat Cables
- 9:02–11:37 Tension the Cables
Step 5: Check for Sag and Vibration
- 0:29–0:46 Tension the Cables
- 1:06–1:30 Tension Cables
- 1:00–1:09 Hand-Tighten and Seat Cables
Step 6: Fine-Tuning Tension
- 0:29–0:46 Tension the Cables
- 12:30–13:00 Tension Cable Lines
- 1:09–1:18 Final Cable Tensioning
Step 7: Secure Tensioning Device
- 12:30–13:00 Tension Cable Lines
- 6:42–7:06 Final Cable Tensioning (this video)
- 1:06–1:30 Tension Cables
Step 8: Final Inspection and Trim Excess Cable
- 10:36–10:55 Trim Excess Cable & Install End Caps
- 1:30–1:40 Final Inspection and Completion
- 1:09–1:18 Final Cable Tensioning
How to Tension and Adjust Stair Cable Railing
This project outlines the steps to properly tension and adjust a cable railing system on a staircase, ensuring safety and a clean aesthetic.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

