From Landscape Steps · Step 1 of 8 · Video by JRM Carpentry

Showing 0:02–0:06 of the source video.
The first step involves assessing the sloped area where the steps will be built. This includes clearing any existing vegetation, debris, and loose soil to create a clean and workable space. The path for the steps needs to be determined, considering the desired width and length. Use a string line and measuring tape to mark the path precisely, and calculate the dimensions for the individual step risers and treads based on the slope's gradient and desired step comfort. Some initial excavation or leveling might be performed with a shovel to prepare for the first frame.
Goal: Prepare the site and determine step dimensions
This project guides you through building a set of durable outdoor steps using treated timber and gravel. It involves site preparation, cutting and assembling wooden frames for each step, carefully excavating and installing these frames along a sloped path, and finally filling them with decorative gravel to create a stable and aesthetically pleasing stairway.
Determine the desired height and depth of each step. Mark the desired location for the first step on the slope. Use a level to ensure the tread is horizontal and the riser is vertical. Outline the area for the first step and mark the positions for the timber retaining walls. Repeat this process for each subsequent step, ensuring consistent rise and run.
This project involves constructing timber and gravel steps on a slope to improve accessibility and aesthetics. The process includes planning the layout, excavating the area, building retaining walls for each step using timber, and filling the steps with compacted gravel for a durable and functional surface.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.