Extend the Staircase with Subsequent Steps
From Landscape Steps · Step 7 of 8 · Video by Wineberry Hill

Showing 3:14–4:09 of the source video. Watch the full video with every moment.
What happens in this clip
With the bottom riser securely anchored, place the next step in position. You will need to determine the optimal spacing based on the slope of your hillside, your preferred angle, and comfort. A common practice is to divide the space up evenly, ensuring that the bottom of the next riser aligns roughly with the top of the previous step. Once the position is determined, pre-drill holes on either side of the riser and screw it into the side stringers. Repeat this process, moving up the hillside, until all steps are installed.
Goal: Build the remaining steps up the hillside, ensuring proper spacing and stability
What's used
Tools
- Drill
- Lumber (for risers and steps)
Materials
- Screws
About the full video
This project demonstrates the easiest way to construct stairs for hillside gardens and terraces using pressure-treated lumber, a weed barrier, and gravel. The video focuses on building a scale model to illustrate the step-by-step process, emphasizing key considerations like riser height, material choice, anchoring, and proper backfilling.
Step 7 of 8: Construct Subsequent Steps
Using the layout marks, repeat steps 2 through 6 for each subsequent step. Ensure each new step's excavation starts at the back of the previous step's tread, creating a continuous series of steps.
Every video in Landscape Steps
Step 1: Plan and Mark Layout
- 0:02–0:06 Site Preparation and Measurement
- 0:00–0:04 Prepare the Site
- 0:43–1:05 Layout and Initial Placement of Steps
Step 2: Excavate for First Step
- 0:53–1:21 Excavate and Prepare Foundation Trench
- 1:28–2:20 Dig Trench and Level First Base
- 0:41–1:48 Excavate Terraces
Step 3: Install Retaining Timbers
- 1:21–2:04 Install and Secure First Timber Course
- 6:20–7:35 Install Landscape Timber Borders
- 4:12–5:11 Place First Timber Layer
Step 4: Compact Base Material
- 0:04–0:06 Base Preparation & Compaction
- 2:27–2:48 Compacting the Base Material
- 1:50–2:19 Install and Compact Crushed Stone Base
Step 5: Fill Step with Gravel
- 0:23–0:26 Fill Steps with Gravel
- 7:42–9:44 Fill Steps with Gravel
- 4:09–4:50 Backfill Bays with Gravel
Step 6: Backfill and Compact Behind Timbers
- 2:10–3:59 Backfill and Pack Soil
- 12:52–13:46 Backfill and Compact Soil
Step 7: Construct Subsequent Steps
- 0:07–0:14 Construct Remaining Steps and Treads
- 3:14–4:09 Extend the Staircase with Subsequent Steps (this video)
- 0:10–0:23 Excavate and Install Frames
Step 8: Final Grading and Drainage
- 0:14–0:24 Final Grading and Finishing
- 7:25–9:32 Backfill, Finalize, and Cure
- 0:30–0:47 Finish with Gravel Infill
Questions about Landscape Steps
Do I really need a plate compactor for the gravel steps, or can I compact it manually?
A plate compactor (like the Tomahawk Power eJXPC50 listed) significantly speeds up and improves compaction, which is crucial for step stability and preventing settling. While manual tamping is possible for small areas, a power compactor is highly recommended for a durable, long-lasting surface, especially for multiple steps. Inadequate compaction can lead to uneven surfaces and drainage issues over time.
What are the most important safety considerations when working on a sloped area with heavy timbers and excavation?
Always wear appropriate personal protective equipment, including work gloves, safety glasses, and sturdy boots. Be mindful of unstable soil during excavation and never work alone. When handling heavy timbers, use proper lifting techniques or get assistance to prevent back injuries, and ensure timbers are securely anchored before applying weight or stepping on them.
The project says 'beginner' difficulty, but 4 days seems like a long time. Is it really beginner-friendly, and what makes it take so long?
While the individual tasks are beginner-friendly in terms of skill, the 'beginner' rating refers more to the required skills than the physical effort or time commitment. The 4-day estimate accounts for significant manual labor, including extensive excavation, handling heavy timbers, and compacting multiple layers of material. Planning and ensuring precise leveling for each step are also time-consuming but crucial for a professional and safe finish.
What are common mistakes beginners make when building timber steps, and how can I avoid them?
A common mistake is inadequate preparation, leading to uneven steps or poor drainage. Ensure your layout is precise and each timber is perfectly level both front-to-back and side-to-side. Another error is insufficient compaction of the base and gravel layers, which can cause steps to sink or shift over time. Spend extra time on these foundational steps to prevent future problems.
Can I use different types of wood for the retaining timbers, or is pressure-treated essential for longevity?
Pressure-treated timber (like the 4x4s listed) is highly recommended for its resistance to rot and insects, which is crucial for ground contact and longevity in outdoor environments. While other woods might be cheaper upfront, they will deteriorate much faster, requiring replacement sooner. If using non-pressure-treated wood, consider applying a suitable wood preservative designed for ground contact and outdoor use.
The materials list includes both decomposed granite and crushed gravel. Do I need both, and what's the purpose of each?
Yes, both materials serve distinct purposes for optimal step construction. Decomposed granite (crushed rock fines) is often used as a compactable base layer, providing a stable foundation and improving drainage. The 3/8 inch crushed gravel then forms the durable, permeable walking surface that prevents pooling, offers good traction, and complements the aesthetics. Using both contributes to the stability, drainage, and finished look of your steps.
How important is drainage for these steps, especially on a slope, and how do I ensure it?
Proper drainage is critical to prevent water erosion, timber rot, and step instability, especially on a slope. Ensure each step has a slight forward pitch (about 1/8 inch per foot) to encourage water runoff away from the step faces. Additionally, good compaction of all fill materials aids in shedding water effectively and preventing water from saturating the step structure.
Landscape Steps
This project involves constructing timber and gravel steps on a slope to improve accessibility and aesthetics. The process includes planning the layout, excavating the area, building retaining walls for each step using timber, and filling the steps with compacted gravel for a durable and functional surface.