From Landscape Steps · Step 3 of 8 · Video by The Fixer

Showing 6:20–7:35 of the source video.
Install the prepared landscape timbers into the excavated trenches. For each timber, drill pilot holes and then secure it to the ground using 12-inch spikes. Use a hammer to drive the spikes through the timbers and into the compacted soil below. Ensure that the timbers are level and square, especially at the corners, using a level and a speed square. The creator opted for a single row of timbers. Repeat this process for all border timbers for both the main patio and the adjacent flower bed.
Goal: Create stable and level timber borders for the patio and flower bed.
This project details the step-by-step process of transforming a grassy backyard area into a functional and aesthetically pleasing patio featuring 6x6 hemlock timber borders, 3/8-inch golden brown stone, and integrated flower beds. It also includes steps for preparing the surrounding lawn for seeding, repainting the house foundation, and setting up patio furniture and a fire pit.
Place the main retaining timbers into the excavated trench. Ensure they are level and plumb. For added stability, drive stakes into the ground behind the timbers and secure the timbers to the stakes with screws. Backfill lightly around the timbers to hold them in place.
This project involves constructing timber and gravel steps on a slope to improve accessibility and aesthetics. The process includes planning the layout, excavating the area, building retaining walls for each step using timber, and filling the steps with compacted gravel for a durable and functional surface.