From Landscape Steps · Step 4 of 8 · Video by Boulder Landscapes LLC

Showing 0:04–0:06 of the source video.
For each excavated step area, lay down a layer of crushed stone or gravel, typically 4-6 inches (10-15 cm) deep. This layer provides a stable, well-draining foundation that helps prevent frost heave and settling. Spread the gravel evenly and then compact it thoroughly using a hand tamper for smaller areas or a plate compactor for larger projects. Repeat this process, adding material and compacting, until the base is firm, level, and meets the desired height for stone placement.
Goal: Create a stable, well-draining foundation for each step.
The video demonstrates the transformation of a muddy, unkempt garden path into a robust and aesthetically pleasing stone stairway. This DIY project involves careful planning, excavation, base preparation, and precise placement of natural stone slabs to create durable and accessible steps, enhancing the landscape's functionality and beauty. Although the video only shows the 'before' and 'after,' this guide provides comprehensive steps for how to achieve such a transformation.
Add a 2-3 inch layer of gravel or crushed stone at the bottom of the excavated step area, behind the retaining timbers. Compact this layer thoroughly using a hand tamper or plate compactor to create a stable base.
This project involves constructing timber and gravel steps on a slope to improve accessibility and aesthetics. The process includes planning the layout, excavating the area, building retaining walls for each step using timber, and filling the steps with compacted gravel for a durable and functional surface.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.