Mark Top and Bottom Stringer Cuts
From How to Lay Out a Stair Stringer with a Framing Square · Step 5 of 6 · Video by Training Hands Academy

Showing 8:10–9:35 of the source video. Watch the full video with every moment.
What happens in this clip
To complete the top of the stringer, turn the framing square 90 degrees and align the blade with the last marked tread line. Make sure it's perfectly lined up, then draw a horizontal line to finish off the top of the stringer. For the bottom of the stringer, line up the tongue of the framing square with the bottom marked tread, ensuring perfect alignment with the pencil mark and in the corner. Then measure and mark out the riser distance (7 and 5/16 inches in this case). This adjustment needs to be applied if your stringer is going to be attached to a subfloor first, and then finished flooring will be added on top. You need to drop the stringer by the thickness of the tread minus the thickness of the finished floor. For example, if your tread thickness is 1.5 inches, you need to remove that amount from the bottom of the stringer so that once the finished tread is added, your rise remains consistent.
Goal: Finalize the top and bottom cut lines of the stringer
What's used
Tools
- Framing Square
- Pencil
- Tape Measure
About the full video
This project provides a detailed guide on how to figure out the dimensions, lay out, and cut stair stringers for a basic set of stairs. It covers essential terminology, mathematical calculations for total rise, total run, unit rise, and unit run, as well as considerations for attachment methods and tread thickness. The instructions culminate in the marking and cutting of a wooden stringer using a framing square, circular saw, and hand saw.
Step 5 of 6: Mark the Nosing and Final Cut
After marking all the riser and tread lines, you need to account for the nosing, which is the part of the tread that overhangs the riser. Typically, this is about 1 inch. On your last tread mark, measure out the nosing distance (e.g., 1 inch) beyond the last riser line. This will create your nosing line. The final cut at the bottom of the stringer will be determined by this nosing line and the angle of the last tread. This creates the shape of the stringer that will sit flush on the lower subfloor.
Every video in How to Lay Out a Stair Stringer with a Framing Square
Step 1: Determine Total Rise and Run
- 0:15–0:29 Measure Total Rise
- 0:16–1:17 Measure and Calculate Total Rise
- 0:04–0:30 Measure Total Rise
Step 2: Calculate Number of Risers and Treads
- 2:59–6:51 Calculate Number of Risers and Treads
- 0:32–0:54 Calculate Number of Risers
- 8:59–9:54 Calculate Number of Risers and Treads
Step 3: Calculate Riser and Tread Dimensions
- 2:05–2:24 Calculate Individual Riser Height & Tread Depth
- 0:29–1:07 Calculate Rise and Run
- 3:02–4:45 Calculate Rise and Run Dimensions
Step 4: Mark the Stair Stringer with a Framing Square
- 2:53–7:59 Mark the Stringers and Adjust for Treads
- 6:42–8:10 Lay Out the Stringer Using a Framing Square
- 6:59–9:34 Mark the Stair Stringer for Cutting
Step 5: Mark the Nosing and Final Cut
- 3:45–4:47 Correct Straight Stringer Layout
- 8:10–9:35 Mark Top and Bottom Stringer Cuts (this video)
- 3:10–3:59 Mark the Stringer Board
Step 6: Cut the Stair Stringer
- 0:42–0:53 Cut the Stringers
- 15:12–19:27 Cutting the Stair Stringer
- 2:42–3:34 Cut Stair Stringers
How to Lay Out a Stair Stringer with a Framing Square
This project outlines the process of accurately marking and laying out a stair stringer using a framing square, a crucial step for ensuring safe and correctly proportioned stairs.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

