From Deck Stairs · Step 8 of 8 · Video by Cottage Life

Showing 5:07–5:29 of the source video.
Once all deck boards and stairs are installed, conduct a final inspection to ensure all fasteners are secure, boards are properly spaced, and the entire structure is stable and safe. Address any loose ends, rough edges, or minor imperfections. After the inspection, clear the work area of any sawdust, scrap lumber, tools, and packaging. Dispose of waste materials properly. The completed deck, with its fresh treated lumber, should now be a durable and aesthetically pleasing outdoor living space.
This video details the process of revitalizing an existing deck by replacing old deck boards and repairing the underlying structure. The project includes reinforcing a crumbling concrete pier, applying joist tape for moisture protection, installing new MicroPro Sienna treated lumber deck boards, and constructing new stairs using custom-cut stringers. The video emphasizes maintaining a solid foundation and joist system to efficiently upgrade a deck.
Thoroughly inspect all connections, fasteners, and components to ensure they are secure and stable. Check for any sharp edges or splinters and address them. If desired, apply a protective finish such as stain, sealant, or paint to protect the wood from the elements and enhance its appearance. Ensure all safety features, like railings, meet code requirements.
This project outlines the process of building deck stairs using pre-cut stringers. It covers site preparation, attaching the stringers to the deck, securing them to the ground, and installing treads and railings. Safety is paramount throughout the process, and it's recommended to consult local building codes and consider hiring a professional for complex steps.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.