From Deck Stairs · Step 3 of 8 · Video by Lowe's Home Improvement

Showing 3:14–3:53 of the source video.
Install a 2x8 board directly below the deck joist where the stairs will attach; this provides a solid anchoring point. Secure the cut stringers to this 2x8 using metal stringer hangers and appropriate fasteners. Ensure the stringers and hangers are flush with the top of the 2x8. Next, attach the outer stringers to the previously installed newel posts at the bottom of the stairs. Drill pilot holes near the ends of the boards before driving screws to prevent splitting. Then, install any remaining interior stringers, securing them to the 2x8 at the top and to the footers at the bottom with suitable bracing, anchors, and carriage bolts, ensuring they are level and plumb.
Goal: Securely attach the stringers to the deck frame and stabilize the lower posts.
This project provides a step-by-step guide on how to build composite stairs and install railings for a deck. It covers calculating stair dimensions, installing footers and posts, marking and cutting stringers, attaching them to the deck, installing toe kicks and treads, and finally assembling and securing the composite railing system.
Align the top of each pre-cut stringer with the corresponding marks on the deck ledger board. Ensure the stringers are flush with the edge of the ledger board. Secure each stringer using appropriate fasteners, such as lag screws or structural screws, ensuring they are driven straight and are long enough to penetrate well into the ledger board and the stringer.
This project outlines the process of building deck stairs using pre-cut stringers. It covers site preparation, attaching the stringers to the deck, securing them to the ground, and installing treads and railings. Safety is paramount throughout the process, and it's recommended to consult local building codes and consider hiring a professional for complex steps.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.