powered by

Attach Stringers and Secure Lower Posts

From Deck Stairs · Step 3 of 8 · Video by Lowe's Home Improvement

Showing 3:14–3:53 of the source video. Watch the full video with every moment.

What happens in this clip

Install a 2x8 board directly below the deck joist where the stairs will attach; this provides a solid anchoring point. Secure the cut stringers to this 2x8 using metal stringer hangers and appropriate fasteners. Ensure the stringers and hangers are flush with the top of the 2x8. Next, attach the outer stringers to the previously installed newel posts at the bottom of the stairs. Drill pilot holes near the ends of the boards before driving screws to prevent splitting. Then, install any remaining interior stringers, securing them to the 2x8 at the top and to the footers at the bottom with suitable bracing, anchors, and carriage bolts, ensuring they are level and plumb.

Goal: Securely attach the stringers to the deck frame and stabilize the lower posts.

What's used

Tools

  • Carriage Bolts
  • Drill/Impact Driver Kobalt
  • Hammer
  • Lumber for Bracing
  • Safety Glasses
  • Stringer Hangers Simpson Strong-Tie
  • Treated Lumber (2x8)
  • Wood Screws

About the full video

This project provides a step-by-step guide on how to build composite stairs and install railings for a deck. It covers calculating stair dimensions, installing footers and posts, marking and cutting stringers, attaching them to the deck, installing toe kicks and treads, and finally assembling and securing the composite railing system.

Step 3 of 8: Attach Stringers to Deck

Align the top of each pre-cut stringer with the corresponding marks on the deck ledger board. Ensure the stringers are flush with the edge of the ledger board. Secure each stringer using appropriate fasteners, such as lag screws or structural screws, ensuring they are driven straight and are long enough to penetrate well into the ledger board and the stringer.

Open this step in the guide

Every video in Deck Stairs

  1. Step 1: Prepare the Stair Location

  2. Step 2: Mark Stringer Placement

  3. Step 3: Attach Stringers to Deck

  4. Step 4: Secure Stringers to Ground

  5. Step 5: Cut and Attach Risers (Optional)

  6. Step 6: Install Treads

  7. Step 7: Install Railings

  8. Step 8: Final Inspection and Finishing Touches

Questions about Deck Stairs

What tools and materials are essential for building deck stairs using pre-cut stringers?

You will need basic tools like a measuring tape, level, drill with drill bits, shovel, and rake for site preparation. Key materials include pre-cut pressure-treated pine stair stringers, gravel and concrete mix for securing the base, appropriate exterior structural lag screws, and decking boards for the treads. The specific list provided includes items like Anvil digging shovel, OX marking pencil, Empire plumb bob, Quikrete gravel, SAKRETE concrete mix, SPAX lag screws, and Composite Decking Boards.

What are the most critical safety precautions I should take when building deck stairs?

Safety is paramount for structural projects like deck stairs. Always wear appropriate personal protective equipment, including safety glasses, gloves, and sturdy footwear. Ensure all connections are secure and stable, especially where stringers attach to the deck and ground. Always follow manufacturer's instructions for materials and power tools, and verify stability at each step.

How can I ensure my deck stairs comply with local building codes?

Compliance with local building codes is crucial for safety and legality. Before starting, consult your local building department for requirements on rise, run, width, handrails, and foundation for deck stairs. These codes vary by location and are designed to prevent structural failure and ensure safe use. Hiring a licensed professional can help navigate these complex requirements.

What common mistakes should a beginner avoid when installing pre-cut stair stringers?

A common mistake is improper site preparation, leading to unstable ground support. Ensure the ground is level, well-compacted, and has adequate drainage using gravel and pavers. Another error is not securely attaching the stringers to both the deck and the ground, which can compromise the entire structure's stability. Always double-check measurements and use a plumb bob and level for accurate placement.

What is the estimated time commitment and difficulty for this deck stair project?

This project is rated as 'beginner' difficulty with an estimated time of 3 days. However, factors like your experience level, site conditions, and adherence to local codes can extend this. Breaking the project into manageable steps and having all tools and materials ready will help keep it on schedule.

Are there alternative materials or methods for securing deck stair stringers to the ground?

While the project suggests gravel, concrete mix, and pavers, alternative methods for ground support include concrete footings or pre-cast concrete piers. The chosen method depends on local frost lines, soil conditions, and building codes. Always ensure the ground connection is robust and prevents settlement or shifting over time.

Deck Stairs

This project outlines the process of building deck stairs using pre-cut stringers. It covers site preparation, attaching the stringers to the deck, securing them to the ground, and installing treads and railings. Safety is paramount throughout the process, and it's recommended to consult local building codes and consider hiring a professional for complex steps.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Attach Stringers and Secure Lower Posts — Deck Stairs | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.