powered by

Backfill the Wall

From How to Build Backyard Steps with Railroad Ties or Landscape Timbers · Step 6 of 7 · Video by Next Level Gardening

Showing 14:20–15:54 of the source video. Watch the full video with every moment.

What happens in this clip

Backfilling is a critical step that ensures the stability and longevity of your retaining wall. You need to create a 4-inch thick layer of gravel directly behind the wall for drainage before adding soil. To do this, use two 2x4s or 4x4s (4x4s offer more stability) placed upright at intervals behind the wall. Then, position a scrap piece of plywood (roughly the same height as the wall) against the 2x4/4x4s, creating a temporary barrier. Pile some soil behind the plywood to hold it firmly in place. Now, dump gravel into the 4-inch space created between the back of the wall and the plywood barrier. Once the space is filled with gravel, carefully shimmy the plywood upwards to remove it, leaving a clean, vertical 4-inch gravel drain. This gravel layer prevents hydrostatic pressure buildup, facilitates water drainage, and acts as a filter to prevent soil from washing out through the front of the wall. After the gravel drainage layer is in place, backfill the remaining area behind it with soil.

Goal: Create a proper drainage layer with gravel behind the wall before backfilling with soil, using a plywood and lumber system.

What's used

Tools

  • 2x4 or 4x4 Lumber
  • Plywood
  • Shovel

Materials

  • Gravel RCP Block & Brick
  • Soil

About the full video

This detailed instructional video demonstrates how to construct a tiered garden using a Keystone Retaining Wall System. The project transforms an unusable sloped hillside into multiple flat, plantable areas. Steps include site preparation, trenching, establishing a gravel base, carefully laying and leveling multiple courses of retaining wall blocks, installing alignment pins, backfilling, and finishing with capstones. The video emphasizes precise leveling and proper drainage techniques for a stable and aesthetically pleasing result.

What's said in this clip

than I ever thought it would be." But you're not quite done yet. At this point, you've just got a wall standing out in the middle of nothing. We need to backfill. But it's not just as simple as filling in dirt along the backside of the wall. We still need a 4-in gap between the soil and the wall, and that's going to be filled in with gravel. Does two things. Keeps the drainage next to the wall good. Drains it right down into the gravel that's underneath the wall and out one end. It also filters the mud from the the soil behind it. When you water it, you don't want that mud running out the front of your wall. And so that gravel will act as a filter for that. But how do we get a 4-in run of gravel against the dirt or between the dirt and the wall? Couple of 2 by 4s or 4 by 4s. 4 by 4s are a little more stable. Just set them up like that. Get a scrap piece of plywood that's roughly the same height as the wall. Pile your soil behind here to hold that up. And then dump your gravel in the space between the wall and the the plywood. And then it takes a little muscle, but once that's filled in, you can slowly shimmy this up and you'll have your 4-in thick layer of gravel before you hit the soil. So, a quick

Automatically transcribed from the source video.

Step 6 of 7: Backfill and Compact

After the timbers are secured, backfill the space behind each timber with gravel or compacted soil. Gravel is preferable as it aids in drainage and prevents water from pooling against the timbers, which can lead to rot. Compact the backfill material thoroughly with a tamping tool or by hand to create a solid structure and prevent settling over time.

Open this step in the guide

Every video in How to Build Backyard Steps with Railroad Ties or Landscape Timbers

  1. Step 1: Plan the Step Location and Dimensions

  2. Step 2: Excavate for the First Step

  3. Step 3: Cut and Position the First Timber

  4. Step 4: Prepare and Position Subsequent Timbers

  5. Step 5: Secure the Timbers

  6. Step 6: Backfill and Compact

  7. Step 7: Add Finishing Touches and Test Stability

Questions about How to Build Backyard Steps with Railroad Ties or Landscape Timbers

What are the essential tools needed for cutting the heavy railroad ties or landscape timbers?

A powerful chainsaw is highly recommended for efficient and clean cuts on thick railroad ties and landscape timbers. Always ensure the chain is sharp and use appropriate safety gear like chaps, gloves, and eye protection. A circular saw may work for thinner landscape timbers but will struggle with railroad ties.

What safety precautions should I take when working with creosote-treated railroad ties?

Used railroad ties are often treated with creosote, which can irritate skin and eyes and is harmful if ingested or inhaled. Wear heavy-duty gloves, long sleeves, safety glasses, and a dust mask or respirator. Avoid burning creosote-treated wood, as the fumes are toxic, and check local regulations for disposal.

How difficult is this project for a beginner, and what's a realistic time commitment?

This project is rated as beginner-friendly, but it involves significant physical labor, including heavy lifting and digging. Realistically, plan for about three full days of work, especially if you're working alone or need time for material transport and site preparation. Taking time for precise measurements and proper compaction is crucial.

What are common mistakes beginners make when building these steps, and how can I avoid them?

A common mistake is inadequate site preparation, such as not creating a level, compacted base, which leads to unstable steps. Another error is not securing timbers sufficiently; always use rebar stakes and lag screws to prevent shifting. Also, ensure proper drainage to avoid water accumulation and erosion.

Can I use untreated lumber instead of railroad ties or treated landscape timbers for this project?

Untreated lumber is not recommended for ground contact as it will quickly rot and decompose due to moisture and insects. For longevity and structural integrity, always use materials rated for ground contact, such as pressure-treated lumber (specific for ground contact) or naturally rot-resistant wood like cedar, though these may be more expensive.

How do I ensure the steps remain stable and don't shift or sink over time?

Stability is achieved through several key steps: a properly excavated and compacted gravel base for each timber layer, overlapping timbers for strength, and securing each timber with long rebar stakes driven deep into the ground. Adequate drainage and backfilling with compacted soil also prevent erosion and shifting.

How to Build Backyard Steps with Railroad Ties or Landscape Timbers

Outline for building backyard steps using railroad ties or landscape timbers. This involves planning, site preparation, cutting and fitting timbers, securing them, and ensuring stability and safety.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Backfill the Wall — How to Build Backyard Steps with Railroad Ties or Landscape Timbers | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.