
Clip 1/3
Helpful?
Step 6 · Backfill and Compact
After the timbers are secured, backfill the space behind each timber with gravel or compacted soil. Gravel is preferable as it aids in drainage and prevents water from pooling against the timbers, which can lead to rot. Compact the backfill material thoroughly with a tamping tool or by hand to create a solid structure and prevent settling over time.
Tools and Materials
Bullet Tools Ergonomic Flooring Tapping Block 711
Shovel
Quikrete 50 lb. 3/4 in. Gravel 115245
Landmaster 4 ft. x 100 ft. Commercial Weed Barrier Landscape Fabric, Heavy Duty

