Position, Level, and Anchor First Step
From How to Build Backyard Steps with Railroad Ties or Landscape Timbers · Step 2 of 7 · Video by AZ Highland Homestead

Showing 2:30–4:03 of the source video. Watch the full video with every moment.
What happens in this clip
Begin by roughly positioning the first landscape timber where the lowest step will be. Use the level to determine how much soil needs to be removed from the higher side to make the timber level. Dig out the necessary soil, ensuring a flat bed for the timber. Once the timber is positioned and leveled, drive the 1-foot sections of rebar through the pre-drilled holes in the timber and into the ground using a hammer or sledgehammer until the timber is securely anchored. The video demonstrates this with two rebar sections per timber. Confirm the timber remains level after driving the rebar.
Goal: Securely install and level the first landscape timber.
What's used
Tools
- Landscape Timbers (prepared)
- Level
- Rebar (1-foot sections)
- Shovel
- Sledgehammer TRUPER
- Tape Measure
About the full video
This project guides you through building durable and stable landscape timber stairs for sloped areas, specifically demonstrated for access to a chicken run. It involves cutting landscape timbers and rebar to size, drilling holes, leveling the ground, securing timbers with rebar, and backfilling with decomposed granite for a safe and easy ascent.
What's said in this clip
and maybe even a sledge and then you're also going to need a tape measure of course and you're gonna need a way to level out your soil uh this is how our uh chicken run door looks currently and it slopes down we put some decomposed granite here as a path but we're really we're not slipping too much but our footing is off balance and it's not so easy and um we have other people that uh come to our homestead to take a look and when they walk up to take a look at our chickens here or hold the chicken it's it's not sure footing so we definitely want to make sure that it's uh easy and safe to walk up to the chicken coop so we've just kind of laid out these two and we're gonna go about leveling them off so as you can probably see right now this side is lower than this side is over here so we're gonna try to take away some material on this uphill side and uh make it level with the lower part here and then we've measured this part out we're going to be rounding this curve here as it comes down and so we're measuring here this is about a foot apart i think at the moment we are just kind of trying it out it's about foot away from the door then a foot here and it's definitely uh longer than a foot over here of course but as we go we will probably have them uh come along every foot or so i think until we get down to the bottom here where it's uh level already all right there's the
Automatically transcribed from the source video.
Step 2 of 7: Excavate for the First Step
Excavate the area where the first railroad tie or landscape timber will be placed. The depth of the excavation should be sufficient to allow the timber to sit slightly below or flush with the surrounding ground level, depending on your design. This creates a more integrated and stable base. Ensure the bottom of the excavation is level and compacted to prevent settling.
Every video in How to Build Backyard Steps with Railroad Ties or Landscape Timbers
Step 1: Plan the Step Location and Dimensions
- 0:01–0:43 Plan and Measure Embankment
- 0:01–0:59 Site Assessment and Initial Clearing
- 0:03–0:58 Site Assessment and Step Calculation
Step 2: Excavate for the First Step
- 2:30–4:03 Position, Level, and Anchor First Step (this video)
- 1:14–1:29 Position and Level Ties
- 1:28–2:20 Dig Trench and Level First Base
Step 3: Cut and Position the First Timber
- 1:14–1:29 Position and Level Ties
- 2:30–4:03 Position, Level, and Anchor First Step
- 0:00–0:02 Cut Wooden Timbers for Risers
Step 4: Prepare and Position Subsequent Timbers
- 2:15–4:00 Assemble and Secure Step Timbers
- 1:14–1:29 Position and Level Ties
- 0:07–0:14 Construct Remaining Steps and Treads
Step 5: Secure the Timbers
- 6:06–7:11 Secure Timbers with Rebar Stakes
- 5:11–5:36 Anchor First Timber Layer with Rebar
- 1:21–1:55 Anchor the Base Timber with Rebar
Step 6: Backfill and Compact
- 20:20–22:50 Backfill and Level the Ground
- 2:36–2:57 Install Geotextile and Backfill
- 14:20–15:54 Backfill the Wall
Step 7: Add Finishing Touches and Test Stability
- 8:40–9:55 Inspect and Refine Staircase
- 0:26–0:30 Final Inspection and Cleanup
- 0:14–0:24 Final Grading and Finishing
Questions about How to Build Backyard Steps with Railroad Ties or Landscape Timbers
What are the essential tools needed for cutting the heavy railroad ties or landscape timbers?
A powerful chainsaw is highly recommended for efficient and clean cuts on thick railroad ties and landscape timbers. Always ensure the chain is sharp and use appropriate safety gear like chaps, gloves, and eye protection. A circular saw may work for thinner landscape timbers but will struggle with railroad ties.
What safety precautions should I take when working with creosote-treated railroad ties?
Used railroad ties are often treated with creosote, which can irritate skin and eyes and is harmful if ingested or inhaled. Wear heavy-duty gloves, long sleeves, safety glasses, and a dust mask or respirator. Avoid burning creosote-treated wood, as the fumes are toxic, and check local regulations for disposal.
How difficult is this project for a beginner, and what's a realistic time commitment?
This project is rated as beginner-friendly, but it involves significant physical labor, including heavy lifting and digging. Realistically, plan for about three full days of work, especially if you're working alone or need time for material transport and site preparation. Taking time for precise measurements and proper compaction is crucial.
What are common mistakes beginners make when building these steps, and how can I avoid them?
A common mistake is inadequate site preparation, such as not creating a level, compacted base, which leads to unstable steps. Another error is not securing timbers sufficiently; always use rebar stakes and lag screws to prevent shifting. Also, ensure proper drainage to avoid water accumulation and erosion.
Can I use untreated lumber instead of railroad ties or treated landscape timbers for this project?
Untreated lumber is not recommended for ground contact as it will quickly rot and decompose due to moisture and insects. For longevity and structural integrity, always use materials rated for ground contact, such as pressure-treated lumber (specific for ground contact) or naturally rot-resistant wood like cedar, though these may be more expensive.
How do I ensure the steps remain stable and don't shift or sink over time?
Stability is achieved through several key steps: a properly excavated and compacted gravel base for each timber layer, overlapping timbers for strength, and securing each timber with long rebar stakes driven deep into the ground. Adequate drainage and backfilling with compacted soil also prevent erosion and shifting.
How to Build Backyard Steps with Railroad Ties or Landscape Timbers
Outline for building backyard steps using railroad ties or landscape timbers. This involves planning, site preparation, cutting and fitting timbers, securing them, and ensuring stability and safety.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

