Final Grading and Finishing
From How to Build Backyard Steps with Railroad Ties or Landscape Timbers · Step 7 of 7 · Video by Adventures in Lake Living

Showing 0:14–0:24 of the source video. Watch the full video with every moment.
What happens in this clip
Once all the timbers are installed and the treads are formed and compacted, perform the final grading around the new steps. This involves smoothing out the surrounding soil to integrate the steps seamlessly into the landscape and ensure proper drainage away from the structure. The final visual of the video shows the completed steps nestled into the terrain. You can also add decorative elements like landscape fabric, mulch, or plants alongside the steps for an aesthetically pleasing and finished look.
Goal: Integrate the steps into the landscape and ensure proper drainage
What's used
Tools
- Rake
Materials
- Landscape Fabric (Optional)
- Mulch or Decorative Gravel (Optional)
- River rock
About the full video
This project guides you through building durable outdoor steps on a sloped terrain using heavy wooden timbers, commonly railroad ties. The process involves precise cutting of timbers, extensive digging and leveling to create stable foundations, installing the timbers as risers, and backfilling with soil to form the step treads, culminating in a functional and integrated landscape feature.
Step 7 of 7: Add Finishing Touches and Test Stability
Once the main structure is complete and backfilled, you can add any final touches. This might include adding a cap timber on top for a finished look, or planting ground cover around the steps. Before using them, rigorously test the stability of each step by applying weight and ensuring there is no wobble or movement. Clear away any remaining debris from the work area.
Every video in How to Build Backyard Steps with Railroad Ties or Landscape Timbers
Step 1: Plan the Step Location and Dimensions
- 0:01–0:43 Plan and Measure Embankment
- 0:01–0:59 Site Assessment and Initial Clearing
- 0:03–0:58 Site Assessment and Step Calculation
Step 2: Excavate for the First Step
- 2:30–4:03 Position, Level, and Anchor First Step
- 1:14–1:29 Position and Level Ties
- 1:28–2:20 Dig Trench and Level First Base
Step 3: Cut and Position the First Timber
- 1:14–1:29 Position and Level Ties
- 2:30–4:03 Position, Level, and Anchor First Step
- 0:00–0:02 Cut Wooden Timbers for Risers
Step 4: Prepare and Position Subsequent Timbers
- 2:15–4:00 Assemble and Secure Step Timbers
- 1:14–1:29 Position and Level Ties
- 0:07–0:14 Construct Remaining Steps and Treads
Step 5: Secure the Timbers
- 6:06–7:11 Secure Timbers with Rebar Stakes
- 5:11–5:36 Anchor First Timber Layer with Rebar
- 1:21–1:55 Anchor the Base Timber with Rebar
Step 6: Backfill and Compact
- 20:20–22:50 Backfill and Level the Ground
- 2:36–2:57 Install Geotextile and Backfill
- 14:20–15:54 Backfill the Wall
Step 7: Add Finishing Touches and Test Stability
- 8:40–9:55 Inspect and Refine Staircase
- 0:26–0:30 Final Inspection and Cleanup
- 0:14–0:24 Final Grading and Finishing (this video)
Questions about How to Build Backyard Steps with Railroad Ties or Landscape Timbers
What are the essential tools needed for cutting the heavy railroad ties or landscape timbers?
A powerful chainsaw is highly recommended for efficient and clean cuts on thick railroad ties and landscape timbers. Always ensure the chain is sharp and use appropriate safety gear like chaps, gloves, and eye protection. A circular saw may work for thinner landscape timbers but will struggle with railroad ties.
What safety precautions should I take when working with creosote-treated railroad ties?
Used railroad ties are often treated with creosote, which can irritate skin and eyes and is harmful if ingested or inhaled. Wear heavy-duty gloves, long sleeves, safety glasses, and a dust mask or respirator. Avoid burning creosote-treated wood, as the fumes are toxic, and check local regulations for disposal.
How difficult is this project for a beginner, and what's a realistic time commitment?
This project is rated as beginner-friendly, but it involves significant physical labor, including heavy lifting and digging. Realistically, plan for about three full days of work, especially if you're working alone or need time for material transport and site preparation. Taking time for precise measurements and proper compaction is crucial.
What are common mistakes beginners make when building these steps, and how can I avoid them?
A common mistake is inadequate site preparation, such as not creating a level, compacted base, which leads to unstable steps. Another error is not securing timbers sufficiently; always use rebar stakes and lag screws to prevent shifting. Also, ensure proper drainage to avoid water accumulation and erosion.
Can I use untreated lumber instead of railroad ties or treated landscape timbers for this project?
Untreated lumber is not recommended for ground contact as it will quickly rot and decompose due to moisture and insects. For longevity and structural integrity, always use materials rated for ground contact, such as pressure-treated lumber (specific for ground contact) or naturally rot-resistant wood like cedar, though these may be more expensive.
How do I ensure the steps remain stable and don't shift or sink over time?
Stability is achieved through several key steps: a properly excavated and compacted gravel base for each timber layer, overlapping timbers for strength, and securing each timber with long rebar stakes driven deep into the ground. Adequate drainage and backfilling with compacted soil also prevent erosion and shifting.
How to Build Backyard Steps with Railroad Ties or Landscape Timbers
Outline for building backyard steps using railroad ties or landscape timbers. This involves planning, site preparation, cutting and fitting timbers, securing them, and ensuring stability and safety.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

