Position and Level Ties

From How to Build Backyard Steps with Railroad Ties or Landscape Timbers · Step 3 of 7 · Video by How To Video Channel

Showing 1:14–1:29 of the source video. Watch the full video with every moment.

What happens in this clip

Once the area is dug and the ties are sized, place a railroad tie into its designated spot. Use a level to ensure the tie is perfectly level across its width. Additionally, slightly angle the tie upwards towards the hill (back to front) to allow for proper drainage and prevent water from pooling on the step. This backward tilt helps keep the steps drier and reduces wear.

Goal: Set railroad ties correctly and level

What's used

Tools

  • Level
  • Railroad Tie

About the full video

This project provides instructions on how to build stable and long-lasting steps using railroad ties and wooden stakes. The process involves preparing the site, sizing the ties, securing them with stakes, and backfilling with compacted soil.

What's said in this clip

sledgehammer and beat it until it cracks in half that makes a step a little less tall from then once you have it set you can set it level it with a level you want your steps to be angled up the hill a little bit so it'll be level this way and then tilted it back this way then you can use either Stakes or rebar if

Automatically transcribed from the source video.

Step 3 of 7: Cut and Position the First Timber

Using a saw, cut your railroad tie or landscape timber to the planned width of your steps. Carefully place the cut timber into the excavated area. Use a level to ensure it is perfectly horizontal. If it's not stable, add or remove soil from beneath it and re-compact until it is firmly seated and level.

Open this step in the guide

Every video in How to Build Backyard Steps with Railroad Ties or Landscape Timbers

  1. Step 1: Plan the Step Location and Dimensions

  2. Step 2: Excavate for the First Step

  3. Step 3: Cut and Position the First Timber

  4. Step 4: Prepare and Position Subsequent Timbers

  5. Step 5: Secure the Timbers

  6. Step 6: Backfill and Compact

  7. Step 7: Add Finishing Touches and Test Stability

Questions about How to Build Backyard Steps with Railroad Ties or Landscape Timbers

What are the essential tools needed for cutting the heavy railroad ties or landscape timbers?

A powerful chainsaw is highly recommended for efficient and clean cuts on thick railroad ties and landscape timbers. Always ensure the chain is sharp and use appropriate safety gear like chaps, gloves, and eye protection. A circular saw may work for thinner landscape timbers but will struggle with railroad ties.

What safety precautions should I take when working with creosote-treated railroad ties?

Used railroad ties are often treated with creosote, which can irritate skin and eyes and is harmful if ingested or inhaled. Wear heavy-duty gloves, long sleeves, safety glasses, and a dust mask or respirator. Avoid burning creosote-treated wood, as the fumes are toxic, and check local regulations for disposal.

How difficult is this project for a beginner, and what's a realistic time commitment?

This project is rated as beginner-friendly, but it involves significant physical labor, including heavy lifting and digging. Realistically, plan for about three full days of work, especially if you're working alone or need time for material transport and site preparation. Taking time for precise measurements and proper compaction is crucial.

What are common mistakes beginners make when building these steps, and how can I avoid them?

A common mistake is inadequate site preparation, such as not creating a level, compacted base, which leads to unstable steps. Another error is not securing timbers sufficiently; always use rebar stakes and lag screws to prevent shifting. Also, ensure proper drainage to avoid water accumulation and erosion.

Can I use untreated lumber instead of railroad ties or treated landscape timbers for this project?

Untreated lumber is not recommended for ground contact as it will quickly rot and decompose due to moisture and insects. For longevity and structural integrity, always use materials rated for ground contact, such as pressure-treated lumber (specific for ground contact) or naturally rot-resistant wood like cedar, though these may be more expensive.

How do I ensure the steps remain stable and don't shift or sink over time?

Stability is achieved through several key steps: a properly excavated and compacted gravel base for each timber layer, overlapping timbers for strength, and securing each timber with long rebar stakes driven deep into the ground. Adequate drainage and backfilling with compacted soil also prevent erosion and shifting.

How to Build Backyard Steps with Railroad Ties or Landscape Timbers

Outline for building backyard steps using railroad ties or landscape timbers. This involves planning, site preparation, cutting and fitting timbers, securing them, and ensuring stability and safety.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Position and Level Ties — How to Build Backyard Steps with Railroad Ties or Landscape Timbers | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.