powered by

Project Completion

From How to Put Carpet Treads on Already-Carpeted Stairs · Step 6 of 6 · Video by Performance Accessories

Showing 3:06–3:19 of the source video. Watch the full video with every moment.

What happens in this clip

Once all installation steps are complete, including securing risers, treads, and optional return trim, and after allowing the adhesive to fully dry (typically 24 to 48 hours), your beautiful new stairs are ready to use. Enjoy your newly updated staircase for years to come!

Goal: Complete the stair tread installation

About the full video

This project provides step-by-step instructions for properly installing performance accessory stair treads and risers. It covers preparation, precise measuring and cutting, adhesive application, securing with a finish nailer, caulking expansion gaps, and installing optional return trim for exposed stair sides. The guide emphasizes the importance of specific adhesive types and proper expansion gaps for a durable and aesthetically pleasing finish.

Step 6 of 6: Allow Adhesive to Cure

Refer to the adhesive's product information for the recommended curing time. This is crucial for ensuring the carpet treads are securely bonded and will not shift or detach with use. Avoid walking on the stairs or placing any heavy objects on the treads during this period.

Open this step in the guide

Every video in How to Put Carpet Treads on Already-Carpeted Stairs

  1. Step 1: Clean Existing Carpet Surface

  2. Step 2: Measure and Mark Tread Placement

  3. Step 3: Prepare Carpet Treads (If Necessary)

  4. Step 4: Apply Adhesive to Carpet Treads

  5. Step 5: Position and Press Carpet Treads

  6. Step 6: Allow Adhesive to Cure

How to Put Carpet Treads on Already-Carpeted Stairs

This project outlines the process of applying carpet treads to stairs that are already carpeted, enhancing safety and aesthetics. It involves preparing the existing carpet, cutting the treads to size, and securely attaching them. This covers the steps from initial measurement to final application.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Project Completion — How to Put Carpet Treads on Already-Carpeted Stairs | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.