How to Build Block Steps with Natural Stone Caps
Video by I Am a Hardscaper · 2 moments used in Oak Valley Designs's DIY guides · 8:50 long

Moments in this video
- 1:15–1:48 Prepare the Stable Base
From How to Add a Step at a Too-High Back Door, Step 3: Install Gravel Base and Compact
Once the area is cleared, compact the exposed subsoil thoroughly to create a stable foundation. Install a non-woven geotextile fabric over the compacted subsoil. This fabric acts as a separator, preventing the base material from mixing with the subsoil. Next, add a layer of A gravel in 3 to 4-inch lifts, compacting each lift with a plate compactor (e.g., Bartell BR1570). Ensure the A gravel is slightly moist (not too wet, not too dry) during compaction to achieve optimal density. Aim for a total compacted base thickness of 7 to 8 inches.
- 1:15–1:48 Prepare the Stable Base
From How to Level a Sinking Paver Step, Step 2: Stabilize the Base Material
Once the area is cleared, compact the exposed subsoil thoroughly to create a stable foundation. Install a non-woven geotextile fabric over the compacted subsoil. This fabric acts as a separator, preventing the base material from mixing with the subsoil. Next, add a layer of A gravel in 3 to 4-inch lifts, compacting each lift with a plate compactor (e.g., Bartell BR1570). Ensure the A gravel is slightly moist (not too wet, not too dry) during compaction to achieve optimal density. Aim for a total compacted base thickness of 7 to 8 inches.
Guides that use this video
Transcript
0:03 what's happening hardscapers we have a client problem that we're going to be solving here for their front entrance let's get into this so this client called me up and they had their steps front steps just completely falling apart two steps at the front and two steps uh after a small Landing here completely falling apart it's a complete lawsuit waiting to happen that glue is just not adhering properly to this capsule they just fall over somebody twists their ankle breaks their leg whatever it might be so we're coming in and fixing and here's what we do when we go about fixing something like this so we're going to be replacing these two steps as well as those two steps and relaying this Landing here we're gonna cut the curve and instead we're going to be using mini created from TECO block
0:48 and these six foot 16 inch tread Natural Stone steps caps so you can see here how much that is just collapsing in on itself leaning forward it's all built on stone dust caps are just completely coming off we're gonna go ahead fix this up as well so we've removed the stone dust the steps were built on just complete crap stone dust never use it we don't use it took it out compacted the subsoil installed a non-woven geotextile and then compacted a gravel three inch lifts three to four inch to get about seven to eight inches of base now you notice we are using our BR 1570 this is good for about three and a
1:34 half inches of material so that's why we compact this in lifts of three to four inches no more and we want to make sure that our a gravel is nice and moist we've got water added to it not too much but not too little it can't be dry so what we'll do is we'll take the height of the pavers which is final grade and to the height of this stoop and we will divide that into three so we will go I believe it's 19 inches what we'll do is we'll go six and a half so we'll go six and a half to the first step then 13 inches to the next step and then 19 and a half to the final step and then we will kind of work with that final half inch extra that we have we'll maybe cut it in half to a quarter inch to a
2:21 quarter inch to the final one as well cut that in half make it as close to six and a half as possible so whatever the total amount of our rise is going to be and we split that difference and however we're going to plan that step in this case we ended up going six inches to that first step six inches to that next step and then six and a half to that final stoop Landing so that's 18 and a half inches so to set our screed bar we went from top of stoop to Tapas greed bar that 18 and a half inches plus however much our buried course is going to be which was an additional four and a half inches and that means that's negative 23 inches if we zero at the top of stoop down to top a screed bar or we can just measure down and then we're
3:06 gonna level these screed bars out because we want our steps to be completely level possibly with a very slight slope forward to allow any water to drain off and then what we're doing here is we're going ahead with our buried course this is our first level and this is the hardest part with any wall any step is just getting these completely level once they're level and you can see that we are using a dead blow hammer with a torpedo level to make sure that the level front to back left to right as well as from one piece to another and then using a tape measure to make sure that we're completely square with the foundation if this was a longer run or a retaining wall we would be using a string line just to make sure that we're completely square or parallel but in this case I'm just using a tape measure to measure off the foundation to
3:51 make sure that the measurement from one side of the step to the other is completely the same so as you can see that's the outline of our step as well as our second step there so that we know we can just start stacking these to create that final step so for that initial step it's just going to be one course of these six inch blocks these are going to be partially buried and then a two inch cap is going to go on top to give us either six inch step and then our final Second Step there is just being built up we have a couple cuts to do here as well as some rock facing to those Ed pieces so that's why they're actually overhanging just a little bit there so that we can chisel them make sure that they got that rock face all right here we are with our pyramid steps right now now it's time for the Caps so essentially what we've done is we've cut
4:36 in our returns we had one cut on that end one cut on the same side on that end for this one just fitting it in as good as possible to get that return so that the Caps can sit nicely no rocking as well as to fill in the sides as well we've got the sides rock face so one two three four Corner units that have been chiseled rock face now so that you do get that side there as opposed to getting a smooth side so that's how it should look when it comes off and now it's just time to get our caps installed so we've got
5:23 six foot caps 16 inch Treads so that is pretty much the size of that top cap we'll have one cut and then we will have a return coming this way and then a return over there coming that way and then we'll fill in this spot with the same cut piece of a six foot cap for there I believe that's five foot like eight inches up there so that's the game plan see how it goes Here's the final product so what we did was uh initially I was going to make these steps straight but what that would do is coming up this driveway here the entrance would be over here so you would actually have to come up and then come this way and then enter but keeping this curve here opens it up
6:08 that you're coming up the driveway and you can step up right onto this I try to cut it to the stones and with this this is 16 inches minus we actually cut a curve to match this wall in this step so it's a nice curved all the way we cut along here and we cut along here and then chiseled that to get that rock face so that it's a nice rock face all along same thing to this one lift it and relayed this this was built completely on stone dust and we all know if you follow my channel I hate stone dust it just acts as a sponge and soaks everything up and will lead to failure will lead to the degradation of the
6:54 underneath of your stone with that moisture just sitting there as well as efflorescence and a whole bunch of other issues so uh stone dust we just scraped out the top layer client knows that this is a temporary fix minus the steps we did build those on a gravel so a three inch lifts compaction and then we do have more than a buried course under each step the steps are actually built together we rock face the sides of those we rock face or chiseled the Caps here as well and on the edges so what we ended up doing was six foot across 16 inch Treads we love nice big treads for our clients to be able to step on and have tons of room we ended up going about six and a half and a half or about
7:40 six six and then six and a half up uh going six six just helps us to tie our steps together when we're building them without having to build this one up and then have to backfill with gravel to raise that next one essentially they're just built as a single unit step together adds a little bit of strength but also makes it a little bit easier as well we ended up going 12 inch treads on the side here just so we could open this area up as much as possible client says these railings are eventually going to go so as much as we can expand that area outwards and then they can put a planter on either side here so nobody steps down onto those but essentially this is our fixed area got to clean things up a bit
8:26 but that's about it I hope this video's helped you in some way if you do have a question at all leave it in the comment section below or respond to anybody and everybody like this video if you found it helpful for whatever reason then subscribe to this YouTube channel for More arts game content like this thank you so much for watching
Automatically transcribed from the source video.