This project outlines the steps to level a sinking paver step by addressing the underlying soil and re-setting the pavers. It involves excavating around the step, stabilizing the base material, and re-leveling the pavers.
Assembled from 12 on-camera clips by 9 independent creators demonstrating these exact steps.
Tools & Materials
Steps
Excavate Around the Paver Step
Use a shovel to carefully dig around the perimeter of the paver step. The goal is to expose the base material (gravel or sand) that the pavers are set on. Continue excavating until you reach stable soil or a depth that addresses the cause of the sinking. If the sinking is due to frost heave, you may need to excavate below the local frost line. Remove any loose soil or debris as you excavate.
Stabilize the Base Material
If the excavated area is unstable or has washed out, you will need to add new base material. Begin by adding a layer of crushed gravel (e.g., ¾-inch minus). Spread the gravel evenly and compact it thoroughly using a hand tamper or a plate compactor. Add subsequent layers of gravel, compacting each layer, until you reach the desired height. If the original base was sand, you may opt to use a paver base sand or a blend of sand and gravel for better drainage and stability. Ensure the new base material is compacted to create a firm surface that will not shift.
Re-level and Set Pavers
Once the base material is compacted and level, carefully place the paver step units back into position. Use a rubber mallet to gently tap the pavers into place, ensuring they are flush with each other and the surrounding pavers. Use your level frequently to check that each paver, and the step as a whole, is level. Adjust the base material underneath as needed by adding or removing small amounts to achieve the correct height and slope. Ensure the edges of the step are properly aligned and that there are no significant gaps between pavers.
Backfill and Compact Edges
Once the pavers are set and leveled, backfill the excavated areas around the step. If you used gravel as the base, you can use more gravel for backfilling or a suitable soil mix. For areas that will not be paved over, use soil. Compact the backfill material in layers to prevent settling. Ensure the backfilled material slopes away from the step to promote drainage. Sweep the paver surface clean of any debris.
Frequently Asked Questions
Is a plate compactor absolutely necessary for leveling a sinking paver step, or can I do it manually?
A plate compactor is highly recommended for creating a dense, stable base that prevents future sinking. While you can attempt to compact manually with a hand tamper, it's difficult to achieve the same level of compaction, especially with larger areas of base material. Renting a compactor for a day can save you from having to re-do the work later due to improper base preparation.
What's the best way to ensure the paver base is stable enough so the step doesn't sink again?
Proper compaction is key to preventing future sinking. After excavating, lay down a layer of 3/4 inch gravel and compact it thoroughly with a plate compactor until firm. Then, add your paver base material in thinner layers (2-3 inches at a time), compacting each layer until it's very dense. This multi-layer approach with good compaction creates a solid foundation.
Why is the estimated time for this beginner project two days?
The two-day estimate accounts for several factors beyond just physical labor. It allows time for proper excavation, thorough compaction of multiple base layers, and careful leveling, which can be time-consuming for beginners. It also factors in potential rental equipment pick-up/return, and allows for the base to settle overnight before final adjustments, ensuring a more stable result.
What's the most common mistake beginners make when re-leveling pavers, and how can I avoid it?
The most common mistake is not adequately compacting the base layers beneath the pavers. If the underlying gravel and paver base aren't dense and stable, the pavers will likely sink again in the same spot. Avoid this by using a plate compactor on each layer of base material until it feels solid underfoot, and ensure proper drainage away from the step.
What safety precautions should I take when excavating and compacting for this project?
Always wear sturdy work gloves to protect your hands from blisters, sharp objects, and rough materials. Safety glasses are essential to shield your eyes from flying debris during digging and compaction. When operating a plate compactor, ear protection is also recommended due to noise, and wear steel-toed boots for foot protection against falling pavers or tools.
Can I use just sand as a base instead of gravel and paver base for my paver step?
While sand is used as a thin bedding layer directly under pavers, it should not be used as the sole base material. Sand alone does not provide sufficient drainage or long-term stability for a paver step and can wash away or shift over time. A proper base requires a compacted layer of crushed gravel followed by a layer of paver base for optimal performance and durability.
Questions about your project or which product fits? Oak Valley Designs's team is happy to help. Mon–Fri 9–5 ET
Related Guides
See All
how to give your staircase a makeover with carpet stair treads

how to install carpet stair treads to make hardwood stairs safe for dogs

how to measure stairs to choose the right size carpet stair treads