Prepare the Stable Base
From How to Level a Sinking Paver Step · Step 2 of 4 · Video by I Am a Hardscaper

Showing 1:15–1:48 of the source video. Watch the full video with every moment.
What happens in this clip
Once the area is cleared, compact the exposed subsoil thoroughly to create a stable foundation. Install a non-woven geotextile fabric over the compacted subsoil. This fabric acts as a separator, preventing the base material from mixing with the subsoil. Next, add a layer of A gravel in 3 to 4-inch lifts, compacting each lift with a plate compactor (e.g., Bartell BR1570). Ensure the A gravel is slightly moist (not too wet, not too dry) during compaction to achieve optimal density. Aim for a total compacted base thickness of 7 to 8 inches.
Goal: Create a properly compacted, durable base for the new steps and landing.
What's used
Tools
- Non-woven Geotextile Fabric
- Plate Compactor Bartell
- Tape Measure
Materials
- A Gravel
- Water
About the full video
This project details the complete renovation of a dilapidated front entrance hardscape, including replacing unsafe steps and relaying a circular landing. The process involves proper base preparation, precise leveling of step blocks, custom cutting and rock-facing of stone caps, and using durable materials like A gravel and interlocking blocks for longevity and safety.
What's said in this clip
it we don't use it took it out compacted the subsoil installed a non-woven geotextile and then compacted a gravel three inch lifts three to four inch to get about seven to eight inches of base now you notice we are using our BR 1570 this is good for about three and a half inches of material so that's why we compact this in lifts of three to four inches no more and we want to make sure that our a gravel is nice and moist we've got water added to it not too much but not too little it can't be dry so
Automatically transcribed from the source video.
Step 2 of 4: Stabilize the Base Material
If the excavated area is unstable or has washed out, you will need to add new base material. Begin by adding a layer of crushed gravel (e.g., ¾-inch minus). Spread the gravel evenly and compact it thoroughly using a hand tamper or a plate compactor. Add subsequent layers of gravel, compacting each layer, until you reach the desired height. If the original base was sand, you may opt to use a paver base sand or a blend of sand and gravel for better drainage and stability. Ensure the new base material is compacted to create a firm surface that will not shift.
Every video in How to Level a Sinking Paver Step
Step 1: Excavate Around the Paver Step
- 1:47–2:21 Remove Affected Pavers and Surrounding Rows
- 0:00–0:11 Remove Pavers and Excavate Base
- 0:01–0:09 Remove Pavers and Bedding
Step 2: Stabilize the Base Material
- 2:10–2:50 Replace the base
- 1:15–1:48 Prepare the Stable Base (this video)
- 2:40–3:09 Place and Compact Your Base Material
Step 3: Re-level and Set Pavers
- 1:20–2:59 Re-lay and Level Pavers
- 1:24–6:48 Reinstall Pavers and Check Level
- 1:38–3:00 Reinstall and Align Pavers
Step 4: Backfill and Compact Edges
- 6:08–6:44 Backfill Around Pavers
- 4:05–4:23 Install Edging and Backfill
- 7:15–8:42 Final Touches and Fill Material Selection
Questions about How to Level a Sinking Paver Step
Is a plate compactor absolutely necessary for leveling a sinking paver step, or can I do it manually?
A plate compactor is highly recommended for creating a dense, stable base that prevents future sinking. While you can attempt to compact manually with a hand tamper, it's difficult to achieve the same level of compaction, especially with larger areas of base material. Renting a compactor for a day can save you from having to re-do the work later due to improper base preparation.
What's the best way to ensure the paver base is stable enough so the step doesn't sink again?
Proper compaction is key to preventing future sinking. After excavating, lay down a layer of 3/4 inch gravel and compact it thoroughly with a plate compactor until firm. Then, add your paver base material in thinner layers (2-3 inches at a time), compacting each layer until it's very dense. This multi-layer approach with good compaction creates a solid foundation.
Why is the estimated time for this beginner project two days?
The two-day estimate accounts for several factors beyond just physical labor. It allows time for proper excavation, thorough compaction of multiple base layers, and careful leveling, which can be time-consuming for beginners. It also factors in potential rental equipment pick-up/return, and allows for the base to settle overnight before final adjustments, ensuring a more stable result.
What's the most common mistake beginners make when re-leveling pavers, and how can I avoid it?
The most common mistake is not adequately compacting the base layers beneath the pavers. If the underlying gravel and paver base aren't dense and stable, the pavers will likely sink again in the same spot. Avoid this by using a plate compactor on each layer of base material until it feels solid underfoot, and ensure proper drainage away from the step.
What safety precautions should I take when excavating and compacting for this project?
Always wear sturdy work gloves to protect your hands from blisters, sharp objects, and rough materials. Safety glasses are essential to shield your eyes from flying debris during digging and compaction. When operating a plate compactor, ear protection is also recommended due to noise, and wear steel-toed boots for foot protection against falling pavers or tools.
Can I use just sand as a base instead of gravel and paver base for my paver step?
While sand is used as a thin bedding layer directly under pavers, it should not be used as the sole base material. Sand alone does not provide sufficient drainage or long-term stability for a paver step and can wash away or shift over time. A proper base requires a compacted layer of crushed gravel followed by a layer of paver base for optimal performance and durability.
How to Level a Sinking Paver Step
This project outlines the steps to level a sinking paver step by addressing the underlying soil and re-setting the pavers. It involves excavating around the step, stabilizing the base material, and re-leveling the pavers.
Read the full guide Browse all guides