Prepare the Stable Base
From How to Add a Step at a Too-High Back Door · Step 3 of 10 · Video by I Am a Hardscaper

Showing 1:15–1:48 of the source video. Watch the full video with every moment.
What happens in this clip
Once the area is cleared, compact the exposed subsoil thoroughly to create a stable foundation. Install a non-woven geotextile fabric over the compacted subsoil. This fabric acts as a separator, preventing the base material from mixing with the subsoil. Next, add a layer of A gravel in 3 to 4-inch lifts, compacting each lift with a plate compactor (e.g., Bartell BR1570). Ensure the A gravel is slightly moist (not too wet, not too dry) during compaction to achieve optimal density. Aim for a total compacted base thickness of 7 to 8 inches.
Goal: Create a properly compacted, durable base for the new steps and landing.
What's used
Tools
- Non-woven Geotextile Fabric
- Plate Compactor Bartell
- Tape Measure
Materials
- A Gravel
- Water
About the full video
This project details the complete renovation of a dilapidated front entrance hardscape, including replacing unsafe steps and relaying a circular landing. The process involves proper base preparation, precise leveling of step blocks, custom cutting and rock-facing of stone caps, and using durable materials like A gravel and interlocking blocks for longevity and safety.
What's said in this clip
it we don't use it took it out compacted the subsoil installed a non-woven geotextile and then compacted a gravel three inch lifts three to four inch to get about seven to eight inches of base now you notice we are using our BR 1570 this is good for about three and a half inches of material so that's why we compact this in lifts of three to four inches no more and we want to make sure that our a gravel is nice and moist we've got water added to it not too much but not too little it can't be dry so
Automatically transcribed from the source video.
Step 3 of 10: Install Gravel Base and Compact
Add a layer of crushed gravel (typically 3/4-inch minus) to the bottom of the excavation, to a depth of 4-6 inches. Spread the gravel evenly. Compact the gravel using a hand tamper or a plate compactor until it is firm and stable. This layer provides drainage and a solid base to prevent settling.
Every video in How to Add a Step at a Too-High Back Door
Step 1: Determine Step Location and Dimensions
- 1:22–1:52 Determine Step Dimensions
- 4:31–5:26 Calculate Step Dimensions
- 0:02–0:06 Site Preparation and Measurement
Step 2: Excavate for Step Foundation
- 3:05–4:04 Excavating for the First Step
- 2:40–3:36 Dig Trench for First Step
- 0:09–0:12 Excavate and Prepare the Sub-Base
Step 3: Install Gravel Base and Compact
- 0:09–0:18 Install and Compact Gravel Base
- 1:15–1:48 Prepare the Stable Base (this video)
- 1:08–1:36 Install and Compact Gravel Sub-Base
Step 4: Construct Step Formwork (if using concrete)
- 3:55–4:31 Construct Stair Forms
- 0:56–1:21 Install Formwork for First Step
- 0:10–0:18 Install Wooden Formwork for Steps
Step 5: Pour and Finish Concrete Step
- 0:18–0:24 Pour and Finish Concrete
- 0:18–0:23 Pour and Finish the Concrete
- 0:30–0:42 Pour and Level Concrete
Step 6: Build Wooden Step Frame
- 4:05–4:26 Construct the 2x6 Support Frame
- 2:24–3:20 Construct the Lumber Frame
- 5:06–6:54 Construct Inner Step Frame
Step 7: Install Step Frame and Ensure Stability
- 0:00–0:13 Position and Level the Wooden Step
- 0:14–0:17 Secure the Wooden Step
- 0:03–0:06 Construct and Place First Step Frame
Step 8: Attach Step Treads and Risers
- 2:59–3:14 Installing Step Treads and Risers
- 7:14–8:15 Install Risers and Treads
- 5:38–6:22 Install Risers and Remaining Treads
Step 9: Install Railings (if required or desired)
- 4:56–5:38 Attach Handrail
- 3:40–4:56 Install Handrail Post
- 32:25–51:33 Installing Post and Handrails
Step 10: Backfill and Landscape Around Step
- 20:20–22:50 Backfill and Level the Ground
- 21:59–23:25 Backfill and Place Decorative Rocks
- 0:30–0:47 Finish with Gravel Infill
Questions about How to Add a Step at a Too-High Back Door
What are the most crucial safety precautions I should take when building an exterior step?
Always call 811 before digging to avoid underground utilities. When working with concrete, wear gloves and eye protection to prevent skin irritation and splashes. Ensure your work area is stable and clear of obstacles to prevent falls, especially during excavation and concrete pouring.
What are the main differences between building a concrete step versus a wooden step, and which is better?
Concrete steps offer superior durability, weather resistance, and require less maintenance over time, making them ideal for a permanent solution. Wooden steps can be quicker to build and more aesthetically versatile, but they require more frequent maintenance (sealing, staining) and are more susceptible to rot and insect damage. The 'better' choice depends on your budget, desired longevity, and maintenance commitment.
Is the '2 days' estimated time realistic for a beginner, or should I plan for more time?
The '2 days' estimate is achievable for someone with basic DIY experience and good planning. However, as a beginner, it's wise to allocate additional time, especially for thorough foundation preparation, ensuring precise measurements, and allowing for concrete curing if you choose that material. Weather can also impact the project timeline significantly.
What are common mistakes beginners make when building an outdoor step, and how can I avoid them?
A common mistake is inadequate foundation preparation; ensure the gravel base is thoroughly compacted to prevent future settling and cracking. Another is incorrect step dimensions (rise and run), which can make the step uncomfortable or unsafe; always double-check against local codes. Also, not allowing proper drainage around the step can lead to water damage over time.
Do I need to check with my local municipality or HOA before starting this step project?
Yes, it is highly recommended to check with your local building department and homeowner's association (HOA) before you begin. They can provide essential information on required permits, specific building codes for step dimensions, railing requirements, and setback rules. This ensures your project is compliant and avoids potential issues.
Are there any tools listed that I might be able to substitute or rent instead of buying new?
Many common tools like a measuring tape, level, and shovel you might already own. Specialized tools such as a concrete float, mattock, or even specific power tools for cutting lumber could potentially be rented from a local hardware store or borrowed from a friend. Always prioritize using the correct tool for safety and efficiency, whether owned or rented.
How to Add a Step at a Too-High Back Door
This project outlines the process of adding an exterior step to a back door that is too high off the ground, improving accessibility and safety.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.

