powered by

Prepare the Stable Base

From How to Add a Step at a Too-High Back Door · Step 3 of 10 · Video by I Am a Hardscaper

Showing 1:15–1:48 of the source video. Watch the full video with every moment.

What happens in this clip

Once the area is cleared, compact the exposed subsoil thoroughly to create a stable foundation. Install a non-woven geotextile fabric over the compacted subsoil. This fabric acts as a separator, preventing the base material from mixing with the subsoil. Next, add a layer of A gravel in 3 to 4-inch lifts, compacting each lift with a plate compactor (e.g., Bartell BR1570). Ensure the A gravel is slightly moist (not too wet, not too dry) during compaction to achieve optimal density. Aim for a total compacted base thickness of 7 to 8 inches.

Goal: Create a properly compacted, durable base for the new steps and landing.

What's used

Tools

  • Non-woven Geotextile Fabric
  • Plate Compactor Bartell
  • Tape Measure

Materials

  • A Gravel
  • Water

About the full video

This project details the complete renovation of a dilapidated front entrance hardscape, including replacing unsafe steps and relaying a circular landing. The process involves proper base preparation, precise leveling of step blocks, custom cutting and rock-facing of stone caps, and using durable materials like A gravel and interlocking blocks for longevity and safety.

What's said in this clip

it we don't use it took it out compacted the subsoil installed a non-woven geotextile and then compacted a gravel three inch lifts three to four inch to get about seven to eight inches of base now you notice we are using our BR 1570 this is good for about three and a half inches of material so that's why we compact this in lifts of three to four inches no more and we want to make sure that our a gravel is nice and moist we've got water added to it not too much but not too little it can't be dry so

Automatically transcribed from the source video.

Step 3 of 10: Install Gravel Base and Compact

Add a layer of crushed gravel (typically 3/4-inch minus) to the bottom of the excavation, to a depth of 4-6 inches. Spread the gravel evenly. Compact the gravel using a hand tamper or a plate compactor until it is firm and stable. This layer provides drainage and a solid base to prevent settling.

Open this step in the guide

Every video in How to Add a Step at a Too-High Back Door

  1. Step 1: Determine Step Location and Dimensions

  2. Step 2: Excavate for Step Foundation

  3. Step 3: Install Gravel Base and Compact

  4. Step 4: Construct Step Formwork (if using concrete)

  5. Step 5: Pour and Finish Concrete Step

  6. Step 6: Build Wooden Step Frame

  7. Step 7: Install Step Frame and Ensure Stability

  8. Step 8: Attach Step Treads and Risers

  9. Step 9: Install Railings (if required or desired)

  10. Step 10: Backfill and Landscape Around Step

Questions about How to Add a Step at a Too-High Back Door

What are the most crucial safety precautions I should take when building an exterior step?

Always call 811 before digging to avoid underground utilities. When working with concrete, wear gloves and eye protection to prevent skin irritation and splashes. Ensure your work area is stable and clear of obstacles to prevent falls, especially during excavation and concrete pouring.

What are the main differences between building a concrete step versus a wooden step, and which is better?

Concrete steps offer superior durability, weather resistance, and require less maintenance over time, making them ideal for a permanent solution. Wooden steps can be quicker to build and more aesthetically versatile, but they require more frequent maintenance (sealing, staining) and are more susceptible to rot and insect damage. The 'better' choice depends on your budget, desired longevity, and maintenance commitment.

Is the '2 days' estimated time realistic for a beginner, or should I plan for more time?

The '2 days' estimate is achievable for someone with basic DIY experience and good planning. However, as a beginner, it's wise to allocate additional time, especially for thorough foundation preparation, ensuring precise measurements, and allowing for concrete curing if you choose that material. Weather can also impact the project timeline significantly.

What are common mistakes beginners make when building an outdoor step, and how can I avoid them?

A common mistake is inadequate foundation preparation; ensure the gravel base is thoroughly compacted to prevent future settling and cracking. Another is incorrect step dimensions (rise and run), which can make the step uncomfortable or unsafe; always double-check against local codes. Also, not allowing proper drainage around the step can lead to water damage over time.

Do I need to check with my local municipality or HOA before starting this step project?

Yes, it is highly recommended to check with your local building department and homeowner's association (HOA) before you begin. They can provide essential information on required permits, specific building codes for step dimensions, railing requirements, and setback rules. This ensures your project is compliant and avoids potential issues.

Are there any tools listed that I might be able to substitute or rent instead of buying new?

Many common tools like a measuring tape, level, and shovel you might already own. Specialized tools such as a concrete float, mattock, or even specific power tools for cutting lumber could potentially be rented from a local hardware store or borrowed from a friend. Always prioritize using the correct tool for safety and efficiency, whether owned or rented.

How to Add a Step at a Too-High Back Door

This project outlines the process of adding an exterior step to a back door that is too high off the ground, improving accessibility and safety.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Prepare the Stable Base — How to Add a Step at a Too-High Back Door | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.