powered by

Remove Pavers and Bedding

From How to Level a Sinking Paver Step · Step 1 of 4 · Video by Western Interlock

Showing 0:01–0:09 of the source video. Watch the full video with every moment.

What happens in this clip

Begin by identifying the problem area, specifically the low spot in the paving stones. Use a spirit level to confirm the extent of the dip. Carefully remove the paving stones from the affected area, extending the removal approximately 12 inches past the edge of the visible low spot. Stack the removed paving stones neatly nearby for later reuse. Once the pavers are removed, use a hand trowel or spade to scrape up and remove the existing bedding layer (usually sand or crushed stone) to expose the sub-base beneath.

Goal: Expose the sub-base beneath the low spot.

What's used

Tools

  • Hand Trowel
  • Spirit Level

Materials

  • Paving Stones

About the full video

This DIY project details how to repair a sunken area or 'low spot' in a paving stone system. The process involves carefully removing existing pavers, excavating the old bedding layer, reinforcing the sub-base with compacted gravel, preparing a new, level bedding layer of concrete sand, reinstalling the pavers, and finally filling the joints with sand and compacting the entire area to create a stable and functional surface.

What's said in this clip

repair a low spot in your paving stones so we're going to start pulling up our paving stones and we just want to make sure that we pull up about 12 in past the edge of our problem area move on to scraping up our bedding layer now we're just going to have to add gravel and compact it back to grade now we're ready to tr in some new fresh concrete sand lay our papers again sweep in some joint stand and hand

Automatically transcribed from the source video.

Step 1 of 4: Excavate Around the Paver Step

Use a shovel to carefully dig around the perimeter of the paver step. The goal is to expose the base material (gravel or sand) that the pavers are set on. Continue excavating until you reach stable soil or a depth that addresses the cause of the sinking. If the sinking is due to frost heave, you may need to excavate below the local frost line. Remove any loose soil or debris as you excavate.

Open this step in the guide

Every video in How to Level a Sinking Paver Step

  1. Step 1: Excavate Around the Paver Step

  2. Step 2: Stabilize the Base Material

  3. Step 3: Re-level and Set Pavers

  4. Step 4: Backfill and Compact Edges

Questions about How to Level a Sinking Paver Step

Is a plate compactor absolutely necessary for leveling a sinking paver step, or can I do it manually?

A plate compactor is highly recommended for creating a dense, stable base that prevents future sinking. While you can attempt to compact manually with a hand tamper, it's difficult to achieve the same level of compaction, especially with larger areas of base material. Renting a compactor for a day can save you from having to re-do the work later due to improper base preparation.

What's the best way to ensure the paver base is stable enough so the step doesn't sink again?

Proper compaction is key to preventing future sinking. After excavating, lay down a layer of 3/4 inch gravel and compact it thoroughly with a plate compactor until firm. Then, add your paver base material in thinner layers (2-3 inches at a time), compacting each layer until it's very dense. This multi-layer approach with good compaction creates a solid foundation.

Why is the estimated time for this beginner project two days?

The two-day estimate accounts for several factors beyond just physical labor. It allows time for proper excavation, thorough compaction of multiple base layers, and careful leveling, which can be time-consuming for beginners. It also factors in potential rental equipment pick-up/return, and allows for the base to settle overnight before final adjustments, ensuring a more stable result.

What's the most common mistake beginners make when re-leveling pavers, and how can I avoid it?

The most common mistake is not adequately compacting the base layers beneath the pavers. If the underlying gravel and paver base aren't dense and stable, the pavers will likely sink again in the same spot. Avoid this by using a plate compactor on each layer of base material until it feels solid underfoot, and ensure proper drainage away from the step.

What safety precautions should I take when excavating and compacting for this project?

Always wear sturdy work gloves to protect your hands from blisters, sharp objects, and rough materials. Safety glasses are essential to shield your eyes from flying debris during digging and compaction. When operating a plate compactor, ear protection is also recommended due to noise, and wear steel-toed boots for foot protection against falling pavers or tools.

Can I use just sand as a base instead of gravel and paver base for my paver step?

While sand is used as a thin bedding layer directly under pavers, it should not be used as the sole base material. Sand alone does not provide sufficient drainage or long-term stability for a paver step and can wash away or shift over time. A proper base requires a compacted layer of crushed gravel followed by a layer of paver base for optimal performance and durability.

How to Level a Sinking Paver Step

This project outlines the steps to level a sinking paver step by addressing the underlying soil and re-setting the pavers. It involves excavating around the step, stabilizing the base material, and re-leveling the pavers.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Remove Pavers and Bedding — How to Level a Sinking Paver Step | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.