What happens in this clip
Begin re-laying the pavers on top of the permeable fabric and a fresh layer of leveling sand. As you lay the pavers, adjust the sand beneath them as needed to achieve the desired height and level. The narrator points out that the pavers should be set approximately 1/4 inch high before compaction, as they will settle flush once tamped down. For areas that are too low, add more sand. Use a wood block and a hammer to gently tap pavers into place and achieve a level surface without damaging the pavers directly. This iterative process of laying, checking level, adjusting sand, and tapping is key to a stable and even patio.
Goal: Re-install pavers, ensuring a consistent and level surface by adjusting the underlying sand.
What's used
Tools
- Gloves
- Hammer / Mallet
- Leveling Trowel / Screed Board
- Wood Block
Materials
- Leveling Sand
About the full video
This video provides a comprehensive guide on how to repair and stabilize a settled paver patio by addressing sub-base issues and utilizing proper compaction techniques. The process involves carefully removing existing pavers, preparing the sub-base with permeable fabric and leveling sand, re-laying pavers, applying polymeric sand, and finally compacting and activating the sand to ensure long-term stability and prevent future settling.
What's said in this clip
initial settlement in the first place. All right, we're resetting the pavers and I want to look at one side from the other. This side is just about a/4 inch high right here because when we go to tamp it down, it's going to tamp flush. This side is actually just a little bit too low at this point. So when we go to tamp this down, if we have these blocks perfectly flush, they're going to be below the level we want to be at. So Thomas is pulling these out and adding just a little bit of sand to raise them up. So when we tamp this down, we're exactly where we want to be at. [music] Never pound directly on your pavers with a steel mallet or hammer. It will crack and bust them. Just use a wood block as a cushion in between. Now, I started experimenting with Sakrete's pave set and found out that I absolutely love this material, but it is not a one and you're done. meaning you can't put this in and leave it for years and years without maintenance. I just called Lowe's and asked them if they have paver set because that's the material I want to use to rebuild this patio with. They told me they didn't have it on hand, but I got a weird feeling from talking to them that they just didn't know exactly what I was looking for. So, I decided to drive down and search for it on my own. I like it because with this stuff, it'll last much longer than any other material, but you will have to refresh this every 2 to 3 years. But still, the benefits of using this material over standard sand has changed my opinion on using a poly sand material here.
Automatically transcribed from the source video.
Step 3 of 4: Re-level and Set Pavers
Once the base material is compacted and level, carefully place the paver step units back into position. Use a rubber mallet to gently tap the pavers into place, ensuring they are flush with each other and the surrounding pavers. Use your level frequently to check that each paver, and the step as a whole, is level. Adjust the base material underneath as needed by adding or removing small amounts to achieve the correct height and slope. Ensure the edges of the step are properly aligned and that there are no significant gaps between pavers.
Every video in How to Level a Sinking Paver Step
Step 1: Excavate Around the Paver Step
- 1:47–2:21 Remove Affected Pavers and Surrounding Rows
- 0:00–0:11 Remove Pavers and Excavate Base
- 0:01–0:09 Remove Pavers and Bedding
Step 2: Stabilize the Base Material
- 2:10–2:50 Replace the base
- 1:15–1:48 Prepare the Stable Base
- 2:40–3:09 Place and Compact Your Base Material
Step 3: Re-level and Set Pavers
- 1:20–2:59 Re-lay and Level Pavers (this video)
- 1:24–6:48 Reinstall Pavers and Check Level
- 1:38–3:00 Reinstall and Align Pavers
Step 4: Backfill and Compact Edges
- 6:08–6:44 Backfill Around Pavers
- 4:05–4:23 Install Edging and Backfill
- 7:15–8:42 Final Touches and Fill Material Selection
Questions about How to Level a Sinking Paver Step
Is a plate compactor absolutely necessary for leveling a sinking paver step, or can I do it manually?
A plate compactor is highly recommended for creating a dense, stable base that prevents future sinking. While you can attempt to compact manually with a hand tamper, it's difficult to achieve the same level of compaction, especially with larger areas of base material. Renting a compactor for a day can save you from having to re-do the work later due to improper base preparation.
What's the best way to ensure the paver base is stable enough so the step doesn't sink again?
Proper compaction is key to preventing future sinking. After excavating, lay down a layer of 3/4 inch gravel and compact it thoroughly with a plate compactor until firm. Then, add your paver base material in thinner layers (2-3 inches at a time), compacting each layer until it's very dense. This multi-layer approach with good compaction creates a solid foundation.
Why is the estimated time for this beginner project two days?
The two-day estimate accounts for several factors beyond just physical labor. It allows time for proper excavation, thorough compaction of multiple base layers, and careful leveling, which can be time-consuming for beginners. It also factors in potential rental equipment pick-up/return, and allows for the base to settle overnight before final adjustments, ensuring a more stable result.
What's the most common mistake beginners make when re-leveling pavers, and how can I avoid it?
The most common mistake is not adequately compacting the base layers beneath the pavers. If the underlying gravel and paver base aren't dense and stable, the pavers will likely sink again in the same spot. Avoid this by using a plate compactor on each layer of base material until it feels solid underfoot, and ensure proper drainage away from the step.
What safety precautions should I take when excavating and compacting for this project?
Always wear sturdy work gloves to protect your hands from blisters, sharp objects, and rough materials. Safety glasses are essential to shield your eyes from flying debris during digging and compaction. When operating a plate compactor, ear protection is also recommended due to noise, and wear steel-toed boots for foot protection against falling pavers or tools.
Can I use just sand as a base instead of gravel and paver base for my paver step?
While sand is used as a thin bedding layer directly under pavers, it should not be used as the sole base material. Sand alone does not provide sufficient drainage or long-term stability for a paver step and can wash away or shift over time. A proper base requires a compacted layer of crushed gravel followed by a layer of paver base for optimal performance and durability.
How to Level a Sinking Paver Step
This project outlines the steps to level a sinking paver step by addressing the underlying soil and re-setting the pavers. It involves excavating around the step, stabilizing the base material, and re-leveling the pavers.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.