- 3:31–4:34 Measure and Calculate Riser Height
From How to Set Up Stairs for a Dog with Arthritis or After Surgery, Step 1: Choose the Right Ramp/Stair Design
Using a measuring tape and a level, determine the total vertical height from the top of the new deck platform down to the driveway or ground level where the new step will land. For example, if the measurement is 325mm, divide this by the number of desired risers (e.g., 2) to get the individual riser height (e.g., 162.5mm). This calculation is crucial for ensuring the new step is safe and comfortable to use. Adhere to local building codes for maximum and minimum riser heights.
- 12:28–13:51 Clean Up and Final Inspection
From How to Build Deck Stairs with Pre-Cut Stringers, Step 6: Inspect and Finish
Use a leaf blower or broom to clear any sawdust, debris, or scattered materials from the work area, leaving it tidy. Conduct a thorough visual inspection of the new step, checking for any exposed fasteners, uneven edges, or missed details. Test the stability and feel of the step by walking up and down it, ensuring there is no movement or spring. Confirm that the new step seamlessly integrates with the existing deck and complements the house exterior.
Guides that use this video
Transcript
0:08 scott brown here in today's exciting episode we turn this stair here into to this welcome to another exciting episode [Music]
1:05 all right the aim of the game here today to get rid of the stair that i'm sitting on and this hand rail the only um the only reason the sand rail is here is because it was an ex-state house and it was a requirement for state houses because some people with disabilities may be living in a state house that isn't a requirement for the existing owners and um you might have noticed here that we've got this graphic decking up here now i'll talk about that in a sec but it doesn't match this just painted pine stringer so that's got to go as well so we've got to find a way to re-support all of that and still have a stair now the grappa decking yes um let's have a look at the back door to see what was there before [Music]
1:54 so this is pine decking 90 by i don't know 32 maybe oh yeah 32 there you go anyway that stuff was painted at the front just like the stringer we pulled that off last week and we put the griper down and luckily the framing underneath the deck was good we could just put the grappler straight on we're gonna do the same here eventually as well but uh this just gives you an idea of what was around there and i am gonna replace i'm gonna replace that as well that's the aim for today replace this with a that looks a lot more like that [Applause]
2:51 oh rain rain it's a good thing we have this marquee otherwise totally rained off every day [Music] [Applause] keeps raining but we got the steer out we just got to figure out how to build the new one so basically
3:37 the easiest way to think about it is what is your height from the deck where your top platform is to the driveway here you divide it by how many rises there's gonna be one riser there one riser there and that means one big tread so basically i just need the measurement from the top of the deck to the driveway and then i divided by two two rises that's what you do that's all you do for a stair it's really simple there's your 325 from there to there and then each stair height will be 162.5 which is a nice air gap under there
4:34 all right i've just been thinking about the solution to this problem and as often with renovations you can't think about the solution until you've moved what was there before the house has been relocated so all these joists and posts are new so you've got a bearer there running that way and luckily you have a bearer there running that way as well so what i'm thinking is adding a six by two and then cantilever that out out here and as long as i've gone in at least twice as much as i'm coming out that will be strong i'll have a six by two out here and then we'll all rest on these little things here the cantilever will be strong enough but on its own but just as in addition i'll use that underneath
5:21 and that might do it let's see how we go right see yeah painting looks good yeah doing a great job
6:26 [Music] so i want to get this top of this frame uh 20 ml lower than the finished step height so it needs to be level and it needs to be 182.5 millimeters from there
8:23 you go so that's it all framed up and it's still just floating there off the cantilevered boards that i screwed in there so what's that like 80 kilos plus the tool belt so i still want to put little sticks there just to take that bounce out and now we attach with the bolt that should take any remaining spring out of the step i feel like there's a joke there somewhere
9:09 [Music] when they make um when they make cell phones the port where you charge your cell phone this one here like the you know like the usbc or whatever your phone is they basically have robots in the factory that plug and unplug into the into the port over and over again now that's basically to test whether your phone is going to put up with you know the amount of times you put a charger into it over its lifetime now why am i talking about cell phones well i'm trying to use this as an example to justify the amount of fixings that i put on this step
9:55 so so there you go there a lot of stainless steel fixings so let's calculate it 365 days in a year two people living in the house so they're likely to stand on that four times a day so in a year 1460 times this will be stood on in one year and that's why i over engineer it check out the decking we're using [Music] this is like a bitumen kind of damp proof course we call it chucking that on so when all these blocks come up to it and the sand and everything it's not rubbing against the timber all day every day the timber store has a chance to dry out on the other side because it's not embedded in dirt and better than gravel
10:46 [Music] so one thing i like to do with the miters is i like to put glue on them it's not just to hold them together you know that they could come apart over time it's outside after all but my main reason is to seal the edges seal that raw cut because if you don't a mitered edge like
11:33 this kind of acts like a wick when it comes to moisture [Music]
12:39 always remember no pencil marks to this welcome to another exciting episode so this wait to this welcome to another exciting episode i don't know if that worked but here we go the step so rather than the two small steps we have one big step pad is just working on the facing now we're going to bring the facing all the way down to here and that will break up the garapa boards and the um pine cladding [Music] and if you're wondering this is grappa and it's pre-stained and the only reason we have any is
13:26 because it's been under the house for years because about four years ago they built that deck so the stuff we're using is literally leftovers from that beautiful weather we use spax stainless screws if you're wondering as well i think they're t25 bits or t30 bits thanks for watching catch you in the next sunny episode [Music]
14:21 you