    Before assembling the railing section, measure the exact gap between the installed deck posts. Use a measuring tape and pencil to mark the precise length on both the top and bottom rails, then use a hand saw or circular saw to cut them to fit perfectly between the posts. Once cut, smooth any rough edges with sandpaper.

The guide that use this video

Transcript

0:09 how to assemble deck railings deck railings come in a variety of attractive Styles and help to add the finishing touches to a raised deck if your deck isn't at ground level then you should always add railings to make sure that your deck is a safe place for you to relax all year round you'll find the full list of tools and materials you'll need at the end of this video we're going to be adding modern decking railings to our raised deck bear in mind that the maximum deck height for this type of railing is 600 mm so if your deck is any higher you'll require a different railing design let's start with the deck posts which are the supporting pillars of the handrails you can cut deck posts to

0:55 whatever size you like as long as the handrails can attach to them at at least 900 mm from the deck to make this part of the project much easier you can buy your posts pre-notched if you need to extend your Notch further then you can do this using a hand saw or circular saw don't forget to treat all cut surfaces and holes with a preserver generally two coats are recommended next drill pilot holes before fixing the deck posts to the bearer using two 130 mm exterior coach bolts per post then TI tighten with a socket set make sure they are evenly spaced with a maximum spacing of 1,800 mm between them if like us you need to notch a post into the decking to keep it

1:41 flush start by measuring and marking both the top of the deck and the fascia where the post will be remove the fascia and using a hand saww saw off the section you've marked out next use a jigsaw to remove the top [Music] section put the post into position and check that it's flush to the decking then secure the post as before and reattach the fascia before you assemble the railing measure the gap between the posts so you can cut the top and bottom rails to fit between [Music]

2:31 them next measure 8 1 mm from the end of the top Rail and Mark a line this line will be where you place your first spindle a good tip for making sure spindles are evenly spaced is to measure and cut a piece of spindle to 81 mm and use this as a marker mark the center mark on each spindle as this is where you'll drill your pilot holes then turn the 81 mm section on its side and continue to Mark along the length of the railing if like us you have cut your handrail down then you may need to adjust these measurements slightly however make sure all spacings are equal and do not exceed 82 mm before fixing for the bottom rail you'll need to repeat the above with the addition of drilling a 3 mm pilot hole through each

3:19 Mark now we need to attach the spindles to the bottom rail using 76 mm deck screws to attach the top rail to the spindle use a 64 mm a galvanized finished nail but take care not to damage the wood whilst hammering alternatively you could use a nail punch to finish the nails now your railing is complete place the long side of the L brackets centrally into the fillet slot underside of the bottom rail check the L brackets do not stick out past the end of the rail before fixing the bracket to the bottom rail using the two 25 mm screws that are supplied in the kit mark on your deck post where you want the top railing to be making sure it's

4:04 at least 900 mm from the deck centrally place the short side of the L bracket onto the mark and fix the bracket to each deck post using two 25 mm screws place the railing assembly on the fixed post L brackets and secure to the underside of the top rail using two 25 mm screws centrally locate the bottom rail on the deck post before fixing the bottom rail L bracket using two 25 mm screws on each side of the top and bottom rails measure 25 mm from the end of the rail and Mark then drill a counter sunk 3 mm pilot hole approximately 30° through the

4:51 rails and into the Post finally use two 50 mm screws to secure rail to post congratulations your raised deck is now safe and ready to be [Music] enjoyed here is the list of tools you'll need to assemble your railings and here are the materials you'll [Music] use and this is the recommended safety equipment needed

Automatically transcribed from the source video.

More from the Oak Valley Designs DIY Hub

Read the guide Browse all guides

Planning this project? Shop Oak Valley Designs.

How to Assemble Deck Railings | Wickes — step-by-step moments | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.