powered by

Level and Mark Second Bracket Position

From Gallery Wall · Step 5 of 8 · Video by Nailed it

Showing 2:03–2:26 of the source video.

What happens in this clip

Once the first drywall anchor is securely in place, use a long level. Position the level so that it rests against the installed anchor. While holding the level steady and ensuring the bubble is centered (indicating a perfectly horizontal line), use your pencil to mark the exact point where the center of the second bracket will be, aligning it horizontally with the first anchor. Then, create a small indentation with your punch at this newly marked spot, ensuring a precise starting point for the next drill hole.

Goal: Ensure the towel bar will be level and mark the second anchor point precisely

What's used

Tools

  • Level Stanley
  • Pencil
  • Punch

About the full video

This project provides step-by-step instructions for installing a towel bar in a bathroom. It covers measuring the wall and towel bar, marking precise drilling points, installing drywall anchors, mounting the support brackets, and finally attaching the towel bar rod and its decorative holders, including how to adjust for minor measurement discrepancies.

Step 5 of 8: Mark Hanging Points

Using your layout plan and a level, mark the precise spot for each nail or screw. Ensure that the marks are accurate to achieve a straight and balanced installation, especially on an angled wall.

Open this step in the guide

Other videos for this step

Gallery Wall

Plan and install a collection of framed artwork or photos on the wall along a staircase to create a visually appealing display. This involves selecting artwork, planning the layout, choosing appropriate hanging hardware, and executing the installation while considering the angled space.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

powered by