powered by

Install Edge Restraints and Ensure Drainage

From How to Build Paver Steps into a Hill · Step 2 of 11 · Video by QUIKRETE

Showing 0:35–0:54 of the source video. Watch the full video with every moment.

What happens in this clip

Install edge restraints around the excavated perimeter. These restraints, shown as wooden planks, are crucial for stabilizing the pavers and preventing them from settling or shifting over time. Secure the wooden planks by driving nails through them into the ground using a hammer. It's important to set the edges to allow for proper drainage, ensuring a slight slope of approximately 1/4 inch for every 12 feet, moving away from any adjacent structures. Use a spirit level to verify this slope and ensure water runoff is directed away from building foundations.

Goal: Stabilize the paver area and establish proper drainage.

What's used

Tools

  • Hammer
  • Nails
  • Wood screws
  • Spirit Level
  • Long straightedge
  • Wooden Planks
  • Metal edging
  • Concrete curbs

About the full video

This project provides a comprehensive guide on how to construct an outdoor patio or walkway using pavers or natural stone. It covers everything from site preparation and excavation to laying the base materials, placing the pavers, and finally filling and curing the joints for a durable and long-lasting finish. The process ensures proper drainage and a stable surface, enhancing the aesthetics and functionality of your backyard landscape.

What's said in this clip

able underlayment base 1 to 2 in of P sand for leveling and the width of the P then install edge restraints Edge restraints are required to stabilize the pavers and prevent settling and shifting over time edges should be set to allow for proper drainage away from structures and should slope evenly away from structures 1/4 in for every 12 ft is sufficient to allow for rain runoff evenly spread 2 to 4 in of quick

Automatically transcribed from the source video.

Step 2 of 11: Install Retaining Edge (Optional but Recommended)

If using a retaining edge, such as landscape timbers, heavy-duty plastic edging, or concrete blocks, secure it firmly around the perimeter of the excavated area. This edge will help contain the gravel base and provide a stable edge for the pavers. For timber or block edges, ensure they are level and plumb.

Open this step in the guide

Every video in How to Build Paver Steps into a Hill

  1. Step 1: Excavate for Step Base

  2. Step 2: Install Retaining Edge (Optional but Recommended)

  3. Step 3: Add and Compact Paver Base

  4. Step 4: Lay Sand Setting Bed

  5. Step 5: Set First Row of Pavers

  6. Step 6: Lay Subsequent Rows of Pavers

  7. Step 7: Cut Pavers for Edges and Risers

  8. Step 8: Install Risers and Treads

  9. Step 9: Sweep Joint Sand

  10. Step 10: Compact Paver Surface

  11. Step 11: Final Joint Sand Application and Cleaning

Questions about How to Build Paver Steps into a Hill

Is 'beginner' really accurate for this project, and can I realistically complete it in 3 days?

While categorized as beginner, this project involves significant manual labor, especially excavation, moving heavy materials like pavers and base, and meticulous leveling. The 3-day estimate is tight and assumes ideal conditions, good weather, and no major complications. Consider budgeting a full weekend plus some prep and finishing time, and having an extra pair of hands will greatly reduce the effort and time required.

Do I need all the listed tools, especially a plate compactor, or are there alternatives?

A plate compactor is crucial for creating a stable, long-lasting base that prevents your paver steps from sinking or shifting over time; hand tamping is generally not sufficient for this project's durability. Essential tools like a good shovel, level, measuring tape, and string line are indispensable. While renting some specialized tools is an option, the listed equipment is recommended for a successful and durable outcome.

What is the most critical step to ensure my paver steps don't sink or become uneven over time?

The most critical step is thorough excavation and meticulous compaction of the sub-base and paver base layers. Ensure each layer is compacted in 2-inch lifts until it is firm and stable, and verify the slope for proper drainage. Poor or insufficient compaction is the leading cause of paver step failure, leading to sinking and uneven surfaces.

What are the main safety precautions I should take during excavation and compaction?

Always wear appropriate personal protective equipment (PPE) such as work gloves, safety glasses, hearing protection, and sturdy boots. Before digging, always call 811 to locate underground utilities. When operating a plate compactor, be aware of its weight and vibrations, and use a dust mask due to the fine particles that can become airborne.

Is the landscape timber retaining edge always necessary, and what alternatives exist?

The landscape timber retaining edge is optional but highly recommended to prevent soil erosion behind and around your steps, and to provide a stable, defined boundary. Alternatives could include using concrete edge restraints or a treated lumber frame, but timbers offer substantial support when properly secured with rebar stakes, especially on steeper slopes.

How do I accurately calculate the number of pavers and bags of base material I'll need for my specific steps?

First, measure the total square footage of all your step treads and risers. Add a 5-10% overage to this number to account for cuts, waste, and potential breakage. For paver base and sand, calculate the total volume (cubic feet) needed based on your excavation depth and the dimensions of your steps, then divide that by the cubic foot coverage listed on each bag of material to determine the quantity required.

How do I ensure proper drainage for the steps, especially since they are built into a hillside?

Proper drainage is vital to prevent water damage and erosion. Ensure each step tread has a slight forward slope (about 1/8 inch per foot) to direct water away from the hillside. You might also consider installing a French drain or drainage tile at the base or behind the steps to manage subsurface water and heavy runoff from the hill.

How to Build Paver Steps into a Hill

Outline for building durable and aesthetically pleasing steps into a hillside using pavers.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Install Edge Restraints and Ensure Drainage — How to Build Paver Steps into a Hill | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.