How to Build a Paver Patio
Video by QUIKRETE · 3 moments used in Oak Valley Designs's DIY guides · 3:45 long

Moments in this video
- 0:35–0:54 Install Edge Restraints and Ensure Drainage
From How to Build Paver Steps into a Hill, Step 2: Install Retaining Edge (Optional but Recommended)
Install edge restraints around the excavated perimeter. These restraints, shown as wooden planks, are crucial for stabilizing the pavers and preventing them from settling or shifting over time. Secure the wooden planks by driving nails through them into the ground using a hammer. It's important to set the edges to allow for proper drainage, ensuring a slight slope of approximately 1/4 inch for every 12 feet, moving away from any adjacent structures. Use a spirit level to verify this slope and ensure water runoff is directed away from building foundations.
- 1:07–1:36 Spread and Screed the Paver Sand Bed
From How to Build Paver Steps into a Hill, Step 4: Lay Sand Setting Bed
Next, spread 1 to 2 inches of Quikrete Patio Paver Base Sand evenly over the compacted gravel base. This layer serves as the crucial leveling bed for the pavers. To ensure a consistent depth, construct a screed: attach a 1x1 piece of lumber to the bottom edge of a 2x4, positioning it so the 1x1 extends below the 2x4 by the exact thickness desired for your paver sand layer (e.g., 1 to 2 inches). Drag this custom screed across the sand, removing any excess sand in front and adding more behind as necessary. This process will require several passes to achieve a perfectly smooth and level surface.
- 1:36–2:01 Lay and Level the Pavers
From How to Build Paver Steps into a Hill, Step 6: Lay Subsequent Rows of Pavers
With the sand base perfectly level, begin laying the pavers. Start in a corner and work your way outwards to avoid disturbing the prepared sand bed. To ensure straight rows and consistent alignment, use stakes and a string line, or a long straightedge, as a guide. Maintain a consistent joint width between each paver. As each paver is placed, gently tap it into position using a rubber mallet to seat it firmly into the sand. Throughout the laying process, frequently check the pavers with a spirit level to ensure they are square and perfectly level. This regular checking is vital for a smooth and even finished surface.
The guide that use this video
Transcript
0:03 building a p or natural stone patio building a p or natural stone patio or walkway can be a functional and beautiful addition to your backyard landscape and with proper planning attention to detail and a little hard work you can achieve a long lasting result regardless of your skill level and experience Begin by marking the outside dimensions of the project area then excavate to a depth of 4 to 7 in with a shovel allow for 2 to 4 in of a compact able underlayment base 1 to 2 in of P sand for leveling and the width of the P then install edge restraints Edge restraints are required to stabilize the pavers and prevent settling and shifting over time edges should be set to allow for proper drainage away from structures and should slope evenly away from
0:49 structures 1/4 in for every 12 ft is sufficient to allow for rain runoff evenly spread 2 to 4 in of quick re allpurpose gravel into to the excavated area then level the gravel using a tamper compact the gravel base spread 1 to 2 in of quick re patio pav sand over the compacted base the P sand will act as a leveling bed that the pavers will rest in use a 2x4 and a 1x1 to construct a screed to level the PA sand to a consistent depth equal to the width of the P then scre the sand smooth removing the excess sand in front of the screed and adding additional sand behind the screed as necessary this will take
1:35 several passes once your base is level use stakes and a string or a straight edge to align the PA rows starting in a corner lay the pavers outward maintaining a consistent joint width between each pav then tap and level the pavers in place with a rubber mallet check to make sure your pavers are square and level on a regular basis now that the pavers are in position the joints must be filled with sand to hold the pavers in place quick re power lock jointing sand and quickr hardscapes polymeric joining sand are formulated with special dry polymer resin binders and are designed to lock pavers in place power lock joining sand can be used for p joint widths up to 1/2 in for larger
2:23 joints up to 2 in wide and for use with natural stone hardscapes polymeric sand is recommended simply sweep the polymeric sand into the joints with a broom and remove any excess sand from the pavers surface make sure the pavers are clean and dry before application then apply a gentle fine water Mist to the filled joints flooding the surfaces of the pavers and allowing the water to saturate the sand filled joints dampen hourly at regular intervals for 3 hours after placement be sure to avoid flooding the sand onto the pver surface the joints will harden as they dry usually over a period of several days depending on temperature and humidity creating a firm durable paver
3:08 joint once hardened quick re polymeric jointing sand will prevent erosion insects and weed growth the amount of jointing sand you will need varies based on the joint width and Pa thickness a 1/2 in joint will typically require about five bags per 100 square ft of Pap area and 2in Joints will require up to 1 bags per 100 square ft polymer resins are temperature sensitive so temperatures should remain over 35° for a 12 hour period after application
Automatically transcribed from the source video.