How to Build Paver Steps into a Hill
About This Guide
Outline for building durable and aesthetically pleasing steps into a hillside using pavers.
Assembled from 14 on-camera clips by 10 independent creators demonstrating these exact steps.
Tools & Materials
Steps
Excavate for Step Base
Mark the outline of the first step's footprint. Dig down to the required depth, accounting for the thickness of the paver base material (e.g., compacted gravel) and the pavers themselves. The excavated area should be wider than the planned steps to allow for retaining the sides. Ensure the bottom of the excavation is level.
Install Retaining Edge (Optional but Recommended)
If using a retaining edge, such as landscape timbers, heavy-duty plastic edging, or concrete blocks, secure it firmly around the perimeter of the excavated area. This edge will help contain the gravel base and provide a stable edge for the pavers. For timber or block edges, ensure they are level and plumb.
Add and Compact Paver Base
Add a layer of coarse gravel (e.g., crushed stone or paver base material) to the excavation. Spread it evenly to a depth of 4-6 inches. Compact the gravel thoroughly using a hand tamper or a plate compactor. Repeat in 2-3 inch layers until the desired base depth is reached and it is firm and level, slightly below the final paver height.
Lay Sand Setting Bed
Add a layer of coarse sand (e.g., coarse masonry sand or concrete sand) over the compacted gravel. Aim for a consistent thickness of about 1 inch. Use screed rails (pipes or lumber) to strike off the sand to a perfectly level surface, ensuring it is slightly below the final desired paver height to account for paver thickness.
Set First Row of Pavers
Place the first paver onto the sand bed, pressing it down gently. Use a rubber mallet to tap it into place, ensuring it is flush with the retaining edge (if used) and level. Continue laying pavers for the first row, maintaining consistent joint widths (typically 1/8 to 1/4 inch). Check for levelness across multiple pavers and along the row.
Lay Subsequent Rows of Pavers
Lay subsequent rows of pavers, staggering the joints between pavers by at least one-third of a paver's length. This 'running bond' or 'offset' pattern provides structural integrity. Ensure each paver is level and firmly seated in the sand. Check for alignment with the previous row and maintain consistent joint spacing.
Cut Pavers for Edges and Risers
For the vertical 'risers' between step treads, you may need to cut pavers to size. Use a wet saw or a specialized paver saw to make precise cuts. Measure carefully before cutting. Ensure cut edges are clean and smooth. Secure cut pavers with construction adhesive if necessary, especially for risers.
Install Risers and Treads
For each step, first install the riser pavers against the back of the previous tread. Ensure they are plumb and securely set. Then, lay the tread pavers for the current step on top of the sand bed, ensuring they are level and firmly seated. Use construction adhesive to bond risers to treads if desired for extra stability, particularly on steeper slopes.
Compact Paver Surface
Use a plate compactor with a protective pad (or a hand tamper for small areas) to go over the entire surface of the paver steps. This vibration will settle the pavers into the sand bed and help lock them together with the joint sand. Make multiple passes in different directions.
Final Joint Sand Application and Cleaning
After compacting, sweep away any loose excess sand from the paver surface. If you used polymeric sand, you may need to lightly mist the surface with water according to the manufacturer's instructions to cure the sand. Clean the surrounding area of any debris.
Frequently Asked Questions
Is 'beginner' really accurate for this project, and can I realistically complete it in 3 days?
While categorized as beginner, this project involves significant manual labor, especially excavation, moving heavy materials like pavers and base, and meticulous leveling. The 3-day estimate is tight and assumes ideal conditions, good weather, and no major complications. Consider budgeting a full weekend plus some prep and finishing time, and having an extra pair of hands will greatly reduce the effort and time required.
Do I need all the listed tools, especially a plate compactor, or are there alternatives?
A plate compactor is crucial for creating a stable, long-lasting base that prevents your paver steps from sinking or shifting over time; hand tamping is generally not sufficient for this project's durability. Essential tools like a good shovel, level, measuring tape, and string line are indispensable. While renting some specialized tools is an option, the listed equipment is recommended for a successful and durable outcome.
What is the most critical step to ensure my paver steps don't sink or become uneven over time?
The most critical step is thorough excavation and meticulous compaction of the sub-base and paver base layers. Ensure each layer is compacted in 2-inch lifts until it is firm and stable, and verify the slope for proper drainage. Poor or insufficient compaction is the leading cause of paver step failure, leading to sinking and uneven surfaces.
What are the main safety precautions I should take during excavation and compaction?
Always wear appropriate personal protective equipment (PPE) such as work gloves, safety glasses, hearing protection, and sturdy boots. Before digging, always call 811 to locate underground utilities. When operating a plate compactor, be aware of its weight and vibrations, and use a dust mask due to the fine particles that can become airborne.
Is the landscape timber retaining edge always necessary, and what alternatives exist?
The landscape timber retaining edge is optional but highly recommended to prevent soil erosion behind and around your steps, and to provide a stable, defined boundary. Alternatives could include using concrete edge restraints or a treated lumber frame, but timbers offer substantial support when properly secured with rebar stakes, especially on steeper slopes.
How do I accurately calculate the number of pavers and bags of base material I'll need for my specific steps?
First, measure the total square footage of all your step treads and risers. Add a 5-10% overage to this number to account for cuts, waste, and potential breakage. For paver base and sand, calculate the total volume (cubic feet) needed based on your excavation depth and the dimensions of your steps, then divide that by the cubic foot coverage listed on each bag of material to determine the quantity required.
How do I ensure proper drainage for the steps, especially since they are built into a hillside?
Proper drainage is vital to prevent water damage and erosion. Ensure each step tread has a slight forward slope (about 1/8 inch per foot) to direct water away from the hillside. You might also consider installing a French drain or drainage tile at the base or behind the steps to manage subsurface water and heavy runoff from the hill.
Questions about your project or which product fits? Oak Valley Designs's team is happy to help. Mon–Fri 9–5 ET
Related Guides
See All
how to give your staircase a makeover with carpet stair treads

how to install carpet stair treads to make hardwood stairs safe for dogs

how to measure stairs to choose the right size carpet stair treads