Railway Sleeper Steps ~ The Right Way To Build Them
Video by Skill Builder · 2 moments used in Oak Valley Designs's DIY guides · 13:32 long

Moments in this video
- 0:01–0:43 Plan and Measure Embankment
From How to Build Backyard Steps with Railroad Ties or Landscape Timbers, Step 1: Plan the Step Location and Dimensions
Begin by assessing the embankment where the steps will be built. Clear any existing debris, such as hardcore, that may be in the way. Drive a wooden peg into the ground to mark the desired landing point for the top step. Use a long straight edge and a measuring tape to accurately determine the total 'run' (horizontal distance) and 'rise' (vertical height) of the embankment. These measurements are crucial for calculating the number of steps, their individual rise, and their tread depth to ensure a comfortable and safe ascent/descent. The video shows an overall run of 255 inches and a rise of 92 inches.
- 0:01–0:59 Site Assessment and Initial Clearing
From How to Build Backyard Steps with Railroad Ties or Landscape Timbers, Step 1: Plan the Step Location and Dimensions
Begin by assessing the embankment where the steps will be built. Use a long straight edge (e.g., a long spirit level or a string line) and a peg to mark the landing point for the top step. Measure the total 'run' (horizontal distance) from the top landing point to the base of the embankment and the 'rise' (vertical height) to determine the number and depth of steps required. In this project, the overall run was 255 inches and the overall rise was 92 inches. Before starting construction, clear any existing hardcore, debris, or vegetation from the area. A tipper truck can be used to efficiently remove larger quantities of material.
The guide that use this video
Transcript
0:04 So, we're going to form some steps up this embankment. It's really tricky for the client to get up there, so we're going to make it easier. We're going to clear this hardcore away first, cuz it's right in our way, as usual. We've set a peg in. This will be our landing point for our top step. And down there, you can see a bit of cant rail with that post. This is so we can get our overall run. So, we put a level what we I've used a really long straight edge and attach it to there, measured that, and it comes at 255 in. And then we can take our overall rise from that point down to the [music] ground, which happens to be 92 in. And from there, we can work out how many steps and what depth they're going to be.
1:35 Each step was constructed from spruce railway sleepers, ripped down to 177 mm. The sleepers were supplied in 2.4 m lengths, cut into 1,200 mm front sections, with 600 mm side pieces fixed to form the U-shape boxes that make up each step. >> With the U-shaped boxes built, excavation can begin.
2:21 >> [music] >> The aim is to create a level foundation for every step while following the natural slope of the hill.
3:15 Each sleeper box is bedded onto a weak concrete mix using a 10 to 1 ballast to cement ratio. This provides a stable base while still allowing a degree of flexibility, making it ideal for landscaping projects like this. Take time to check every sleeper for level before moving on. Small errors early in the build become much more noticeable as the staircase progresses. The steps are reinforced using rebar pins.
4:50 The timbers are fixed together using 250-mm hex head timber screws. Each screw is carefully countersunk before being finished with timber dowels to create a clean, professional appearance. The timber screws provide the structural connection between the sleepers, while the rebar pins help anchor the completed steps into position and resist movement over time. Using both methods together creates a much stronger, longer-lasting installation than relying on either one alone.
6:16 >> Each step is positioned onto its concrete bed, checked for level, aligned, and fixed before work continues onto the next one.
7:08 Once the sleeper boxes are in place, Groundtex woven geotextile membrane is rolled beneath and around the construction. This acts as a durable weed barrier while still allowing rainwater to drain naturally through the structure.
8:35 >> Next comes MOT type 1. Rather than installing the full depth in one go, it's added in 50 mm layers, compacting each layer thoroughly before adding the next. This is one of the most important parts of the project. Compacting [music] thin layers creates a much stronger foundation and greatly reduces the risk of future settlement. Continue until you've achieved approximately 150 mm of well-compacted MOT type 1. Timber protection is an important step that shouldn't be overlooked. The sleepers were treated with Sadolin Classic All Purpose Wood Stain in Jacobean Walnut, giving them a rich finish while helping protect the timber from the weather. The buried ends of every sleeper were also coated with Blackjack [music] Bitumen Paint. Although these areas won't be visible
9:21 once the project is complete, they're the parts most [music] exposed to ground moisture, so giving them additional protection will help maximize the lifespan of the installation. With the structure complete, the final stage is filling each step. We use long rake spar Cotswold decorative chippings, which provide an attractive finish while still allowing water to pass freely through the steps. >> [music] >> Combined with the ground tech membrane and the compacted MOT type 1, this creates a construction that drains efficiently, discourages weed growth, and remains stable throughout the seasons. There's one final part of this project worth talking about because [music] it came about after the steps were
10:08 completed. During the original build, Sam recommended putting a retaining wall on the left-hand side of the steps. However, at the time the customer decided that they didn't really want one. And initially, the steps were completed without it. But, after a few weeks, the reality of the site became clear. The bank on the left-hand side was continually shedding soil and mud, which was finding its way down onto the steps. So, the customer came back to Sam and decided that after all a retaining wall was needed. The solution was to build a retaining wall from the same spruce railway sleepers as the steps. The sleepers were reinforced with rebar pins and secured using 150 mm forge fast
10:53 timber screws. This creates a strong connection between the sleepers while the rebar pins help anchor the structure and resist movement.
12:47 And once the wall was added, it not only solved the problem of mud falling onto the steps, but also gave the whole stairway a much more finished appearance. So, the moral of this story is don't argue with Sam. You'll regret it. With strong foundations, proper drainage, reinforced construction, and protected timber, these railway sleeper steps are built to [music] provide years of reliable service. If you found this guide helpful, give the video a like, subscribe for more landscaping projects, and let us know in the comments what you'd like to see us build next.
Automatically transcribed from the source video.