How to Frame Stairs Squeak Free Stairs
Video by AwesomeFramers · 1 moment used in Oak Valley Designs's DIY guides · 35:05 long

Moments in this video
- 8:38–11:15 Install Risers
From How to Build Basement Stairs, Step 7: Cut and Install Risers (Optional but Recommended)
Install the risers (2x8s) into the pre-cut stair stringers. Use a hammer to tap the risers firmly into place, ensuring a snug fit against the stringer. The bottom of the risers should be cut 1/8 inch shorter to allow for potential subfloor variations and prevent squeaking. Use a cordless drill with structural screws to secure the risers to the stringers. Apply leg pressure to hold the riser in place while driving the screw. Even if a screw misses, it can be removed and redriven without compromising the overall structure, demonstrating the flexibility of structural screws over nails.
The guide that use this video
Transcript
0:02 okay now that the guide is set i have to rip down some two by ten into two bite risers now it's true you could use a table saw you could snap a line and rip it you could scrap a line and free hand rip it you could pinch the base plate and rip it there's a thousand ways to do it for me i like to use this skate plate it stays on the saw full time because it makes repetitive cutting idiot proof and when it's idiot proof i find that i'm actually a little faster the 30 seconds or even let's say a minute to set it up that's well worth it well worth it in my opinion lumberyard forgot our material and for the price of four it's not worth going and getting them
0:48 so i have the depth set and i have it hanging just past the forks i know some guys that have cut forks before leave enough room here for the side of that guide what i like about using a guide in this case is i'm going to have perfect rips i've only measured once and i don't have to use my brain okay so i'm going to cut off the waned or barked edge because hey why not
1:39 fyi this dewalt saw really does a great job ripping and that's why the skate plate stays on it full time so that's it i got one two three four that's all i need you can see how the skateplay works literally skates okay what i'm going to do is essentially a repeat of what we did for the stair stringers with one modification
2:30 i'm going to gain cut all these it's cold so you don't want my thing you know if you grab material and it's cold if you've ever bent back your nails it is not as much fun as it sounds okay now that these are all ripped exactly the same length i'm just going to line them up i want to minimize cutting and marking [Music] okay nice and flush okay all flush everything's the same width now i'm just going to go through and mark my length 35 and a half then i'm going to go 35 and 9 16 to account for the blade 35 and 9
3:17 wound 35 and 9. so i've laid out one time and i'm going to get 2 4 6 8. and right there something tickled my brain i was about to have way more than eight risers i'm blaming it on frozen dendrites so i'll get eight risers out of this and then i'll do the second batch
4:59 the goal was not to let them all hit the ground no all right i'm an idiot count it wrong okay so i like to rip the treads out of three quarter advantech it makes it really easy because our subfloor is three-quarter advantage so whenever you're making adjustments for risers and subfloor it's all the same number so i have 10 inches as my tread
5:44 plus an inch and a quarter overhang so if you can do the math with me 11 and a quarter so what i'm going to do is i'm going to start the cut and that's how i'm going to set the guide [Music] and i want to set the depth it's about there so now the saw is nice and parallel in the cut makes it really easy to just to set the depth okay lock it in make sure it's not going to move on us off to the races come on
6:47 i have a sacrificial 2x6 so if i do cut into it it's okay as i can freehand cut perfect rips with a guide or a track saw or a table saw 35 and a half i'm going to come from this side so that i have factory 35 and a half
7:43 i'm going to put this guy in the middle hey we're making identical snowflakes that side's flush factory and factory batch number one make sure they didn't move because this stuff is kind of slippery okay save these pieces we will definitely be able to use them later
8:40 okay we're on the home stretch let's get these things in [Music] so you can already see that we're spaced off of the wall what i like to do is check the bottom right on the money see remember that bottom cut i went ahead and cut it an eighth of an inch it's just the way things always work out it's easier to do that and if i need to glue shims i could but i don't think i've ever actually had to do that so because we have a two by stringer and then a two by spacer board then i need to fasten it with these screws structural screws so that's what i'm gonna do so i'm going to get it started i'm going to put pressure against it
9:26 with my leg and i'm going to watch yeah i need to come up just a hair i want to be right on that blue line [Music] right on the money so i like to use these screws because it clamps so well that there's never going to be movement on the stringer yeah and even though i don't probably don't need to put one there i'm gonna do it because if you were to get a squeak here later you have to get under this it's not a not a fun thing [Music] yeah see that guy missed
10:15 [Music] that's the beauty of screws right if i something goes a little wonky it's not the end of the world okay so that should have been number one and this is number four remember that from cutting the stringers that way even if there's some discrepancies they're just going to plane out we're not building furniture [Music] nice and strong i'm going to go ahead and do that to both of these down at the bottom
11:00 yeah started nice and straight make sure it's on the floor boom and just for giggles i'll do the bottom now what i'm going to do is i'm going to put each of my stringers in and i'm going to block them as i go i pre-cut them hello hello all right am i out of the gas i think so
11:57 okay not a big deal sir it still beats rolling out a compressor just trying to show it to the camera that is all there is to it now that's all there is to it okay let's make sure it works then i'm gonna go get rid of that other can
13:06 so you'll notice yesterday i built the wall behind the stairs because it's a lot easier when there's no stringers a whole lot more access so i'm holding the stringer with my thighs when i was younger i prefer to do that stuff later during pickup framing now that i'm older it's not as much fun this usually happens nine and 11.
14:15 just a hair loose that's okay if you beat these in you're going to cause both splits don't forget that these outside stringers are going to be lagged or structurally screwed to the wall and then with two by eight risers essentially that's almost like a beam so the the stair itself is not even really supported at the top or the bottom but rather to the sides okay so your first riser has to have the tread thickness removed so this is just how i like to do it get them all in place then i'm going to
15:01 glue because otherwise you straddle these things and you end up with glue all over your crotch and no one wants that okay one extra because it was easier just to cut two pairs okay so i'm just marking layout because i've already got it i'm gonna go ahead i think i've already got that so don't forget to take the height of your riser off of the first tread so what i like to do is i actually put the glue on the riser material itself
15:53 as opposed to the stringers what happens is it can tend to kind of roll off this is just a lot easier i'm going to show you in just a moment it's a little cold it's like 32 degrees right now it was 29 when i got here this morning so i had the glue heating up on the forklift heater i have a heater underneath the seat great place to warm up your your hands or your gloves okay so i'm going to show you in just a moment now what i like to do here even though i have ripped these just a little on the short side because i don't want it rubbing i can take care of that
16:39 later okay here's what i want to show you so notice that it came out as foam like the bottom but look here at the top now it's reduced to gel so that's a polyurethane gel now since i'm right handed i typically start on my right and i line up that side then this side i'm just a hair off but remember i already screwed that riser so i'm just going to leave it now because this is a pretty short run of stairs i probably don't need to go to the middle but i'm going to just to show you so i line up that edge nail it check that that looks nice and square now i can lift this up what i'm going to
17:26 do is come to this side just a hair long that's okay i have the room see how i'm really not going to yank that so i'm just not going to worry about it go just a little [Applause] okay now once i've lined these up to their marks nice and tall make sure that they're square okay so since the run i should have done that to begin with but like an idiot i went up there i always do dumb things with camera
18:13 okay so get rid of that so you're not hearing it the reason why instead of a center stringer we went here is because generally 12 to 15 inches in is your walk line so people basically are going to put their feet here and here nice solid backing even years down the road these stairs are not going to squeak i go with a two by eight riser because it acts kind of like a beam times seven in this case super stout it's worth a little bit of money if you come back for call backs everything you saved you just wasted now we can just go into production mode see how i lift that up just to keep things square see why i like the pass load i'm not going to drag a hose or anything
19:04 [Applause] since i have hearing protection in i'm not really bothered by the fan [Applause] nice and simple so this is just a sight built stair again carpet grade now i can walk on these i don't have to worry about them see the gel i don't have to worry about them snapping off
19:57 [Applause] okay nice and simple [Applause] so for shooting on the advantech treads i like to use the little galvey ring shank i have always been a fan of passload nails they're really difficult to pull okay so what i'm gonna do i have seven one two three four five six seven i'm going to go ahead and glue the back of these
20:44 and i'm just going to go ahead and make a bit of a mess since they're stacked nice and tight honestly i don't really think this step is important anymore but i do it because i just don't want to deal with squeaks later
21:53 okay so it came out as foam you can see it's already reducing up there so i'm going to turn this off because i'm not going to use it for a little bit and i'm going to shake it some more because it's cold you can already see that that's reduced so i'll give it just a second in the heat of the summertime i'm honestly about 50 degrees i wouldn't have to do this but we've been in the low 20s all week and then this morning i think it was 20 28 29 when i left the house i think it was about 30 when i got here
22:44 now i'm going to go a little slower here i want to make sure that i don't miss [Applause] i'm not going to nail the back of these and the reason is it's just going to split out the advantage uh [Applause] uh [Applause]
24:07 come on so [Applause]
25:02 so i've got my marks come on [Applause] okay so here's what i'm gonna do remember i have an inch and a quarter roughly i'm gonna go ahead and scribe center lines get a nail right into that nosing clamp that glue i want a nice connection from the riser and the tread to the riser [Applause] so this is why i like to use 2x8 risers
25:49 i have a lot of meat too many nails i really just need to go one in between all of those put too many at the bottom well not really too many but just an unnecessary amount okay that is the first flight done now i have to go and build a little half platform which i'm not gonna show because i'm in a hurry build a half platform because i have to have a rise in the middle of that landing and then those bad boys will go up above
29:56 ah [Applause]
33:11 so [Applause]
34:25 okay we are done i'll add guardrail on monday when we get here sit down step landing all the way down okay i'm gonna get out of here
Automatically transcribed from the source video.